Iowa Code § 572.12 Time of filing against railway.
0.3K chars
Where a lien is claimed upon a railway, the subcontractor shall have ninety days from the last day of the month in which such labor was done or material furnished within which to file the claim therefor. [R60, §1851; C73, §2137; C97, §3092; C24, 27, 31, 35, 39, § 10281; C46, 50, …
Iowa Code § 572.13 General contractor — owner notice — residential construction.
1.4K chars
1. A general contractor who has contracted or will contract with a subcontractor to provide labor or furnish material for the property shall provide the owner with the following owner notice in writing in boldface type of a minimum size of ten points: Persons or companies furnish…
Iowa Code § 572.13A Notice of commencement of work — general contractor — owner-builder.
4.3K chars
1. Either a general contractor, or an owner-builder who has contracted or will contract with a subcontractor to provide labor or furnish material for the property, shall post a notice of commencement of work to the mechanics’ notice and lien registry internet site no later than t…
Iowa Code § 572.13B Preliminary notice — subcontractor — residential construction.
3.7K chars
1. A subcontractor shall post a preliminary notice to the mechanics’ notice and lien registry internet site. A preliminary notice posted before the balance due is paid to the general contractor or the owner-builder is effective as to all labor, service, equipment, and material fu…