Sec. 1. This chapter applies to a person who desires to drill at least one (1) test hole: (1) for fluid disposal investigation, mineral resources investigation, engineering projects investigation, or geologic investigation; and (2) to a depth of at least two hundred (200) feet below ground surface elevation at the test hole site. [Pre-1995 Recodification Citation: 13-4-5-4 part.] As added by P.L.1-1995, SEC.31.