When any underground facility is damaged, the excavator causing the damage shall immediately notify the affected operator. The excavation shall not be backfilled without first receiving permission from the operator whose facility was damaged.
RSA 374:54
RSA 374:54
When any underground facility is damaged, the excavator causing the damage shall immediately notify the affected operator. The excavation shall not be backfilled without first receiving permission from the operator whose facility was damaged.