Flood control

Ind. Code § 14-30-2-15, under Chapter 2. Maumee River Basin Commission.

Ind. Code § 14-30-2-15

Sec. 15. In developing the plan, the commission shall determine the best method and manner of establishing flood control, giving consideration to the following: (1) The reservoir method. (2) The channel improvement method. (3) The levee method. (4) Flood plain regulation. (5) All nonstructural methods. [Pre-1995 Recodification Citation: 36-7-6.1-14.] As added by P.L.1-1995, SEC.23.

IC 14-30-2-16 Public participation Sec. 16. The commission shall give the public an opportunity to participate in the development of the plan. [Pre-1995 Recodification Citation: 36-7-6.1-15.] As added by P.L.1-1995, SEC.23.