Act 103 of 2006, § 6, under HIGHWAY-RAILROAD AND HIGHWAY BRIDGE CAPITAL BUDGET SUPPLEMENTAL ACT FOR 2005-2006.

Act 103 of 2006, § 6

Section 6. Allegheny County.

(a) Local Bridges

(1) South Park Township, Wallace Road Bridge over Catfish Run near Brownsville Road, Bridge Replacement

120,000

(Base Construction Allocation - $120,000)

(2) Findlay Township, Steubenville-Enlow Road over Montour Run, Bridge Replacement

819,000

(Base Construction Allocation - $819,000)

(3) South Park Township, Wood Street over Piney Fork Creek, Bridge Replacement

298,000

(Base Construction Allocation - $298,000)

(4) Moon Township, Spring Run Road over Boggs Run, Bridge Replacement

390,000

(Base Construction Allocation - $390,000)

(5) South Park Township, B. Corrigan Drive at Horse Barn in Park over Catfish Run, Bridge Replacement

250,000

(Base Construction Allocation - $250,000)

(6) South Fayette Township, Parks Run Road over Millers Run, Bridge Replacement

480,000

(Base Construction Allocation - $480,000)

(7) South Fayette Township, 2000 Feet North of SR 3001 over Miller Run Road/Fishing Run Road, Bridge Replacement

650,000

(Base Construction Allocation - $650,000)

(8) Collier Township, Scotts Run Road over Scotts Run, Bridge Replacement

350,000

(Base Construction Allocation - $350,000)

(9) Collier Township, Thoms Run Road over Woods Run, Bridge Replacement

650,000

(Base Construction Allocation - $650,000)

(10) Edgeworth Borough, Woodland Road Extension over CSX Railroad, Bridge Replacement

4,664,000

(Base Construction Allocation - $4,664,000)

(11) Edgeworth Borough, Woodland Road Extension over Little Sewickley Creek, Bridge Replacement

424,000

(Base Construction Allocation - $424,000)

(12) Bethel Park Borough, Bethel Park N&W Railroad over Railroad, Bridge Replacement

3,982,000

(Base Construction Allocation - $3,982,000)

(13) Sewickley Hills Borough, Glenfield Road over Tributary of Kilbuck Run, Bridge Replacement

519,000

(Base Construction Allocation - $519,000)

(14) South Park Township, Brownsville Road over Lick Run, Bridge Replacement

310,000

(Base Construction Allocation - $310,000)

(15) Findlay Township, Clinton-Enlow Road over North Branch of Montour Run, Bridge Replacement

204,000

(Base Construction Allocation - $204,000)

(16) Sewickley Hills Borough, Pony Hollow Road over Tributary of Little Sewickley Creek, Bridge Replacement

519,000

(Base Construction Allocation - $519,000)

(17) Sewickley Heights Borough, Pony Hollow Road over Tributary of Little Sewickley Creek, Bridge Replacement

410,000

(Base Construction Allocation - $410,000)

(18) Osborne Borough, Beaver Street over Davis Run, Bridge Replacement

350,000

(Base Construction Allocation - $350,000)

(19) North Fayette Township, Main Street over Robinson Run, Bridge Replacement

859,000

(Base Construction Allocation - $859,000)

(20) Jefferson Hills, Cochran Mills Road over N&W Railroad, Bridge Replacement

4,979,000

(Base Construction Allocation - $4,979,000)

(21) Kilbuck Township, Camp Horne Road over Tributary of Lowries Run, Bridge Replacement

281,000

(Base Construction Allocation - $281,000)

(22) North Fayette Township, Hans Road over North Branch of Robinson Run, Bridge Replacement

327,000

(Base Construction Allocation - $327,000)

(23) South Fayette Township, 100 Feet West of SR 3026 over Miller Run Road/Dolphin Road, Bridge Replacement

186,000

(Base Construction Allocation - $186,000)

(24) Ross Township, Hillcrest Drive over Hillcrest Drive, Bridge Rehabilitation

36,000

(Base Construction Allocation - $30,000)

(Land Allocation - $6,000)

(25) South Park Township, McElheny Road over Lick Run, Bridge Replacement

30,000

(Base Construction Allocation - $30,000)

