568 chapters · 8,194 sections in this title.
Pub. Res. Code § 4582.5 Section 4582.5
0.3K chars
Timber harvesting plans shall be applicable to a specific piece of property or properties and shall be based upon such characteristics of the property as vegetation type, soil stability, topography, geology, climate, and stream characteristics. (Added by Stats. 1973, Ch. 880.)
Pub. Res. Code § 4582.6 Section 4582.6
3.6K chars
(a) Upon receipt of the timber harvesting plan, the department shall place it, or a true copy of the plan, in a file available for public inspection in the county in which timber operations are proposed under the plan, and, for the purpose of interdisciplinary review, shall trans…
Pub. Res. Code § 4582.7 Section 4582.7
3.0K chars
(a) The director shall have 30 days from the date that the initial inspection is completed (10 of these days shall follow the date of final interagency review) or, if the director determines that the inspection need not be made, 15 days from the date of filing, as specified in Se…
Pub. Res. Code § 4582.71 Section 4582.71
1.9K chars
(a) A timber harvesting plan may not be approved if the appropriate regional water quality control board finds, based on substantial evidence, that the timber operations proposed in the plan will result in a discharge into a watercourse that has been classified as impaired due to…