(1) Every operator to whom a permit is issued pursuant to the provisions of this article shall perform such reclamation as is prescribed by the reclamation plan adopted pursuant to this section.
(2) Reclamation plans shall be based upon provisions for, or satisfactory explanation of, all general requirements for the type of reclamation chosen. The details of the plan shall be appropriate to the type of reclamation designated by the operator and shall be based upon the advice of experienced and technically trained personnel.
(3) On the anniversary date of the permit each year, the operator shall submit:
(a) A map showing the extent of current disturbances to affected land; and
(b) A report describing the affected land and the surrounding area, including:
(I) Changes over the preceding year regarding any disturbances to the prevailing hydrologic balance;
(II) Changes over the preceding year regarding any disturbances to the quality and quantity of water in surface and groundwater systems;
(III) Reclamation accomplished to date and during the preceding year;
(IV) New disturbances that are anticipated to occur during the upcoming year; and
(V) Reclamation that will be performed during the upcoming year.
(4) All operators shall submit, in addition to the plan and map, an annual fee as specified in section 34-32-127 (2).
(5) (Deleted by amendment, L. 91, p. 1435, � 9, effective July 1, 1991.)
(6) For operators who have filed an application pursuant to section 34-32-110 (1), the operator shall submit an annual fee as specified in section 34-32-127 (2) and a map or sketch describing the acreage affected to date and the acreage reclaimed to date.
(7) Reclamation plans and the implementation of reclamation plans must conform to the following general requirements:
(a) Grading shall be carried on so as to create a final topography appropriate to the final land use selected in accordance with paragraph (j) of this subsection (7).
(b) Earth dams shall be constructed, if necessary to impound water, if the formation of such impoundments will not interfere with mining operations, damage adjoining property, or conflict with water pollution laws, rules or regulations of the federal government or the state of Colorado, or any local government pollution ordinances.
(c) Acid-forming or toxic-producing material that has been mined shall be handled in a manner that will protect the drainage system from pollution.
(d) All refuse shall be disposed in a manner that will control unsightliness, or deleterious effects from such refuse.
(e) In those areas where revegetation is part of the reclamation plan, land shall be revegetated in such a way as to establish a diverse, effective, and long-lasting vegetative cover that is capable of self-regeneration and at least equal in extent of cover to the natural vegetation of the surrounding area. Native plant species that encourage pollinators should receive first consideration, but introduced species may be used in the revegetation process when found desirable by the board.
(f) Where it is necessary to remove overburden in order to mine the mineral, topsoil shall be removed from the affected land and segregated from other spoil. If such topsoil is not replaced on a backfill area within a time short enough to avoid deterioration of the topsoil, vegetative cover or other means shall be employed so that the topsoil is preserved from wind and water erosion, remains free of any contamination by other acid or toxic material, and is in a useable condition for sustaining vegetation when restored during reclamation. If, in the discretion of the board, such topsoil is of insufficient quantity or of poor quality for sustaining vegetation or if other strata can be shown to be more suitable for vegetation requirements, the operator shall remove, segregate, and preserve in a like manner such other strata which are best able to support vegetation.
(g) (I) Disturbances to the prevailing hydrologic balance of the affected land and of the surrounding area and to the quality and quantity of water in surface and groundwater systems both during and after the mining operation and during reclamation shall be minimized.
(II) Except as specified in subsections (7)(g)(III) and (7)(g)(IV) of this section, a reclamation plan for a new or amended permit must demonstrate, by substantial evidence, a reasonably foreseeable end date for any water quality treatment necessary to ensure compliance with applicable water quality standards.
(III) The board may approve a reclamation plan that lacks substantial evidence of a reasonably foreseeable end date for any necessary water quality treatment if the new or amended permit includes an environmental protection plan and reclamation plan adequate to ensure compliance with applicable water quality standards and upon making a written determination:
(A) For an amended reclamation plan, except as provided in subsection (7)(g)(III)(B) of this section, that the water quality impacts that have occurred or are occurring for which no reasonably foreseeable end date for water quality treatment can be established were either unforeseen at the time of approval of the reclamation plan or existing at a mine site permitted before January 1, 2019; or
(B) For a new or amended reclamation plan for a permit involving a site that was previously mined but was not permitted as of January 1, 2019, that existing water quality conditions do not meet applicable water quality standards and no reasonably foreseeable end date for water quality treatment can be established.
