54,212 sections across 3,422 New Mexico regulatory chapters.
R.19.8.36-19.8.36.42 UNDERGROUND MINING GENERAL PERFORMANCE STANDARDS: DAMS CONSTRUCTED OF WASTE MATERIAL (717.18)
6.1K chars
A. General. No waste material shall be used in existing or new dams without the approval of the regulatory authority. The permittee shall design, locate, construct, operate, maintain, modify and abandon or remove all dams (used either temporarily or permanently) constructed of wa…
R.19.8.36-19.8.36.43 UNDERGROUND MINING GENERAL PERFORMANCE STANDARDS: TOPSOIL HANDLING AND REVEGETATION (717.20)
1.1K chars
A. Topsoil shall be removed as a separate operation from areas to be disturbed by surface operations such as roads and areas upon which support facilities are to be sited. Selected overburden materials may be used instead of, or as a substitute for topsoil where the resulting soi…
R.19.8.36-19.8.36.44 UNDERGROUND MINING GENERAL PERFORMANCE STANDARDS: COAL EXPLORATION
0.5K chars
Prior to conducting any exploration, any person must file with the Director notice of intention to explore and such notice shall include a description of the exploration area and the period of supposed exploration; and provisions for reclamation in accordance with the performance…