Adoption of rules waiving requirement of submission of plans

Ind. Code § 13-18-3-12, under Chapter 3. Powers and Duties Concerning Water Pollution Control.

Ind. Code § 13-18-3-12

Sec. 12. The board shall adopt rules providing that whenever a person submits plans to a unit concerning the design or construction of: (1) a sanitary sewer or public water main, if: (A) a professional engineer who is registered under IC 25-31 prepared the plans; (B) the unit provided for review of the plans by a qualified engineer and subsequently approved the plans; and (C) all other requirements specified in rules adopted by the board are met; or (2) a sanitary sewer extension for and within a subdivision, if: (A) a qualified professional surveyor who is registered under IC 25-21.5 prepared the plans; (B) the subdivision is being laid out or having been laid out by the professional surveyor subject to IC 25-21.5-7; (C) the unit provided for review of the plans by a qualified engineer and subsequently approved the plans; and (D) all other requirements specified in rules adopted by the board are met; the plans are not required to be submitted to any state agency for a permit, permission, or review, unless required by federal law. As added by P.L.104-1998, SEC.1. Amended by P.L.241-1999, SEC.1; P.L.133-2012, SEC.127; P.L.57-2013, SEC.10; P.L.113-2014, SEC.70.