73,447 sections across 0 California regulatory chapters.
§ 499.1. Scope.
0.9K chars
(a) These regulations implement Article 8 of Chapter 5 of Division 26 of the Water Code, which is the Yuba Feather Flood Protection Program of the Safe Drinking Water, Clean Water, Watershed Protection, and Flood Protection Act of 2000, approved by voters March 7, 2000. They esta…
§ 3027. Withdrawal of Application.
0.2K chars
If an applicant requests withdrawal of his application for plan approval, he may make written request for refund of unspent fees, except that plan filing fees shall not be refundable.
§ 5. Delegations.
5.2K chars
(a) For the purposes of this division, all permitting duties of the board, including but not limited to the review and approval of encroachment permit applications and administrative permit revocations pursuant to sections 28 and 28.1 are hereby delegated to the Executive Officer…
§ 451.6. Contract Requirements.
3.1K chars
(a) Prior to entering into a contract, representatives of the Department may visit the project site to assess its conditions and needs, and then meet with all the project sponsors, co-sponsors, endorsers, and any other local officials, agencies and/or organizations with an intere…
§ 3020. Manufacturing Requirements.
0.6K chars
Every manufacturer of factory-built housing subject to requirements of this subchapter shall obtain plan approval for each model, and shall obtain insignia for each unit manufactured. The manufacturer shall maintain a quality control program, and the units shall be manufactured i…
§ 3047. Changes to Approved Plans or Quality Control Manual.
0.5K chars
When the manufacturer proposes to change the approved plans or quality control manual, two sets of the revised plans or quality control manual shall be submitted to the department or design approval agency for approval. The submission shall be accompanied by an application made i…
§ 705. Form of Application.
0.2K chars
An application for a permit to appropriate water shall be typewritten or legibly written in black ink, and filed in duplicate upon a printed form furnished by the board.
§ 3053. Prototype.
1.5K chars
(a) Notwithstanding any other provisions of this subchapter, a manufacturer may build, prior to plan approval, one prototype of each model of a dwelling or individual dwelling room or combination thereof, he proposes to manufacture provided: (1) The manufacturer informs the inspe…
§ 383. Estimate of Value of Services.
1.0K chars
Before any discussion with any firm concerning fees may take place, the Director shall cause an estimate of the value of such services to be prepared. This estimate may be based on such factors as a market survey, comparison with fees paid to other departments' or agencies' contr…
§ 1518. Standard Plan Approval.
0.6K chars
(a) A standard plan approval may be obtained from the department for a plan for accessory buildings or structures. Department-approved plans shall be accepted by the enforcement agency as approved for the purpose of obtaining a construction permit when the design loads are consis…
§ 3835. Complete, Incomplete, and Valid Applications.
1.1K chars
(a) Upon receipt of an application, it shall be reviewed by the certifying agency to determine if it is complete. If the application is incomplete, the applicant shall be notified in writing no later than 30 days after receipt of the application, of any additional information or …
§ 4011. Inspection Approval.
4.7K chars
(a) Any person manufacturing, owning, selling, offering for sale, renting, leasing, altering or converting any vehicle may request the department to make an inspection of such vehicle for approval pursuant to this chapter. (b) Request for inspection shall be made in writing to th…
§ 638.3. Standardized Conduct for Validation of Water Loss Audits.
1.9K chars
(a) All water loss audits shall receive a Level 1 validation. (b) A Level 1 validation shall include: (1) An interview between the water audit validator and the person or persons who prepared the water loss audit, and any member of the utility staff with information that the wate…
§ 597. Agricultural Water Measurement.
2.6K chars
Under the authority included under California Water Code § 10608.48(i)(1), the Department of Water Resources (Department) is required to adopt regulations that provide for a range of options that agricultural water suppliers may use or implement to comply with the measurement req…
§ 618. Departmental Determination of Application Completeness.
1.3K chars
The Department is statutorily required to determine if an encroachment permit application is complete. The Department shall either approve or deny an application based on a determination of completeness. (a) The Department, within thirty (30) days of receipt of the application, s…
§ 1759. Time to Bring Action.
0.6K chars
Any cited person, owner, or other aggrieved person having any objections as to any proceedings or actions undertaken by the hearing officer conducting the hearing, or the enforcement agency in ordering abatement or correction of any violation, shall bring an action in any court o…
§ 32. Space, Occupancy, and Maintenance.
0.8K chars
Except as otherwise permitted or required by Health and Safety Code, Division 13, Part 1.5, this subchapter or by other applicable laws and regulations, and the provisions of the 1997 Edition of the Uniform Housing Code, Chapters 4, 5, and 6, and Sections 701.2 and 701.3, as adop…
§ 1186. Lot Receptacles.
