72 chapters · 1,850 sections in this title.
Iowa Code § 479B.29 Particular damage claims.
1.7K chars
1. Compensable losses shall include, but are not limited to, all of the following: a. Loss or reduced yield of crops or forage on the pipeline right-of-way, whether caused directly by construction or from disturbance of usual farm operations. b. Loss or reduced yield of crops or …
Iowa Code § 479B.3 Conditions attending operation.
0.3K chars
A pipeline company shall not construct, maintain, or operate a pipeline or underground storage facility under, along, over, or across any public or private highways, grounds, waters, or streams of any kind in this state except in accordance with this chapter . 95 Acts, ch 192, §3…
Iowa Code § 479B.30 Determination of construction damages.
5.0K chars
1. The county board of supervisors shall determine when construction of a pipeline or underground storage facility has been completed in that county for the purposes of this section . Not less than ninety days after the completion of construction and if an agreement cannot be mad…
Iowa Code § 479B.31 Subsequent tiling.
0.7K chars
All additional costs of new tile construction caused by an existing pipeline or underground storage facility shall be paid by the pipeline company. To receive compensation under this section , the landowner or agent of the landowner shall either present an invoice specifying the …