NRS 701A.343 “Term of construction” defined. [Effective through June 30, 2049.] “Term of construction” means the period which begins when a building permit is issued for the construction of a facility and ends: 1. When the facility goes online; or 2. At such other time as the Director may determine. (Added to NRS by 2023, 639)