16,713 sections across 1,627 Illinois regulatory chapters.
R.077.00905-905.40 Section 905.40: Septic Tanks
10.2K chars
Section 905.40 Septic Tanks a) Septic Tank Approval. Manufacturers of prefabricated septic tanks shall submit a set of plans for each size and configuration of septic tank to the Department for approval. Plans shall be drawn to scale and show all dimensions, baffles, tees, cleano…
R.077.00905-905.50 Section 905.50: Distribution Boxes
1.1K chars
Section 905.50 Distribution Boxes a) General. Distribution boxes may be installed between a septic tank, aerobic treatment plant, NSF International/ANSI Standard 40 wastewater treatment system, and a subsurface seepage system or buried sand filter. If a distribution box is used, …
R.077.00905-905.55 Section 905.55: Subsurface Seepage System Design Requirements
4.6K chars
Section 905.55 Subsurface Seepage System Design Requirements After January 1, 2014, when designing a subsurface seepage system, the absorption capacity of the soil shall be determined by subsection (a). After January 1, 2014, subsection (b) shall not be used to determine design r…