54,212 sections across 3,422 New Mexico regulatory chapters.
R.19.26.2-19.26.2.12 APPLICATION PROCESSING
10.0K chars
This section describes the process in which applications filed pursuant to 19.26.2.10 or 19.26.2.11 NMAC will be processed. A. Return of application: The state engineer may return an application to the applicant, with a statement of corrections required, if the application is fou…
R.19.26.2-19.26.2.13 PERMITS
9.6K chars
Upon state engineer approval an application becomes a permit. A permit allows the permittee to place water to beneficial use in accordance with the permit conditions of approval. A. Construction of works and proof of completion: No works for the storage, diversion, or carriage of…
R.19.26.2-19.26.2.14 LIVESTOCK WATER IMPOUNDMENTS
6.5K chars
A permit is required to impound surface water for watering livestock. If the proposed impoundment is created by a dam that exceeds ten feet in height measured from the lowest point on the downstream toe to the dam crest, or exceeds ten acre-feet in storage capacity, the applicant…