R.19.14.101-19.14.101.4 DURATION
0.0K chars
[RESERVED]
R.19.14.101-19.14.101.5 EFFECTIVE DATE
[November 15, 1983]
R.19.14.101-19.14.101.6 OBJECTIVE
Showing 44,551–44,600 of 54,212
Page 892 of 1085
R.19.14.101-19.14.101.7 DEFINITIONS
R.19.14.101-19.14.101.8 GENERAL
0.5K chars
A. In areas where high subsurface pressures are known to exist, or where there is a history of lost circulation and/or blowouts, or in areas where subsurface pressures are not known, all proper and usual precautions shall be taken for keeping the well under control, including the…
R.19.14.102-19.14.102.1 ISSUING AGENCY
0.1K chars
Energy and Minerals Department, Oil Conservation Division, P.O. Box 2088, Santa Fe, New Mexico.
R.19.14.102-19.14.102.2 SCOPE
R.19.14.102-19.14.102.3 STATUTORY AUTHORITY
R.19.14.102-19.14.102.4 DURATION
R.19.14.102-19.14.102.5 EFFECTIVE DATE
R.19.14.102-19.14.102.6 OBJECTIVE
R.19.14.102-19.14.102.7 DEFINITIONS
R.19.14.102-19.14.102.8 BLOWOUT PREVENTION EQUIPMENT (BOPE)
5.3K chars
The following standards are not given as final blowout prevention equipment requirements for the drilling of any geothermal resources well but are given as guidelines for the preparation of a minimum blowout prevention program for certain categories of wells. A. Using Mud as the …
R.19.14.103-19.14.103.1 ISSUING AGENCY
R.19.14.103-19.14.103.2 SCOPE
R.19.14.103-19.14.103.3 STATUTORY AUTHORITY
R.19.14.103-19.14.103.4 DURATION
R.19.14.103-19.14.103.5 EFFECTIVE DATE
R.19.14.103-19.14.103.6 OBJECTIVE
R.19.14.103-19.14.103.7 DEFINITIONS
R.19.14.103-19.14.103.8 AREAS WITH HISTORY OF BLOWOUTS
0.3K chars
Notwithstanding any of the provisions of Rule G-602 [now 19.14.102 NMAC], above, when drilling in any geothermal resources area which has a history of lost circulation and/or blowouts, the operator shall equip the well with adequate blowout prevention equipment to contain such pr…
R.19.14.104-19.14.104.1 ISSUING AGENCY
R.19.14.104-19.14.104.2 SCOPE
R.19.14.104-19.14.104.3 STATUTORY AUTHORITY
R.19.14.104-19.14.104.4 DURATION
R.19.14.104-19.14.104.5 EFFECTIVE DATE
R.19.14.104-19.14.104.6 OBJECTIVE
R.19.14.104-19.14.104.7 DEFINITIONS
R.19.14.104-19.14.104.8 TESTING OF BLOWOUT PREVENTION EQUIPMENT
0.8K chars
A. Upon installation, ram-type blowout preventers, bag-type blowout preventers, valves and manifolds shall be tested to a minimum of 750 psi pressure. Tests may be witnessed by a division representative on all wells prior to drilling out the shoe of the surface casing, and the di…
R.19.14.110-19.14.110.1 ISSUING AGENCY (REPEALED)
(Reserved.)
R.19.14.110-19.14.110.2 SCOPE (REPEALED)
R.19.14.110-19.14.110.3 STATUTORY AUTHORITY (REPEALED)
R.19.14.110-19.14.110.4 DURATION (REPEALED)
R.19.14.110-19.14.110.5 EFFECTIVE DATE (REPEALED)
R.19.14.110-19.14.110.6 OBJECTIVE (REPEALED)
R.19.14.110-19.14.110.7 DEFINITIONS (REPEALED)
R.19.14.110-19.14.110.8 NECESSITY FOR HEARING (REPEALED)
R.19.14.111-19.14.111.1 ISSUING AGENCY (REPEALED)
R.19.14.111-19.14.111.2 SCOPE (REPEALED)
R.19.14.111-19.14.111.3 STATUTORY AUTHORITY (REPEALED)
R.19.14.111-19.14.111.4 DURATION (REPEALED)
R.19.14.111-19.14.111.5 EFFECTIVE DATE (REPEALED)
R.19.14.111-19.14.111.6 OBJECTIVE (REPEALED)
R.19.14.111-19.14.111.7 DEFINITIONS (REPEALED)
R.19.14.111-19.14.111.8 EMERGENCY ORDERS (REPEALED)
R.19.14.112-19.14.112.1 ISSUING AGENCY (REPEALED)
R.19.14.112-19.14.112.2 SCOPE (REPEALED)
R.19.14.112-19.14.112.3 STATUTORY AUTHORITY (REPEALED)
R.19.14.112-19.14.112.4 DURATION (REPEALED)
R.19.14.112-19.14.112.5 EFFECTIVE DATE (REPEALED)