"Acquisition costs"

Ind. Code § 8-1-7.9-2, under Expedited Generation Resource Plans and Large Load Customers.

Ind. Code § 8-1-7.9-2

Sec. 2. As used in this chapter, "acquisition costs" means the total costs of an acquisition made under an EGR plan, including:

(1) planning; (2) construction; and (3) operating; costs related to the acquisition. As added by P.L.217-2025, SEC.2.