Report before installation or remodeling

Ind. Code § 36-1-12.5-6, under Guaranteed Savings Contracts; Energy Efficiency Programs Used by School Corporations.

Ind. Code § 36-1-12.5-6

Sec. 6. (a) Before the public utility or the qualified provider may install equipment in, make modifications to, or remodel a building or complex of buildings under a utility efficiency program or a guaranteed savings contract, the public utility or the qualified provider (whichever applies) must issue a report that includes estimates for the following: (1) All costs attributable to the work stipulated in the agreement or the contract, including the costs of design, engineering, installation, maintenance, repairs, or debt service. (2) The amounts by which: (A) energy or water consumption; (B) wastewater costs; or (C) operating costs; will be reduced. (3) The amounts by which billable revenues will be increased. (b) The report must also contain a listing of contractors and subcontractors to be used by the public utility or the qualified provider with respect to the conservation measures. As added by P.L.24-1993, SEC.6. Amended by P.L.168-2006, SEC.14.