(IV) The board may approve a new reclamation plan that lacks substantial evidence of a reasonably foreseeable end date for any necessary water quality treatment if a permit application is submitted and the reclamation plan is limited to reclamation of already-mined ore or other waste materials, including mine drainage or runoff, as part of a cleanup.
(V) Nothing in this subsection (7)(g) allows the operator to avoid compliance with other applicable statutory provisions governing well permits, augmentation requirements, and replacement plans.
(h) Areas outside of the affected land shall be protected from slides or damage occurring during the mining operation and reclamation.
(i) All surface areas of the affected land, including spoil piles, shall be stabilized and protected so as to effectively control erosion and attendant air and water pollution.
(j) On all affected land, the operator in consultation with the landowner where possible, subject to the approval of the board, shall determine which parts of the affected land shall be reclaimed for forest, range, crop, horticultural, homesite, recreational, industrial, or other uses, including food, shelter, and ground cover for wildlife. Prior to approving any new reclamation plan or approving a change in any existing reclamation plan as provided in this section, the board shall confer with the local board of county commissioners and the board of supervisors of the conservation district if the mining operation is within the boundaries of a conservation district. Reclamation shall be required on all the affected land.
(k) If the operator's choice of reclamation is forest planting, the operator may, with the approval of the office, select the type of trees to be planted. Planting methods and care of stock shall be governed by good planting practices. If the operator is unable to acquire sufficient planting stock of desired tree species from the state or elsewhere at a reasonable cost, the operator may defer planting until planting stock is available to plant such land as originally planned, or may select an alternate method of reclamation.
(l) The operator shall construct fire lanes or access roads when necessary through the area to be planted. These lanes or roads shall be available for use by the planting crews and shall serve as a means of access for supervision and inspection of the planting work.
(m) On lands owned by the operator, the operator may permit the public to use the same for recreational purposes, in accordance with the limited landowner liability law contained in article 41 of title 33, C.R.S., except in areas where such use is found by the operator to be hazardous or objectionable.
(n) If the operator's choice of reclamation is for range, the affected land shall be restored to the satisfaction of the board to slopes commensurate with the proposed land use and shall not be too steep to be traversed by livestock. The legume seed shall be properly inoculated in all cases. The area may be seeded either by hand or power or by the aerial method. The species of grasses and legumes and the rates of seeding to be used per acre shall be determined primarily by recommendations from the agricultural experiment stations established pursuant to part 6 of article 31 of title 23 and experienced reclamation personnel of the operator after considering other research or successful experience with range seeding. No grazing shall be permitted on reclaimed land until the planting is firmly established. The board, in consultation with the landowner and the local conservation district, if any, shall determine when grazing may start.
(o) If the operator's choice of reclamation is for agricultural or horticultural crops which normally require the use of farm equipment, the operator shall grade so that the area can be traversed with farm machinery. Preparation for seeding or planting, fertilization, and seeding or planting rates shall be governed by general agricultural and horticultural practices, except where research or experience in such operations differs with these practices.
(p) If the operator's choice of reclamation is for the development of the affected land for homesite, recreational, industrial, or other uses, including food, shelter, and ground cover for wildlife, the basic minimum requirements necessary for such reclamation shall be agreed upon by the operator and the board.
(q) All reclamation provided for in this section shall be carried to completion by the operator with all reasonable diligence and shall be conducted concurrently with mining operations to the extent practicable, taking into consideration the mine plan, mine safety, economics, the availability of equipment and material, and other site-specific conditions relevant and unique to the affected land and to the postmining land use. Upon termination of the entire mining operation and in accordance with the reclamation plan, each phase of final reclamation shall be completed within five years after the date on which the operator advises the board that such phase has commenced, unless such period is extended by the board pursuant to section 34-32-112 (7); except that:
(I) No planting of any kind shall be required to be made on any affected land being used or proposed to be used by the operator for the deposit or disposal of refuse until after the cessation of operations productive of such refuse, or proposed for future mining, or within depressed haulage roads or final cuts while such roads or final cuts are being used or made, or where permanent pools or lakes have been formed.
(II) No planting of any kind shall be required on any affected land so long as the chemical and physical characteristics of the surface and immediately underlying material of such affected land are toxic, deficient in plant nutrients, or composed of sand, gravel, shale, or stone to such an extent as to seriously inhibit plant growth and such condition cannot feasibly be remedied by chemical treatment, fertilization, replacement of overburden, or like measures. Where natural weathering and leaching of any of such affected land, over a period of ten years after commencement of reclamation, fails to remove the toxic and physical characteristics inhibitory to plant growth or if, at any time within such ten-year period, the board determines that any of such affected land is, and during the remainder of said ten-year period will be, unplantable, the operator's obligations under the provisions of this article with respect to such affected land may, with the approval of the board, be discharged by reclamation of an equal number of acres of land previously mined and owned by the operator not otherwise subject to reclamation under this article.
