Pub. Util. Code § 2827.1 Section 2827.1
4.7K chars
(a) For purposes of this section, “eligible customer-generator,” “large electrical corporation,” and “renewable electrical generation facility” have the same meanings as defined in Section 2827. (b) Notwithstanding any other law, the commission shall develop a standard contract o…
Pub. Util. Code § 2827.10 Section 2827.10
11.7K chars
(a) As used in this section, the following terms have the following meanings: (1) “Electrical corporation” means an electrical corporation, as defined in Section 218. (2) “Eligible fuel cell electrical generating facility” means a facility that includes the following: (A) Integra…
Pub. Util. Code § 2827.7 Section 2827.7
0.5K chars
Generation eligible for net energy metering that has all local and state permits required to commence construction on or before December 31, 2002, and has completed construction on or before September 30, 2003, shall be entitled, regardless of any change in customer or ownership …
Pub. Util. Code § 2827.8 Section 2827.8
2.2K chars
Notwithstanding any other provisions of this article, the following provisions apply to an eligible customer-generator utilizing wind energy co-metering with a capacity of more than 50 kilowatts, but not exceeding one megawatt, unless approved by the electric service provider. (a…