Permit requirements

Ind. Code § 8-21-10-3, under Chapter 10. Regulation of Tall Structures.

Ind. Code § 8-21-10-3

Sec. 3. (a) Unless a permit has been issued by the department, a person may not erect,

alter, or add to the height of any structure which falls within any one (1) of the following categories: (1) Any construction or alteration of more than two hundred (200) feet above ground level at its site. (2) Any construction or alteration of greater height than an imaginary surface extending outward and upward at one (1) of the following slopes: (A) One hundred (100) to one (1) for a horizontal distance of twenty thousand (20,000) feet from the nearest point of the nearest runway of any public-use airport with at least one (1) runway more than three thousand two hundred (3,200) feet in actual length, excluding heliports. (B) Fifty (50) to one (1) for a horizontal distance of ten thousand (10,000) feet from the nearest point of the nearest runway of any public-use airport with its longest runway no more than three thousand two hundred (3,200) feet in actual length, excluding heliports. (C) Twenty-five (25) to one (1) for a horizontal distance of five thousand (5,000) feet from the nearest point of the nearest landing and takeoff area of any public-use heliport. (3) Any construction or alteration of traverse ways used, or to be used, for the passage of mobile objects if the standards set forth under subdivisions (1) and (2) would be exceeded, but only after the heights of these traverse ways are increased by: (A) Seventeen (17) feet for an interstate highway where overcrossings are designed for a minimum of seventeen (17) feet vertical distance. (B) Fifteen (15) feet for any other public roadway. (C) Ten (10) feet or the height of the highest mobile object that would normally traverse the road, whichever is greater, for a private road. (D) Twenty-three (23) feet for a railroad. (E) For a waterway or any other traversed way not previously mentioned, an amount equal to the height of the highest mobile object that would normally traverse it. (b) Unless: (1) a permit for construction in a noise sensitive area has been approved by the department; (2) the holder of a permit for construction in a noise sensitive area has filed a copy of the permit for construction in a noise sensitive area with the county recorder of the county in which the structure is located, as provided in subsection (d); and (3) a certified copy of the recorded permit for construction in a noise sensitive area, with the recording data from the county recorder on the copy of the permit, has been received by the department; a person may not erect a building used for a noise sensitive purpose within an area lying one thousand five hundred (1,500) feet on either side of the centerline and the extended centerline of a runway for a distance of one (1) nautical mile from the boundaries of any public use airport. (c) A person applying for a permit under subsection (a) must provide notice, at the time of the filing of the application for a permit, to the owner of a public use airport located within a five (5) nautical mile radius surrounding the structure, regardless of county lines, if the structure that is the subject of the permit is: (1) a new structure; or (2) an existing structure to which additional height is added. (d) A person applying for a permit for construction in a noise sensitive area under subsection (b) must provide notice, at the time of the filing of the application for a permit, to the owner of a public use airport if the public use airport is located within a distance of one (1) nautical mile from the boundary of the property that contains the building used for a noise sensitive purpose. (e) Notice under subsections (c) and (d) must be sent by certified or registered mail, with

return receipt requested, and must include the: (1) name, telephone number, and a contact person for the: (A) applicant; (B) department; and (C) plan commission that has jurisdiction over the site of the structure; (2) location of the structure, including a legal description; (3) height of the structure; and (4) Federal Aviation Administration aeronautical study number assigned to the application, if applicable to the type of permit for which notice is required. (f) The applicant for a permit under subsection (b) shall record each permit issued by the department in the office of the county recorder for the county where the structure is located, not later than five (5) business days after the department issues the permit. If a structure is located in more than one (1) county, the county that contains the majority of the structure is the county in which the permit must be filed. (g) A permit issued under subsection (b) is valid only after the department receives a certified copy of the recorded permit with the recording data from the county recorder of the county in which the structure is located. (h) A permit issued under subsection (b) must contain the following statement: "The permittee acknowledges for itself, its heirs, its successors, and its assigns, that the real estate described in this permit experiences or may experience significant levels of aircraft operations, and that the permittee is erecting a building designed for noise sensitive use upon the real estate, with the full knowledge and acceptance of the aircraft operations as well as any effects resulting from the aircraft operations.". (i) An applicant for a permit under subsection (a) must provide written evidence to the department that the structure being constructed does not violate section 7 of this chapter with regard to an existing public use airport, if a public use airport is located within a five (5) nautical mile radius surrounding the structure that is the subject of the permit. (j) If: (1) the applicant for a permit under subsection (a) submits with the application a Determination of No Hazard to Air Navigation issued by the Federal Aviation Administration to the applicant with regard to the proposed construction or alteration; and (2) the department does not deny the permit; the Determination of No Hazard to Air Navigation is a permit under this section, and a separate permit will not be issued by the department. (k) The department shall not issue a permit under subsection (a) for construction or alteration of an energy facility that will result in a structure that is more than two hundred (200) feet above ground level at its site unless the applicant for the permit submits to the department documentation from the Military Aviation and Installation Assurance Siting Clearinghouse indicating: (1) that a formal review of the construction or alteration under 32 CFR 211.6 resulted in a determination that the construction or alteration will not have an adverse impact on military operations and readiness; or (2) that: (A) a formal review of the construction or alteration under 32 CFR 211.6 resulted in a determination that the proposed project will have an adverse impact on military operations and readiness; and (B) the applicant has: (i) resolved any identified adverse impact to the satisfaction of the United States Department of Defense; or (ii) entered into a mitigation agreement with the United States Department of Defense to mitigate the adverse impact. As added by P.L.117-1983, SEC.1. Amended by P.L.54-2002, SEC.2; P.L.71-2020, SEC.2.

IC 8-21-10-3.1 Written authorization for installation or modification of structure within surface of public use airport; removal of structure Sec. 3.1. (a) As used in this section, "structure" does not mean a tower that is principally used for the attachment of radio communications transmission or reception equipment if the tower and its location: (1) comply with all Federal Aviation Administration regulations; (2) comply with section 3 of this chapter; and (3) are approved by the local zoning board. (b) As used in this section, "surface" means an airport's primary or approach imaginary surface established by section 8 of this chapter. (c) Before a person may: (1) erect; (2) install; or (3) modify to add to the height of; a structure within the surface of a public use airport, the person must obtain a written authorization from the public use airport owner or operator. (d) The written authorization may contain terms and conditions to ensure aviation safety that are considered necessary by the owner or operator of the public use airport. (e) A person who obtains written authorization shall strictly comply with any terms and conditions required by the written authorization. (f) The public use airport owner or operator may require the immediate removal of a structure from a surface if: (1) the person who obtains written authorization under subsection (c) violates any part of the written authorization; or (2) the person erecting, installing, or modifying the structure fails to obtain written authorization under subsection (c) from the owner or operator of the public use airport. (g) Removal of a structure for violation of this section may be immediate and does not require a hearing or notification of the department. The public use airport owner or operator may enlist the aid of law enforcement officers in effecting the removal of the structure. As added by P.L.96-1998, SEC.2.