Eligibility criteria

Ind. Code § 8-4.5-5-5, under Chapter 5. Recreational Trails Program.

Ind. Code § 8-4.5-5-5

Sec. 5. A proposed project must meet all of the following eligibility criteria: (1) The project must be part of a local, an areawide, a regional, or a statewide plan. (2) The trail route must be designed in a reasonably safe manner and to allow enjoyment of scenic views or points of historical interest. The route may use: (A) existing roads, streets, or parkways if the normal flow of motor vehicle traffic will not be hindered; (B) abandoned railroad corridors; (C) water corridors, such as river levees and canal tow-paths; (D) utility corridors; or (E) new rights-of-way, if necessary. (3) The project must include a contribution of at least twenty percent (20%) matching funds. Matching funds must be from sources other than the program. Matching funds may not include other grants from state agencies or the provision of in kind services. The value of donated real property may be used to satisfy the matching fund requirement if both of the following apply: (A) The real property is donated after the board's funding commitment. (B) The value is based on a real estate appraisal acceptable to the department of natural resources. The appraisal is subject to review and approval by the department of natural resources after a funding commitment has been made. As added by P.L.40-1995, SEC.3.

IC 8-4.5-5-6 Permitted costs Sec. 6. The following costs may be paid from a grant made under this chapter: (1) Real property acquisition costs, including appraisal costs and negotiation costs. (2) Trail surfacing, resurfacing, rehabilitation, modernization, upgrading, and reconstruction, including pavement repairs and overlays and shoulder widening and stabilization. (3) Initial trail construction, including grading, drainage, paving, and erosion control. (4) Bridge and culvert repair, modernization, replacement, or initial construction. (5) Roadway intersection and interchange improvements, including warranted traffic signals that are an integral part of the project. (6) Construction or improvement of rest areas, information centers, waysides, permanent interpretive displays, lighting, and restrooms, including the costs of utility connections that are an integral part of the project. (7) Design engineering and construction inspection costs directly associated with the project. (8) Storm drainage and storm sewer costs to the extent needed for draining the trail. (9) Utility relocation costs necessary for trail construction or improvement if the utility is not located on a public road. (10) Trail signs, fencing, landscaping, parking areas, and walkways. As added by P.L.40-1995, SEC.3.