(26) South Park Township, Wallace Road over Lick Run, Bridge Replacement

30,000

(Base Construction Allocation - $30,000)

(27) South Park Township, Brandis Avenue at Stewart Road over Tributary of Piney Fork Creek, Bridge Replacement

25,000

(Base Construction Allocation - $25,000)

(28) Bethel Park Borough, Brookside Boulevard over Graesers Run, Bridge Replacement

120,000

(Base Construction Allocation - $120,000)

(29) South Park Township, McElheny Road near Cochran Mill Road over Lick Run, Bridge Replacement

30,000

(Base Construction Allocation - $30,000)

(30) South Fayette Township, Millers Run Road over Small Stream, Bridge Replacement

26,000

(Base Construction Allocation - $26,000)

(31) South Park Township, Wilson Road over Lick Run, Bridge Replacement

10,000

(Base Construction Allocation - $10,000)

(32) Pleasant Hills Borough, Pleasant Hills Boulevard Pedestrian Bridge over Old Lebanon Church Road, Bridge Rehabilitation

7,000

(Base Construction Allocation - $7,000)

(33) Neville Township, Fleming Park Bridge over Ohio River Back Channel and Railroad, Bridge Replacement

3,123,000

(Base Construction Allocation - $3,066,000)

(Design and Contingencies - $57,000)

(34) Moon Township, T-300, North Flaugherty Run Road over Tributary of Flaugherty Run Creek, Bridge Replacement

150,000

(Base Construction Allocation - $125,000)

(Design and Contingencies - $25,000)

(35) Moon Township, T-114, Becks Run Road over Tributary of Flaugherty Run Creek, Bridge Replacement

150,000

(Base Construction Allocation - $125,000)

(Design and Contingencies - $25,000)

(36) Hampton Township, T-760 over West Bardonner Road, Bridge Replacement

265,000

(Base Construction Allocation - $240,000)

(Design and Contingencies - $25,000)

(37) Bethel Park Borough, Sarah Street over Tributary No.1 of Piney Fork Creek, Streambed, Bridge Replacement

50,000

(Base Construction Allocation - $50,000)

(38) Nelson Township, Nelson Run Road over Nelson Run, Bridge Replacement

75,000

(Base Construction Allocation - $60,000)

(Land Allocation - $5,000)

(Design and Contingencies - $10,000)

(39) Upper St. Clair Township, Bower Hill Road over Painters Run, Bridge Replacement

290,000

(Base Construction Allocation - $290,000)

(40) Ben Avon Borough, 0.25 Mile Southeast of SR 4021 over Ohio River Boulevard, Spruce Run Creek, Spruce Street, Bridge Replacement

91,000

(Base Construction Allocation - $91,000)

(41) Ben Avon Borough, Forest Avenue over Ohio River, Bridge Replacement

396,000

(Base Construction Allocation - $396,000)

(42) South Park Township, Wallace Road near Brownville Road over Piney Fork Creek, Bridge Replacement

350,000

(Base Construction Allocation - $350,000)

(b) State Bridges

(1) SR 4043, Red Mud Hollow Road over I-79, Sewickley Hills Borough, Bridge Replacement

10,548,000

(Base Construction Allocation - $10,548,000)

(2) I-79 South over SR 0050, South Fayette Township, Bridge Replacement

24,575,000

(Base Construction Allocation - $24,575,000)

(3) I-79 North over SR 0050, South Fayette Township, Bridge Replacement

24,575,000

(Base Construction Allocation - $24,575,000)

(4) Brownsville, Curry Road over Lick Run, South Park Township, Bridge Replacement

310,000

(Base Construction Allocation - $310,000)

(5) Piney Fork Road, Bridge No.1 over Piney Fork Creek, South Park Township, Bridge Replacement

60,000

(Base Construction Allocation - $60,000)

(6) I-79 Northbound and Southbound over Presley Road, Collier Township, Bridge Replacement

38,766,000

(Base Construction Allocation - $38,766,000)

(7) Thoms Run Road over Woods Run, Collier Township, Bridge Replacement

650,000

(Base Construction Allocation - $650,000)

