371 chapters · 7,566 sections in this title.
Pub. Util. Code § 933.5 Section 933.5
8.4K chars
(a) The commission shall determine the criteria for timely service for electric customers to be energized. The criteria shall include, but are not limited to, all of the following: (1) Categories of timely electric service through energization, including, but not limited to, both…
Pub. Util. Code § 934 Section 934
2.6K chars
(a) On or before September 30, 2024, the commission shall do both of the following: (1) Establish reasonable average and maximum target energization time periods. The targets shall ensure that work is completed in a manner that minimizes delay in meeting the date requested by the…
Pub. Util. Code § 935 Section 935
1.0K chars
(a) As part of each annual report, including any updates pursuant to subdivision (e) of Section 934, and in each general rate case application, each electrical corporation shall include a detailed analysis of its current qualified staffing level and future required qualified staf…
Pub. Util. Code § 936 Section 936
1.6K chars
(a) In addition to the requirements of Section 740.21, the commission shall require an electrical corporation to do both of the following: (1) Consider, in its annual distribution planning process, all of the following: (A) Federal, state, regional, and local air quality and deca…