Ind. Code § 13-18-26-1 Certificate of completion required
1.6K chars
Sec. 1. (a) Except as provided in subsection (c), a permit required under IC 13-18-16 for the operation of a public water system may not be issued unless the application contains the certification of completion required under section 2 of this chapter. (b) Except as provided in s…
Ind. Code § 13-18-26-2 Certification that documents have been prepared
0.6K chars
Sec. 2. A permit described in section 1(a) or 1(b) of this chapter may not be issued unless the applicant submits, along with the permit application, a certification that all of the following documents have been prepared and are complete under the requirements of this chapter: (1…
Ind. Code § 13-18-26-3 Life cycle cost-benefit analysis
0.6K chars
Sec. 3. A life cycle cost-benefit analysis must include a comparison of the alternatives of: (1) meeting the water supply or wastewater service needs of the community or area served or proposed to be served through the operation of the water and wastewater treatment plant, as: (A…
Ind. Code § 13-18-26-4 Capital asset management plan
0.7K chars
Sec. 4. A capital asset management plan must include all of the following: (1) A plan to annually review infrastructure needs of the water or wastewater treatment plant. (2) A detailed engineering analysis of asset conditions and useful life, to be used to develop an infrastructu…