Exception

65 ILCS 5/11-39.2-50, under Municipal Design-Build Contracts.

65 ILCS 5/11-39.2-50

(65 ILCS 5/11-39.2-50)     Sec. 11-39.2-50. Exception. Nothing in this Division prevents a municipality from using a qualification-based selection process for design professionals or construction managers for design-build projects. (Source: P.A. 103-491, eff. 1-1-24.)