Rules

Ind. Code § 14-30-4-17, under Chapter 4. Upper Wabash River Basin Commission.

Ind. Code § 14-30-4-17

Sec. 17. The commission may adopt rules under IC 4-22-2 to require that increased water runoff resulting from new construction be impounded on the construction site. As added by P.L.35-2001, SEC.7.