For the purposes of this part, the term: (1) “Applicant” shall have the same meaning as set forth in § 6-1451.01(2). (1A) “Complete stormwater management plan” means a plan, with required supporting documentation, that demonstrates compliance with each applicable stormwater management requirement, as determined by DDOE. (1B) “Current edition” shall have the same meaning as provided in § 6-1451.01(8A). (1C) “DDOE” means the District Department of the Environment. (1D) “District-financed” or “District instrumentality-financed” shall have the same meaning as provided in § 6-1451.01(10A). (1E) “First building permit” shall have the same meaning as provided in § 6-1451.01(14A). (2) “Green Building Act” means the Chapter 14A of Title 6. (3) “LEED” shall have the same meaning as provided in § 6-1451.01(26). (3A) “LEED standard for commercial and institutional buildings” shall have the same meaning as provided in § 6-1451.01(31A). (4) “New construction” shall have the same meaning as set forth in § 6-1451.01(33). (5) “Project” shall have the same meaning as set forth in § 6-1451.01(35). (6) Repealed. (7) “Substantial improvement” shall have the same meaning as set forth in § 6-1451.01(40).