Dates When Generators Go on Line

12 GCA § 8113.10 — under Guam Power Authority.

12 GCA § 8113.10

GPA did, on July 10, 1992, provide I Liheslatura, while sitting as a Committee of the Whole, with a list of the specific dates that each of the following generating units purchased by the authorization contained in this Act will come on line and be producing electricity for the IWPS. Such dates were: Generation Unit In-Service date* Ten. Location 2-3616 Caterpillar, 9.6 MW (4.8 MW each) May 31, 1993 Talo’fo’fo’ 2-3616 Caterpillar, 9.6 MW (4.8 MW each) June 30, 1993 GMH 1-LM2500,21.6 MW (Gas Turbine) April 30, 1993 Macheche 4-3616 Caterpillar, 19.2 MW (4.8 MW each) Aug. 31, 1993 New Site Weber CT1 (8 MW) Jan. 31, 1993 Existing Weber CT2 (8 MW) Feb. 28, 1993 Existing * In-Service Date means the date the unit is up and providing power to the IWPS. The Authority shall also provide the Speaker of I Liheslatura and I Maga’hågan/Maga’låhen Guåhan a detailed explanation as to why a specific dateline cannot or has not been met within ten (10) days of the date missed. SOURCE: Added by P.L. 21-117:11 (July 15, 1992). 2025 NOTE: Reference to the “Governor of Guam” replaced with I Maga’hågan/Maga’låhen Guåhan pursuant to 5 GCA § 1510. Reference to the “Legislature” replaced with I Liheslatura pursuant to 2 GCA § 1101. 2024 NOTE: Reference to Talofofo replaced with Talo’fo’fo’ pursuant to P.L. 36-051:2 (Aug. 18, 2021).