Limits on Additional Customer Generators. Notwithstanding the requirements of this chapter, an electric utility shall not be obligated to provide net energy metering to additional customer-generators in a control area when the combined total peak available capacity of all eligible customer-generators in the control area equals 30 percent of the system peak demand of the control area; provided that the regulator may increase, by rule or order, this percentage amount, when it finds that no undue harm will likely come to the utility’s ability to meet load by increasing the percentage. Source: PL 15-23, § 2(8635), modified; amended by PL 15-87 § 2(8635). Commission Comment: The Commission substituted “this chapter” for “this Act”and changed capitalization pursuant to 1 CMC § 3806(c) and (f).