(8) SR 3070, Boggs Road over Branch of South Fork of Montour Run, Findlay Township, Bridge Replacement

650,000

(Base Construction Allocation - $650,000)

(9) SR 3088, Hookstown Grade Road over Route 60 Business, Findlay Township, Bridge Replacement

1,830,000

(Base Construction Allocation - $1,830,000)

(10) SR 3070, McClaren Road and Main Street over Montour Run Stream, Findlay Township, Bridge Restoration

220,000

(Base Construction Allocation - $200,000)

(Design and Contingencies - $20,000)

(11) Potato Garden Road over Branch of Potato Garden Run, Findlay Township, Bridge Replacement

650,000

(Base Construction Allocation - $650,000)

(12) SR 3071, Potato Garden Road over Potato Garden Run Bridge No.1, Findlay Township, Bridge Replacement

570,000

(Base Construction Allocation - $570,000)

(13) SR 3071, Potato Garden Road over Potato Garden Run Bridge No.2, Findlay Township, Bridge Replacement

382,000

(Base Construction Allocation - $382,000)

(14) SR 3071, Culvert between Burgettstown and Boggs Road over Potato Garden Run, Findlay Township, Bridge Replacement

165,000

(Base Construction Allocation - $150,000)

(Design and Contingencies - $15,000)

(15) SR 0065, Red Gate over Hay's Run, Haysville Borough, Bridge Replacement

650,000

(Base Construction Allocation - $650,000)

(16) SR 0837, Snowden Road over Lobbs Run, Jefferson Hills Borough, Bridge Replacement

450,000

(Base Construction Allocation - $450,000)

(17) Camp Horne Road over Tributary of Lowries Run, Kilbuck Township, Bridge Replacement

281,000

(Base Construction Allocation - $281,000)

(18) SR 0065, Ohio River Boulevard over Toms Run, Kilbuck Township, Bridge Rehabilitation

650,000

(Base Construction Allocation - $650,000)

(19) SR 3077, Broadhead Road over Flaugherty Run Creek, Moon Township, Bridge Replacement

2,015,000

(Base Construction Allocation - $1,650,000)

(Land Allocation - $200,000)

(Design and Contingencies - $165,000)

(20) Ewing Road over Meek Run, Moon Township, Bridge Replacement

650,000

(Base Construction Allocation - $650,000)

(21) North Flaugherty Run Road over Boggs Run, Moon Township, Bridge Replacement

341,000

(Base Construction Allocation - $341,000)

(22) Spring Run Road Extension over Boggs Run, Moon Township, Bridge Replacement

390,000

(Base Construction Allocation - $390,000)

(23) Mt. Nebo Interchange over I-79, Ohio Township, Bridge Replacement

4,182,000

(Base Construction Allocation - $4,182,000)

(24) Woodland Road Extension over CSX Railroad, Edgeworth Borough, Bridge Replacement

4,664,000

(Base Construction Allocation - $4,664,000)

(25) Gregg Station Road over Robinson Run, Collier Township, Bridge Replacement

997,000

(Base Construction Allocation - $997,000)

(26) SR 3048 over Robinson Run, Collier Township, Bridge Rehabilitation

6,401,000

(Base Construction Allocation - $6,045,000)

(Land Allocation - $20,000)

(Design and Contingencies - $336,000)

(27) Hans Road over North Branch of Robinson Run, North Fayette Township, Bridge Replacement

328,000

(Base Construction Allocation - $328,000)

(28) Pony Hollow Road over Tributary of Little Sewickley Creek, Sewickley Heights Borough, Bridge Replacement

410,000

(Base Construction Allocation - $410,000)

(29) SR 0051, Saw Mill Run Boulevard over Weyman Run, Whitehall Borough, Bridge Replacement

650,000

(Base Construction Allocation - $650,000)

(30) SR 2005 over Kelly Run Bridge No.2, Forward Township, Bridge Replacement

520,000

(Base Construction Allocation - $500,000)

(Design and Contingencies - $20,000)

(31) SR 3004 over McLaughlin Run, Upper St. Clair Township, Bridge Rehabilitation

