Sec. 9. (a) Unless and until a proposal is accepted, the drawings, specifications, and other information in the proposal are the property of the offeror. (b) After a proposal is accepted, ownership of the drawings, specifications, and
information in the drawings and specifications shall be determined under Indiana law and the terms of the design-build contract. As added by P.L.74-2005, SEC.1.