371 chapters · 7,566 sections in this title.
Pub. Util. Code § 740.18 Section 740.18
1.4K chars
(a) The purpose of this section is to require the commission to review, modify, if appropriate, and decide whether to approve, two pending (as of July 1, 2020) transportation electrification infrastructure applications, based on previously approved activities, that are designed t…
Pub. Util. Code § 740.19 Section 740.19
6.3K chars
(a) The purpose of this section is to change the commission practice of authorizing the electrical distribution infrastructure located on the utility side of the customer meter needed to charge electric vehicles on a case-by-case basis to a practice of considering that infrastruc…
Pub. Util. Code § 740.2 Section 740.2
1.8K chars
The commission, in consultation with the Energy Commission, State Air Resources Board, electrical corporations, and the motor vehicle industry, shall evaluate policies to develop infrastructure sufficient to overcome any barriers to the widespread deployment and use of plug-in hy…
Pub. Util. Code § 740.20 Section 740.20
6.0K chars
(a) (1) The commission, the Energy Commission, and the State Air Resources Board shall require that all electric vehicle charging infrastructure and equipment located on the customer side of the electrical meter that is funded or authorized, in whole or in part, by those state en…