700,000

(Base Construction Allocation - $700,000)

(32) SR 0022 and SR 0980 Intersection, Steubenville Pike over Abandoned Montour Railroad, North Fayette Township, Bridge Replacement

1,800,000

(Base Construction Allocation - $1,800,000)

(33) SR 0065, Ohio River Boulevard over Birmingham Avenue, Avalon Borough, Bridge Replacement

440,000

(Base Construction Allocation - $440,000)

(34) SR 4023, New Brighton Road over Spruce Run, Avalon Borough, Bridge Replacement

650,000

(Base Construction Allocation - $650,000)

(35) Turkey Foot Road over Big Sewickley Creek Road, Bell Acres Borough, Bridge Replacement

650,000

(Base Construction Allocation - $650,000)

(36) SR 4021 over Ohio River Boulevard, Ben Avon Borough, Bridge Replacement

91,000

(Base Construction Allocation - $91,000)

(37) Bethel Park Municipality over Graesers Run, Bethel Park Borough, Bridge Replacement

120,000

(Base Construction Allocation - $120,000)

(38) SR 3008, Morrow Road over McLaughlin Run, Upper St. Clair Township, Bridge Rehabilitation

300,000

(Base Construction Allocation - $300,000)

(39) SR 3048, Noblestown Road over Scotts Run, Collier Township, Bridge Replacement

350,000

(Base Construction Allocation - $350,000)

(40) SR 3048, Noblestown Road over North Branch of Robinson Run, North Fayette Township, Bridge Replacement

650,000

(Base Construction Allocation - $650,000)

(41) SR 3008, Morrow Road over McLaughlin Run, Upper St. Clair Township, Bridge Replacement

360,000

(Base Construction Allocation - $360,000)

(42) SR 3034, Lesnett Road over McLaughlin Run, Upper St. Clair Township, Bridge Replacement

500,000

(Base Construction Allocation - $500,000)

(43) SR 3108, North Branch Road over North Branch of Robinson Run, North Fayette Township, Bridge Replacement

650,000

(Base Construction Allocation - $650,000)

(44) SR 3051 over North Branch of Robinson Run, North Fayette Township, Bridge Replacement

370,000

(Base Construction Allocation - $370,000)

(45) SR 3051, North Branch Road over Robinson Run, North Fayette Township, Bridge Replacement

6,500,000

(Base Construction Allocation - $6,500,000)

(46) SR 3063 over Robinson Run, North Fayette Township, Bridge Replacement

18,000,000

(Base Construction Allocation - $18,000,000)

(47) SR 3005, Mayview Road over Chartiers Creek, South Fayette Township, Bridge Replacement

400,000

(Base Construction Allocation - $400,000)

(48) SR 0051, Clairton Boulevard over Lewis Run, Pleasant Hills Borough, Bridge Replacement

550,000

(Base Construction Allocation - $550,000)

(49) SR 3014, Piney Fork Road Bridge No.2 over Piney Fork Creek, South Park Township, Bridge Replacement

5,535,000

(Base Construction Allocation - $5,535,000)

(50) SR 3013, Brownsville Road over Piney Fork, South Park Township, Bridge Replacement

1,040,000

(Base Construction Allocation - $1,040,000)

(51) SR 3051, Weyman Road over Saw Mill Run, Whitehall Borough, Bridge Replacement

570,000

(Base Construction Allocation - $570,000)

(52) SR 3026, Sygan-Glyther Road over Millers Road, South Fayette Township, Bridge Replacement

2,715,000

(Base Construction Allocation - $2,715,000)

(53) SR 3051 over SR 0022, North Fayette Township, Bridge Replacement

1,250,000

(Base Construction Allocation - $1,250,000)

(53.1) SR 3089 and Stoops Ferry Road over Flaugherty Run, Moon Township, Bridge Replacement

1,096,000

(Base Construction Allocation - $1,096,000)

(54) SR 3048, Grant Street over Robinson Run, Collier Township, Bridge Replacement

901,000

(Base Construction Allocation - $901,000)

(55) SR 3048, Noblestown Road over Robinson Run, Collier Township, Bridge Replacement

400,000

(Base Construction Allocation - $400,000)

