Environmental feasibility report

Ind. Code § 13-15-9-3, under Chapter 9. Nuclear Facility Permits.

Ind. Code § 13-15-9-3

Sec. 3. A person proposing to construct: (1) a nuclear powered generating facility; or (2) a nuclear fuel reprocessing plant; shall file with the board an environmental feasibility report, on a form prescribed by the board, concurrently with the filing of the preliminary safety analysis required to be filed with the United States Atomic Energy Commission. [Pre-1996 Recodification Citation: 13-7-9-2.] As added by P.L.1-1996, SEC.5. Amended by P.L.133-2012, SEC.105.