341 chapters · 3,670 sections in this title.
Ind. Code § 8-1-8.2-1 "Electric generation facility"
0.4K chars
Sec. 1. (a) As used in this chapter, "electric generation facility" means: (1) a facility; or (2) infrastructure associated with a facility; for the generation of electricity. (b) The term does not include the following: (1) A wind power device (as defined in IC 8-1-41-7). (2) A …
Ind. Code § 8-1-8.2-10 Construction of electric generation facility on energy production zone; exemption from permitting requirements or zoning approval; notice to local authority; required information; public hearing; notice of change
5.2K chars
Sec. 10. (a) A project owner is not required to obtain a permit, or any other land use or zoning approval, from a local authority for the construction of an electric generation facility if: (1) the commission: (A) grants the project owner a certificate under IC 8-1-8.5-2 for the …
Ind. Code § 8-1-8.2-11 Authority of local authority or unit to regulate siting,
0.4K chars
construction, of deployment of electric generation facility not located in energy production zone Sec. 11. This chapter may not be construed to increase or modify the authority of a local authority or a unit to regulate the siting, construction, or deployment of an electric gener…
"Energy production zone"
0.8K chars
Sec. 2. (a) As used in this chapter, "energy production zone" means a premise of land on which any of the following was located as of January 1, 2025: (1) An electric generation facility with a generating capacity of at least eighty (80) megawatts, regardless of whether the elect…