(56) I-79 over Pitt-Ind Railroad and Robinson Run, Collier Township, Bridge Replacement

11,293,000

(Base Construction Allocation - $11,293,000)

(57) Ramp D Road over Ohio Creek, Robinson Run, Collier Township, Bridge Replacement

9,173,000

(Base Construction Allocation - $9,173,000)

(58) SR 3117, Noblestown Road over Ohio Creek, Collier Township, Bridge Replacement

3,450,000

(Base Construction Allocation - $3,450,000)

(59) SR 3117, Dorrington Road over Robinson Run, Collier Township, Bridge Replacement

11,995,000

(Base Construction Allocation - $11,995,000)

(60) I-79 over Collier Road, Collier Township, Bridge Replacement

5,261,000

(Base Construction Allocation - $5,261,000)

(61) I-79 over Chartiers Creek, Collier Township, Bridge Replacement

2,210,000

(Base Construction Allocation - $2,210,000)

(62) SR 3004, McLaughlin Run Road over McLaughlin Run, Bridgeville Borough, Bridge Replacement

227,000

(Base Construction Allocation - $227,000)

(63) SR 0088, Library Road Bridge No.1 over Piney Fork Creek, Bethel Park Borough, Bridge Rehabilitation

161,000

(Base Construction Allocation - $128,000)

(Land Allocation - $20,000)

(Design and Contingencies - $13,000)

(64) SR 3034, McMillan Road over McLaughlin Run, Upper St. Clair Township, Bridge Replacement

570,000

(Base Construction Allocation - $570,000)

(65) SR 1016 over I-79 and Chartiers Creek, Collier Township, Bridge Replacement

2,079,000

(Base Construction Allocation - $2,079,000)

(66) SR 3071, Potato Garden Road over Tributary of Potato Garden Run, Findlay Township, Bridge Replacement

650,000

(Base Construction Allocation - $650,000)

(67) SR 0065, Ohio River Boulevard, Herron Avenue over Lowries Run, Emsworth Borough, Bridge Replacement

560,000

(Base Construction Allocation - $560,000)

(68) SR 0065, Ohio River Boulevard over Norfolk Southern Railroad, Leetsdale Borough, Bridge Replacement

14,615,000

(Base Construction Allocation - $14,615,000)

(69) SR 3089, Flaugherty Run Road over Flaugherty Run, Moon Township, Bridge Replacement

1,067,000

(Base Construction Allocation - $1,067,000)

(70) SR 3007, Walton Road over Lobbs Run, Jefferson Hills, Bridge Replacement

560,000

(Base Construction Allocation - $560,000)

(71) SR 1050 over Lobbs Run, Jefferson Hills, Bridge Replacement

450,000

(Base Construction Allocation - $450,000)

(72) SR 0088, Library Road Bridge No.2 over Piney Fork Creek, Bethel Park Borough, Bridge Rehabilitation

161,000

(Base Construction Allocation - $128,000)

(Land Allocation - $20,000)

(Design and Contingencies - $13,000)

(73) SR 0834 over Hay's Run, Haysville Borough, Bridge Replacement

650,000

(Base Construction Allocation - $650,000)

(74) SR 0060, Ramp AP-14 Road over Ramp EP-E, Ramp P-4, Findlay Township, Bridge Replacement

2,293,000

(Base Construction Allocation - $2,293,000)

(75) SR 0060, Ramp AP-10 Road over Ramp EP-E, Ramp CM, Findlay Township, Bridge Replacement

2,293,000

(Base Construction Allocation - $2,293,000)

(76) SR 3078, Burgettstown Road over Potato Garden Run, Findlay Township, Bridge Rehabilitation

176,000

(Base Construction Allocation - $148,000)

(Land Allocation - $10,000)

(Design and Contingencies - $18,000)

(77) SR 0065, Ohio River Boulevard, Gibson Street over Lowries Run, Emsworth Borough, Bridge Replacement

416,000

(Base Construction Allocation - $416,000)

(78) SR 3018, Scheinbach Road over Lobbs Run, Jefferson Hills, Bridge Replacement

450,000

(Base Construction Allocation - $450,000)