(III) (A) With the approval of the board and the owner of the land to be reclaimed, the operator may substitute land previously mined and owned by the operator not otherwise subject to reclamation under this article or, in the alternative, with the approval of the board and the owner of the land, reclamation of an equal number of acres of any lands previously mined but not owned by the operator if the operator has not previously abandoned unreclaimed mining lands. The board also has authority to grant, in the alternative, the reclamation of lesser or greater acreage so long as the cost of reclaiming such acreage is at least equivalent to the cost of reclaiming the original permit lands. If any area is so substituted, the operator shall submit a map of the substituted area, which map shall conform to all of the requirements with respect to other maps required by this article. Upon completion of reclamation of the substituted land, the operator shall be relieved of all obligations under this article with respect to the land for which substitution has been permitted.
(B) Sub-subparagraph (A) of this subparagraph (III) shall not apply to uranium or in situ leach mining.
(IV) Reclamation may be completed in phases, and the five-year period may be applied separately to each phase as it is commenced during the life of the mine.
(r) If affected land is owned by a legal entity other than any local, state, or federal entity, any buildings or any structures having significant historical value placed thereon during mining operations which are conducted in accordance with paragraph (j) of this subsection (7) may remain on the affected land at the option of the operator and landowner.
(8) All uranium extraction operations using in situ leach mining or recovery methods, including any injection of any chemicals designed to mobilize uranium resources, shall reclaim all affected groundwater for all water quality parameters that are specifically identified in the baseline site characterization, or in the statewide radioactive materials standards or tables 1 through 4 of the basic standards for groundwater as established by the Colorado water quality control commission, to either of the following:
(a) Premining baseline water quality or better as established by the baseline site characterization conducted pursuant to section 34-32-112.5 (5); or
(b) That quality which meets the statewide radioactive materials standards and the most stringent criteria set forth in tables 1 through 4 of the basic standards for groundwater as established by the Colorado water quality control commission. In establishing, designing, and implementing a groundwater reclamation plan, the mine operator shall use best available technology.
(9) Operators of in situ leach mining operations shall take all necessary steps to prevent and remediate any degradation of preexisting groundwater uses during the prospecting, development, extraction, and reclamation phases of the operation.
Source: L. 76: Entire article R&RE, p. 739, � 1, effective July 1. L. 79: (1)(a) amended, p. 1252, � 3, effective May 25. L. 81: (1)(a) amended, p. 1678, � 3, effective April 30. L. 88: Entire section R&RE, p. 1210, � 11, effective July 1. L. 89: (7)(g) amended, p. 1426, � 7, effective July 15. L. 91: IP(7)(q) amended, p. 1419, � 1, effective May 6; (4) amended, p. 1073, � 54, effective July 1; (4) to (6) amended, p. 1435, � 9, effective July 1. L. 92: (7)(k) amended, p. 1942, � 41, effective July 1. L. 2002: (7)(j) and (7)(n) amended, p. 518, � 15, effective July 1. L. 2008: IP(7)(q) and (7)(q)(III) amended and (8) and (9) added, p. 940, � 7, effective May 20. L. 2018: (7)(n) amended, (HB 18-1375), ch. 274, p. 1717, � 70, effective May 29. L. 2019: (3), IP(7), and (7)(g) amended, (HB 19-1113), ch. 73, p. 266, � 1, effective August 2. L. 2025: (7)(e) amended, (SB 25-054), ch. 200, p. 890, � 7, effective August 6.
Editor's note: This section is similar to former � 34-32-111 as it existed prior to 1976.
Cross references: (1) For the legislative declaration contained in the 1989 act amending subsection (7)(g), see section 1 of chapter 314, Session Laws of Colorado 1989.
(2) For the short title (Legacy Mining and Modernization Act) and the legislative declaration in SB 25-054, see sections 1 and 2 of chapter 200, Session Laws of Colorado 2025.
34-32-116.5. Environmental protection plan - designated mining operation - rules. (1) (a) An environmental protection plan shall be required for all designated mining operations.
(b) All nondesignated mining operations are exempt from this section.
