R.391-3-2-.05 Division Consideration of Permit Applications, Modifications, Revocations and Denials
4.0K chars
(1) In considering permit applications, revocations, and modifications, the Division shall consider. (a) the number of persons using an aquifer and the object, extent, and necessity of their respective withdrawals or uses; (b) the nature and size of aquifer; (c) the physical and …
R.391-3-2-.06 Granting of a Permit to Use Ground Water
3.3K chars
(1) When sufficient evidence in provided by the applicant that the water withdrawn or used, or intended to be withdrawn or used, is a nonconsumptive use, as defined in Paragraph (c) of Rule of this Chapter, a permit therefore shall be issued by the Division without the conditions…
R.391-3-2-.07 Duration of Permit and Renewal
0.7K chars
(1) Except for farm use, no permit granted under Rule of this Chapter shall be issued for a longer period than the longest of the following: (a) ten years; or (b) the period found by the Division to be necessary for reasonable amortization of the applicant's withdrawal or water-u…