55 sections in this chapter.
R.160.500 Section 160.500: Approval of Plans
1.5K chars
Section 160.500 Approval of Plans a) Drawings or blue prints made to scale shall be submitted in triplicate to the Office of the State Fire Marshal and shall be approved before any new installation, addition or remodeling is undertaken. b) Drawings shall show the plot of ground t…
R.041.00160-160.60 Section 160.60: Location of Tanks – Streams
0.3K chars
Section 160.60 Location of Tanks – Streams When tanks are located within 300 feet of a stream they shall be diked in conformity with Section 160.200. Existing facilities shall be brought into compliance with this rule within one year of the effective date of this rule. (Source: A…
R.041.00160-160.70 Section 160.70: Material and Construction of Tanks – Specifications
2.2K chars
Section 160.70 Material and Construction of Tanks – Specifications a) Factory assembled tanks shall bear the label of Underwriters' Laboratories Standard UL 142 (1972) for aboveground storage or UL 58 (1976) for underground storage. Field erected tanks shall meet the specificatio…
R.041.00160-160.80 Section 160.80: Venting of Tanks – Normal Vents
0.5K chars
Section 160.80 Venting of Tanks – Normal Vents a) Each tank over 100 gallons in capacity shall have vent openings, or pressure vacuum vents in accordance with NFPA 30 (1981). b) Vent openings shall in no case be less than one and one-fourth inches in diameter, and where a power p…
R.041.00160-160.90 Section 160.90: Venting of Tanks – Special Safety or Emergency Relief Vents
1.5K chars
Section 160.90 Venting of Tanks – Special Safety or Emergency Relief Vents a) Additional vent openings or safety valves to relieve any excessive pressure due to external heat shall be provided, of a type which shall be self-closing when pressure is relieved and meet the requireme…