(2) Once adopted, the provisions of an environmental protection plan shall be enforceable by the board and by the office to the same extent as any other permit provision or condition.
(3) (a) The board shall promulgate rules pursuant to section 34-32-109 (5) to require a holder of an existing permit for a designated mining operation to submit a proposed environmental protection plan for approval by the office or board.
(b) The plan and fees due pursuant to this subsection (3) shall be due by the date established by the board by rule.
(4) (a) If an existing permit contains the necessary elements of an environmental protection plan, the office or board may deem the existing permit to be adequate to comply with the environmental protection plan.
(b) For any environmental protection plan submitted for an existing operation, the office shall determine whether the proposed environmental protection plan shall be considered a technical revision or an amendment, as defined by rule, or that no modification to the existing permit is necessary.
(5) The board shall promulgate rules governing the form, content, and requirements of an environmental protection plan for any designated mining operation. In promulgating such rules, the board shall consider the economic reasonableness, the technical feasibility, and the level or degree of environmental concerns, as applicable.
(6) All applicants for new permits shall contact the division of parks and wildlife for appropriate wildlife protection recommendations which shall be reviewed as part of the application process. If protecting wildlife is determined to be necessary by the board, the office may incorporate such wildlife protection recommendations into the new permit as a condition for such permit.
Source: L. 93: Entire section added, p. 1183, � 9, effective July 1. L. 2007: (3)(b) amended, p. 2047, � 89, effective June 1.
34-32-117. Warranties of performance - warranties of financial responsibility - release of warranties - applicability. (1) No permit may be issued under this article until the board receives performance and financial warranties as described in subsections (2), (3), and (4) of this section.
(2) A performance warranty shall consist of a written promise to the board, by the operator, to comply with all requirements of this article. Performance warranties shall be in such form as the board may prescribe. Whenever two or more persons or entities are named as operators in a single permit, the operators may limit the scope of their individual performance warranties so long as their warranties, in the aggregate, warrant performance of all requirements of this article.
(3) (a) A financial warranty shall consist of a written promise, to the board, to be responsible for reclamation costs up to the amount specified by the board pursuant to subsection (4) of this section, together with proof of financial responsibility. Financial warranties may be provided by the operator, by any third party, or by any combination of persons or entities and shall be in such form as the board may prescribe.
(b) The board may accept interests in real and personal property as financial warranties where the amount of the reclamation liability exceeds thirty million dollars. The board may determine the extent of a specified percentage of the appraised value of the property, not to exceed seventy-five percent of the appraised value. A person offering such financial warranty shall submit the information necessary to show clear title to and the value of the property.
(c) The board may refuse to accept any form of financial warranty if:
(I) The value of the financial warranty offered is dependent upon the success, profitability, or continued operation of the mine; or
(II) The board determines that the financial warranty offered cannot reasonably be converted to cash within one hundred eighty days of forfeiture.
(d) For nondesignated mining operations:
(I) This subsection (3) shall be applicable July 1, 1993, to deeds of trust which are used as collateral for new financial warranties completed on or after such date;
(II) This subsection (3) is applicable on January 1, 1996, to:
(A) Deeds of trust existing as of July 1, 1993, and subsequent updates of the deeds of trust used as collateral for financial warranties.
(B) (Deleted by amendment, L. 2025).
(e) Any instrument offered as a financial warranty pursuant to this subsection (3) shall provide that the board may recover any necessary costs, including attorney fees, it incurs in foreclosing on or realizing any collateral used to secure such financial warranty if such financial warranty is forfeited.
(f) Proof of financial responsibility may consist of any one or more of the following, subject to approval by the board:
(I) A surety bond issued by a corporate surety authorized to do business in this state;
(II) A letter of credit issued by a bank authorized to do business in the United States;
(III) A certificate of deposit;
(IV) A deed of trust or security agreement encumbering real or personal property and creating a first lien in favor of the state for liabilities exceeding thirty million dollars;
(V) Assurance, in such form as the board may require, that:
(A) Upon commencement of production or when site conditions and liabilities change, the operator will establish an individual reclamation fund, to be held by an independent trustee for the board, upon such terms and conditions as the board may prescribe, which trust fund shall be funded by periodic cash payments representing such fraction of receipts as will, in the opinion of the board, provide assurance that money will be available for reclamation; and
(B) Prior to issuance of a permit, the operator will provide another form of financial warranty as described in this paragraph (f). As the reclamation fund increases in value, the other form of financial warranty may be decreased in value so long as the sum of financial warranties is that amount specified by subsection (4) of this section.