0.7K chars
(a) A receptacle used to supply electrical energy to a unit shall conform with the American National Standards Institute-National Electrical Manufacturers Association (ANSI-NEMA) Standard, WD-6, 1997 for one of the following configurations: (1) 125/250 volts, 50-amperes, 3 pole, …
§ 4015.5. Prototypes General.
1.2K chars
Regardless of the provisions of these regulations, a manufacturer may build, prior to obtaining an approved structural plan, one (1) prototype of each model he proposes to manufacture provided: (a) The manufacturer informs the department in writing that he proposes to build a pro…
§ 830. Procedure on Change of Address.
0.4K chars
Parties interested in applications, permits, and licenses shall promptly advise the board of changes of address. Whenever a notice is required by law or these regulations to be sent to a party, such notice will be mailed to the party at the most recent address supplied to the boa…
§ 1336.1. Listed Tiedown Assemblies.
4.5K chars
Tiedown assemblies that are not part of an engineered tiedown system shall be listed as having been tested and found to be in compliance with the requirements of this section. (a) A tiedown assembly consists of the ground anchor component and anchoring equipment. Anchoring equipm…
§ 1338.1. Roof Live Loads for Mobilehome Parks Located Above 4000 Feet in Elevation.
1.5K chars
(a) Notwithstanding the provisions of Section 1338, if an MH-unit that is proposed to be installed within a mobilehome park located above 4,000 feet in elevation does not have the capacity to resist the minimum snow loads as established for residential buildings by local ordinanc…
§ 4033. Insignia Not Required.
1.8K chars
(a) Vehicles falling into any of the following categories are not required by this subchapter to bear a department insignia or HUD label: (1) Any mobilehome or trailer coach manufactured prior to September 1, 1958, any commercial coach or trailer coach designed for industrial, pr…
§ 2180. Lot Service Equipment.
1.3K chars
(a) The rating of the overcurrent protection in the lot service equipment shall not exceed the rating of the connected feeder assembly. Lot service equipment may contain any or all of the approved receptacles conforming with section 2186 of this chapter. (b) Lot service equipment…
§ 436. Form and Filing of Application.
0.6K chars
Applicants for a loan under the act for the preparation of a feasibility report on a proposed project shall file an application for the loan on a form provided by the department. Such application should be filed after receipt of a favorable written reply from the department on a …
§ 814. Advance Notice.
0.7K chars
At least seven days before wrestling exhibitions, the promoter shall furnish the commission an advance notice giving the names of the wrestlers to be used in the exhibitions. The commission shall be promptly notified of any changes or additions to this notice. The forms for this …
§ 681. Time to Complete and Extensions Thereof.
0.7K chars
Upon receipt of a request for an extension of time to complete an application, if good cause is shown the board will grant such time as appears reasonably necessary, Good cause requires a satisfactory showing that a diligent effort has been made to complete the application within…
§ 1358. Drain, Unit.
0.9K chars
(a) An MH-unit shall be connected to the lot drain inlet by means of a drain connector consisting of approved pipe not less than schedule 40, with listed and approved fittings and connectors, and shall not be less in size than the MH-unit drain outlet. A listed and approved flexi…
§ 2220. Lot Gas Shutoff Valve.
0.7K chars
(a) Each lot shall have a gas shutoff valve, listed for its intended use by a department-approved listing agency, installed in a readily accessible location upstream of the lot gas outlet. (b) The valve shall be located on the lot gas riser outlet at a height of not less than six…
§ 862. Russian River, Special.
9.9K chars
Budding grape vines and certain other crops in the Russian River watershed may be severely damaged by spring frosts. Frost protection of crops is a beneficial use of water under section 671 of this chapter. During a frost, however, the high instantaneous demand for water for fros…
§ 4035. Denial of Insignia.
0.5K chars
Should inspection reveal that a manufacturer is not manufacturing vehicles according to plans approved by the department, and such manufacturer, after having been served with a notice setting forth in what respect the provisions of this chapter have been violated, continues to ma…
§ 4042. Application Requirements.
5.7K chars
(a) Any person proposing to make an alteration, conversion, or addition to a vehicle bearing or required to bear an insignia of approval, or Title VI (24 C.F.R.) label, shall file an application with, and obtain approval of, the department. (b) Applications for alteration, conver…
§ 457. Administrative Fee.
0.3K chars
Payment of an administrative fee for approved loans shall be required as authorized by Section 13862 of the Water Code. The administrative fee shall be paid by the supplier in the amount of 3 percent of the approved loan. The fee may be paid on the same terms and conditions to be…
§ 695. Unappropriated Water.
