Sec. 2. The commissioner may not: (1) issue; or (2) consider an application for; a permit specifically authorizing the incineration of PCB until the study required by section 3 of this chapter is concluded. [Pre-1996 Recodification Citation: 13-7-16.5-9(c).] As added by P.L.1-1996, SEC.7.