Pub. Util. Code § 353.15 Section 353.15
0.9K chars
(a) In order to evaluate the efficiency, emissions, and reliability of distributed energy resources with a capacity greater than 10 kilowatts, customers that install those resources pursuant to this article shall report to the commission, on an annual basis, all of the following …
Pub. Util. Code § 353.2 Section 353.2
1.0K chars
(a) As used in this article, “ultraclean and low-emission distributed generation” means any electric generation technology that meets both of the following criteria: (1) Commences initial operation between January 1, 2003, and December 31, 2008. (2) Produces zero emissions during…
Pub. Util. Code § 353.3 Section 353.3
1.6K chars
(a) The commission shall require each electrical corporation under the operational control of the Independent System Operator as of January 1, 2001, to modify its tariffs so that all customers installing new distributed energy resources in accordance with the criteria described i…
Pub. Util. Code § 353.5 Section 353.5
0.4K chars
Each electrical corporation, as part of its distribution planning process, shall consider nonutility owned distributed energy resources as a possible alternative to investments in its distribution system in order to ensure reliable electric service at the lowest possible cost. (A…