0.3K chars
A permit can be issued only for unappropriated water. Unappropriated water does not include water being used pursuant to an existing right, whether the right is owned by the applicant, or by another person. (For the relationship between new applications and existing rights, see S…
§ 470. Contract Provisions.
3.2K chars
(a) The following provisions apply to loan contracts and loan-grant contracts: (1) Entities other than public agencies shall agree to provide security for repayment of the loan. This may include a provision for a lien on the domestic water system and associated facilities and imp…
§ 691. Joint Applications.
0.6K chars
(a) Two or more persons proposing to share in the use of water stored in a reservoir or proposing a common place of use (such as the irrigation of jointly owned property), shall file a joint application. (b) A joint application shall clearly indicate the nature and extent of the …
§ 1366. Statement of Mobilehome Installation Acceptance or Certificate of Occupancy.
0.9K chars
(a) A “Mobilehome Installation Acceptance” or “Certificate of Occupancy” shall not be issued until it is determined that the MH-unit installation complies with the provisions of this chapter. The enforcement agency shall provide copies of the statement of MH-unit installation acc…
§ 724. Filing and Application Without Maps--When Allowed.
0.1K chars
For preliminary purposes, the application may be filed without maps or with such maps as are within the present ability of applicant to supply.
§ 1610. Abatement.
0.5K chars
(a) The registered owner of a unit, accessory building or structure, or building component that is constructed, altered, converted, used, or maintained in a manner that constitutes a violation is required to abate the violation. (b) The legal owner of the property, or park owner …
§ 489.1. Plans and Specifications.
0.5K chars
Before commencing construction, each Supplier shall provide detailed plans and specifications to the Department of Health Services for review and approval by a registered Civil Engineer employed by the Department of Health Services. Unless otherwise authorized in writing by the D…
§ 751. Answers to Protests.
0.4K chars
The applicant should file an answer to each protest. To facilitate resolution of protests, answers shall be filed not later than 15 days following notification of acceptance of the protest, unless additional time is allowed by the board. A copy of the answer shall be served on th…
§ 1612. Final Notice Requirements and Appeals.
1.7K chars
(a) If the initial notice from the enforcement agency has not been complied with on or before the date specified in the notice, the enforcement agency may institute proceedings against the cited person or entity. (1) The enforcement agency shall issue to the cited person, the las…
§ 738. Protests to Petitions.
0.2K chars
Protests to either a petition for assignment or release from priority or to a proposed completed application must be submitted within the time stated in the notice issued by the board or such further time as may be allowed for cause by the board.
§ 2752. Request for Informal Conference.
2.6K chars
(a) The following informal conference process shall be available to a cited person who is required to respond to a notice of violation ordering abatement or correction of a violation of this chapter, the Health and Safety Code, or any other applicable provision of law, and shall …
§ 1000. Application and Scope.
1.6K chars
(a) Except as otherwise provided in sections 18300, 18303, and 18304, Health and Safety Code, the provisions of this chapter shall apply to the construction, use, maintenance, and occupancy of mobilehome parks, mobilehome and special occupancy lots, permanent buildings, accessory…
§ 2014. Required Reporting of Changes in Park Status.
1.5K chars
(a) An operator of a park shall submit to the enforcement agency an application for an amended annual permit to operate within thirty (30) days of any change in the information related to the annual permit to operate. Changes in information shall include, but not be limited to: (…
§ 4415. Definitions.
1.7K chars
(a) Definitions contained in the California Code of Regulations, Title 24, Part 4, California Mechanical Code (CMC) and the following definitions shall apply to this subarticle. (b) Automatic Pilot Device. A device employed with gas-burning equipment that will either automaticall…
§ 1017. Technical Service Fee.
0.4K chars
(a) Fees for technical services provided by the enforcement agency shall be: (1) Two hundred thirty-eight dollars ($238) for the first whole hour or fractional part thereof of technical service time. When the technical service time exceeds one hour, the following fees shall apply…
§ 4514. Minimum Requirements.
1.0K chars
(a) The provisions of this subarticle relating to plumbing equipment and installations apply to all commercial modulars sold, offered for sale, rented, or leased within this State. The provisions of this subarticle also are applicable to the alteration or conversion of plumbing e…
§ 833. Presumption Based on Ownership of Place of Use.
0.3K chars
When an application, permit, or license stands upon the records of the board in the name of the owner of the place of use the right will be considered appurtenant to the land unless there is evidence to the contrary. It will generally be presumed that the water right passes with …