(C) to (E) Repealed.
(VI) and (VII) Repealed.
(VIII) Proof that the operator is a department or division of state government or a unit of county or municipal government.
(g) Any proof of financial responsibility submitted or revised on or after July 1, 1993, shall be in compliance with paragraphs (a), (b), and (c) of subsection (4) of this section.
(4) (a) The board shall prescribe the amount and duration of financial warranties, taking into account the nature, extent, and duration of the proposed mining operation and the magnitude, type, and estimated cost of planned reclamation.
(b) (I) In any single year during the life of a permit, the amount of required financial warranties must not exceed the estimated cost of fully reclaiming all lands to be affected in said year, plus all lands affected in previous permit years and not yet fully reclaimed. For the purpose of this subsection (4)(b)(I), reclamation costs shall be computed with reference to current reclamation costs. The amount of the financial warranty must be sufficient to assure the completion of reclamation of affected lands if the office has to complete the reclamation due to forfeiture, including all measures commenced or reasonably foreseen to assure the protection of water resources, including costs necessary to cover water quality protection, treatment, and monitoring as may be required by permit. The financial warranty must include an additional amount equal to five percent of the amount of the financial warranty to defray the administrative costs incurred by the office in conducting the reclamation.
(II) The office and the board shall take reasonable measures to assure the continued adequacy of any financial warranty.
(c) (I) The board may:
(A) From time to time for good cause shown, increase or decrease the amount and duration of required financial warranties;
(B) By rule or permit condition require proof of value on a periodic basis of all or any group of warranties held by the board; and
(C) By rule or permit condition limit certain types of warranties to specific purposes only or require a designated percentage of the total bond be held in easily valued and convertible instruments.
(II) An operator or a financial warrantor has sixty days after the date of notice of an adjustment to fulfill the new requirements.
(5) (a) An operator may file a written notice of completion with the office whenever such operator believes such operator has completed any or all requirements of this article with respect to any or all of such operator's affected lands except for any such lands in designated mining operations. The office shall, within sixty days after receiving said notice, or as soon thereafter as weather conditions permit, inspect lands and reclamation described in the notice to determine if the operator has complied with all applicable requirements.
(b) If the board or office finds that the operator has successfully complied with any or all requirements of this article, it shall release all performance and financial warranties applicable to said requirements. Releases shall be in writing and shall be delivered to the owner or operator promptly after the date of such finding.
(c) If the board or office finds that the operator has not complied with applicable requirements of this article, it shall so advise the operator not more than sixty days after the date of the inspection.
(d) If the office fails to conduct an inspection within the time specified in paragraph (a) of this subsection (5) or fails to advise the operator of deficiencies within the time specified in paragraph (c) of this subsection (5), then all financial warranties applicable to reclamation described in the notice shall be deemed released as a matter of law.
(5.5) (a) (I) An operator may file a written notice of completion with the office upon completion of all requirements of this article with respect to any or all of such operator's affected lands at a designated mining operation.
(II) The office shall inspect lands and reclamation described in any such written notice to determine if the operator has complied with all applicable requirements within sixty days after receiving such notice or as soon thereafter as weather conditions permit.
(b) If the board or office finds that the operator has complied with all requirements of this article, it shall promptly deliver a written release of any performance and financial warranties, or portion thereof, to the owner or operator according to the following schedule:
(I) An appropriate amount of the financial warranty for the applicable permit area shall be released when the operator completes the requirements of the approved reclamation plan; and
(II) The performance warranty and the remaining portion of the financial warranty shall be released on such schedule as the board may prescribe; except that all remaining portions of the warranty shall be released at the end of the period described in paragraph (e) of this subsection (5.5) if, at that time, the affected land has been reclaimed for a beneficial use and is in compliance with all applicable performance standards.
(c) (I) If the board or office finds that the operator has not complied with applicable requirements of this article, it shall so advise the operator not more than sixty days after the date of an inspection conducted pursuant to paragraph (a) or (e) of this subsection (5.5).
(II) If the operator is not entitled to a release of the financial warranty, or portion thereof, pursuant to paragraph (b) of this subsection (5.5), the board or office may specify a reclamation schedule and adjust the amount of the financial warranty pursuant to paragraph (c) of subsection (4) of this section.
(d) If the office fails to conduct an inspection within the time specified in paragraph (a) or (e) of this subsection (5.5) or fails to advise the operator of any deficiencies within the time specified in paragraph (c) of this subsection (5.5), then that portion of the financial warranties applicable to reclamation described in the notice or request for release shall be deemed released as a matter of law.
