445A-445A.67641 Submission to Division of set of as-built drawings of water project.
0.3K chars
NAC 445A.67641 Submission to Division of set of as-built drawings of water project. (NRS 445A.270) No later than 90 days after the completion of a water project, the recipient shall supply the Division with one set of drawings of the water project as it was built. (Added to NAC b…
445A-445A.67642 Final inspection and certification of performance of water project; corrective action.
2.3K chars
NAC 445A.67642 Final inspection and certification of performance of water project; corrective action. (NRS 445A.270) 1. After completion of the water project and before a recipient submits certification of a water project required pursuant to subsection 2, the recipient shall coo…
445A-445A.67643 Claims arising from or related to water project: Notification of Division; resolution.
0.4K chars
NAC 445A.67643 Claims arising from or related to water project: Notification of Division; resolution. (NRS 445A.270) A recipient: 1. Shall notify the Division of any claims against the owner, the professional engineer, the contractor or any subcontractor arising from or related t…