82 sections in this chapter.
R.62-610-.567 Reliability and Operator Staffing
3.7K chars
(1) A minimum of Class I reliability, as described in paragraph 62-610.300(1)(a), F.A.C., shall be provided at all domestic wastewater treatment facilities providing reclaimed water for ground water recharge and i surface water discharges, which are regulated by Part V of this ch…
R.62-610-.568 Monitoring and Operating Protocol
14.7K chars
(1) Only acceptable quality reclaimed water shall be discharged to reuse systems regulated under Part V of this chapter. (2) Reclaimed water limitations shall be met before injection to ground water or discharge to surface waters. For projects requiring high-level disinfection, t…
R.62-610-.571 Setback Distances
1.6K chars
(1) Setback distances for injection facilities shall be established in accordance with Rule 62-610.521, F.A.C. (2) Outfalls for surface water discharges shall not be located within 500 feet of existing or approved (but not yet constructed) potable water intakes within Class I sur…