929 sections in this chapter.
R.444.839 Elevated mound system: Design criteria.
3.7K chars
NAC 444.839 Elevated mound system: Design criteria. (NRS 439.200, 444.650) 1. An elevated mound system must not be constructed on a slope that is: (a) Greater than 6 percent, if the soils comprising the slope have percolation rates that are slower than 60 minutes per inch; or (b)…
R.444.8392 Elevated mound system: Inspections.
1.1K chars
NAC 444.8392 Elevated mound system: Inspections. (NRS 439.200, 444.650) 1. The construction of an elevated mound system must be inspected and verified by an engineer when: (a) The basal area of the elevated mound has been scarified; (b) The distribution lines have been placed in …
R.444.8394 Pressure distribution system: General requirements.
0.4K chars
NAC 444.8394 Pressure distribution system: General requirements. (NRS 439.200, 444.650) 1. A pressure distribution system may be used in conjunction with an elevated mound, absorption bed or absorption trench system. 2. An individual sewage disposal system that uses a pressure di…