(e) At such time as the board or office may prescribe, but no more than five years after the release of a portion of the financial warranty as described in subparagraph (I) of paragraph (b) of this subsection (5.5), the operator may file a written request for release of the performance warranty and the remaining portion of the financial warranty. The office shall inspect any lands and reclamation described in the request within sixty days after receiving such request or as soon thereafter as weather conditions permit to determine whether the affected land has been reclaimed for a beneficial use and is in compliance with all applicable performance standards.
(6) (a) Financial warranties shall be maintained in good standing for the entire life of any permit issued under this article 32. An operator or a financial warrantor shall immediately notify the board of an event that may impair the operator's or the financial warrantor's warranties.
(b) (I) Each operator and financial warrantor providing proof of financial responsibility in a form described in subsection (3)(f)(V) of this section shall annually cause to be filed with the board a certification by an independent auditor that, as of the close of the operator's most recent fiscal year, the operator and the financial warrantor continued to meet all applicable requirements of the applicable subsection. An operator or a financial warrantor that no longer meets the requirements shall instead cause to be filed an alternate form of financial warranty.
(II) Repealed.
(c) Each operator and financial warrantor providing proof of financial responsibility in a form described in subsection (3)(f)(V) of this section shall notify the board within sixty days of a net loss incurred in a quarterly period.
(d) Whenever the board receives a notice under paragraph (a) or (c) of this subsection (6), fails to receive a certification or substitute warranty as required by paragraph (b) of this subsection (6), or otherwise has reason to believe that a financial warranty has been materially impaired, it may convene a hearing for the purpose of determining whether impairment has in fact occurred.
(e) Whenever the board elects to convene a hearing pursuant to this subsection (6), it may hire an independent consultant to provide expert advice at the hearing. The fees of the consultant shall be paid by the operator, and a consultant shall not be hired until the operator signs a written fee agreement in such form as the board may prescribe. In the event that an operator refuses to sign such an agreement, the board may, without hearing, order the operator to provide an alternate form of financial warranty.
(f) At a hearing held pursuant to this subsection (6), if the board finds that a financial warranty has been materially impaired, the board may order the operator or the financial warrantor to provide an alternate form of financial warranty.
(g) An operator or a financial warrantor has ninety days to provide an alternate warranty required under this subsection (6).
(h) All hearings held under this subsection (6) shall comply with all requirements of article 4 of title 24, C.R.S.
(i) (Deleted by amendment, L. 93, p. 1184, � 10, effective July 1, 1993.)
(7) and (8) Repealed.
Source: L. 76: Entire article R&RE, p. 742, � 1, effective July 1. L. 77: (1)(a), (1)(b), (2), (3), and (6) amended, p. 1562, � 2, effective June 2. L. 79: (1)(e) added, p. 1252, � 4, effective May 25. L. 81: (1)(e) amended, p. 1678, � 4, effective April 30; entire section R&RE, p. 1670, � 9, effective June 19. L. 91: (3)(a)(IX) amended, p. 757, � 33, effective April 4. L. 93: Entire section amended, p. 1184, � 10, effective July 1. L. 2019: (3)(f)(VI) and (3)(f)(VII) repealed and (4)(b)(I) and (6)(b) amended, (HB 19-1113), ch. 73, p. 267, � 2, effective August 2; (6)(c) amended, (HB 19-1113), ch. 73, p. 267, � 2, effective August 2, 2020. L. 2022: (7) repealed, (SB 22-212), ch. 421, p. 2983, � 77, effective August 10. L. 2025: (3)(b), (3)(d)(II), (3)(f)(IV), (3)(f)(V)(A), (4)(c)(II), (6)(a), (6)(b)(I), (6)(c), (6)(e), (6)(f), and (6)(g) amended and (3)(f)(V)(C), (3)(f)(V)(D), (3)(f)(V)(E), and (8) repealed, (SB 25-054), ch. 200, p. 891, � 8, effective August 6.
Editor's note: (1) This section is similar to former � 34-32-112 as it existed prior to 1976.
(2) Subsection (6)(b)(II)(B) provided for the repeal of subsection (6)(b)(II), effective September 1, 2021. (See L. 2019, p. 267.)
Cross references: For the short title (Legacy Mining and Modernization Act) and the legislative declaration in SB 25-054, see sections 1 and 2 of chapter 200, Session Laws of Colorado 2025.