201 chapters · 1,917 sections in this title.
Ind. Code § 13-18-26-1 Certificate of completion required
1.6K chars
Sec. 1. (a) Except as provided in subsection (c), a permit required under IC 13-18-16 for the operation of a public water system may not be issued unless the application contains the certification of completion required under section 2 of this chapter. (b) Except as provided in s…
Ind. Code § 13-18-26-2 Certification that documents have been prepared
0.6K chars
Sec. 2. A permit described in section 1(a) or 1(b) of this chapter may not be issued unless the applicant submits, along with the permit application, a certification that all of the following documents have been prepared and are complete under the requirements of this chapter: (1…
Ind. Code § 13-18-26-3 Life cycle cost-benefit analysis
0.6K chars
Sec. 3. A life cycle cost-benefit analysis must include a comparison of the alternatives of: (1) meeting the water supply or wastewater service needs of the community or area served or proposed to be served through the operation of the water and wastewater treatment plant, as: (A…
Ind. Code § 13-18-26-4 Capital asset management plan
0.7K chars
Sec. 4. A capital asset management plan must include all of the following: (1) A plan to annually review infrastructure needs of the water or wastewater treatment plant. (2) A detailed engineering analysis of asset conditions and useful life, to be used to develop an infrastructu…
Ind. Code § 13-18-26-5 Cybersecurity plan
0.2K chars
Sec. 5. A cybersecurity plan must provide for the protection of the water or wastewater treatment plant from unauthorized use, alteration, or destruction of electronic data. As added by P.L.126-2018, SEC.6.
Ind. Code § 13-18-26-6 Completion, periodic revision, and public disclosure of analysis
1.4K chars
and plans Sec. 6. (a) The analyses and plans described in sections 3, 4, and 5 of this chapter must be: (1) complete under the requirements of this chapter at the time an application for a permit described in section 1(a) or 1(b) of this chapter is submitted; (2) reviewed and rev…
Ind. Code § 13-18-26-7 Denial of permit application for failure to include notarized
0.3K chars
certification Sec. 7. Failure to include a notarized certification with an application for a permit described in section 1(a) or 1(b) of this chapter constitutes grounds for denial of the permit application. As added by P.L.126-2018, SEC.6. Amended by P.L.15-2019, SEC.15.
Ind. Code § 13-20-26-0.5 "Applicant"
0.1K chars
Sec. 0.5. As used in this chapter, "applicant" means a person or company from the private sector. As added by P.L.153-2023, SEC.1.
Ind. Code § 13-20-26-1 Project established; purposes; project area; demonstration
3.9K chars
required of eligible applicants Sec. 1. (a) There is established a central Indiana waste diversion project for the following purposes: (1) Determining the most practical and effective means of: (A) addressing domestic supply chain disruptions that result in: (i) scarcity of raw m…
Ind. Code § 13-20-26-2 Project duties of department
2.9K chars
Sec. 2. (a) The department shall do the following: (1) Develop forms for applicants to the central Indiana waste diversion project that include the following: (A) Description of the methods for waste collection, sorting, and diversion. (B) Requirements for data collection and rep…
Ind. Code § 13-20-26-3 Award totals
0.2K chars
Sec. 3. To implement the second round of grants described in this chapter, the Indiana recycling market development board shall award not more than a total of two million dollars ($2,000,000) to applicants. As added by P.L.153-2023, SEC.4.