(79) SR 0837, Homestead Bridge Ramps, City of Pittsburgh, West Homestead Borough, Bridge Rehabilitation

2,185,000

(Base Construction Allocation - $1,780,000)

(Land Allocation - $69,000)

(Design and Contingencies - $336,000)

(80) SR 4011, Rochester Road Bridge over SR 1021-I-79, I-279, Franklin Park Borough, Bridge Replacement

511,000

(Base Construction Allocation - $421,000)

(Land Allocation - $40,000)

(Design and Contingencies - $50,000)

(81) SR 0028, SH over Yutes Run, Springdale Township, Bridge Preservation

176,000

(Base Construction Allocation - $86,000)

(Land Allocation - $40,000)

(Design and Contingencies - $50,000)

(82) SR 0279, Raymond P. Shafer Highway over I-279 Southbound, Franklin Park Borough, Bridge Rehabilitation

280,000

(Base Construction Allocation - $235,000)

(Land Allocation - $20,000)

(Design and Contingencies - $25,000)

(83) SR 0885, Mifflin Road Bridge over Branch of Streets Run, City of Pittsburgh, Bridge Replacement

149,000

(Base Construction Allocation - $59,000)

(Land Allocation - $40,000)

(Design and Contingencies - $50,000)

(84) SR 0885, Lebanon Road Bridge over Branch of Streets Run, City of Pittsburgh and West Mifflin Borough, Bridge Replacement

127,000

(Base Construction Allocation - $37,000)

(Land Allocation - $40,000)

(Design and Contingencies - $50,000)

(85) SR 1010, Harts Run Road over Little Pine Creek, Indiana Township, Bridge Replacement

102,000

(Base Construction Allocation - $12,000)

(Land Allocation - $40,000)

(Design and Contingencies - $50,000)

(86) SR 2010, Lovedale Road Bridge over Branch of Wylie Run, Lincoln Borough, Bridge Replacement

107,000

(Base Construction Allocation - $17,000)

(Land Allocation - $40,000)

(Design and Contingencies - $50,000)

(87) SR 2010, Lovedale Road Bridge over Wylie Run Seg.0040, Elizabeth Township and Lincoln Borough, Bridge Replacement

114,000

(Base Construction Allocation - $24,000)

(Land Allocation - $40,000)

(Design and Contingencies - $50,000)

(88) SR 2046, Streets Run Road Bridge, Seg.0030/0580, Baldwin Borough, Bridge Rehabilitation

236,000

(Base Construction Allocation - $146,000)

(Land Allocation - $40,000)

(Design and Contingencies - $50,000)

(89) SR 2046, Streets Run Road Bridge, Seg.0040/1678, Baldwin Borough, Bridge Rehabilitation

112,000

(Base Construction Allocation - $22,000)

(Land Allocation - $40,000)

(Design and Contingencies - $50,000)

(90) SR 2046, Streets Run Road Bridge, Seg.0060/0897, West Mifflin and Baldwin Boroughs, Bridge Replacement

125,000

(Base Construction Allocation - $35,000)

(Land Allocation - $40,000)

(Design and Contingencies - $50,000)

(91) SR 2046, Streets Run Road Bridge, Seg.0080/1088, West Mifflin and Baldwin Boroughs, Bridge Replacement

110,000

(Base Construction Allocation - $20,000)

(Land Allocation - $40,000)

(Design and Contingencies - $50,000)

(92) SR 3037, Castle Shannon Boulevard over Saw Mill Run, Castle Shannon Borough, Bridge Replacement

173,000

(Base Construction Allocation - $83,000)

(Land Allocation - $40,000)

(Design and Contingencies - $50,000)

(93) SR 3048, Noblestown Road over Branch of Robinson Run, North Fayette Township, Bridge Rehabilitation

99,000

(Base Construction Allocation - $9,000)

(Land Allocation - $40,000)

(Design and Contingencies - $50,000)

(94) SR 4017, Pine Creek Road over Little Pine Creek, Shaler Township, Bridge Replacement

174,000

(Base Construction Allocation - $84,000)

(Land Allocation - $40,000)

(Design and Contingencies - $50,000)

(95) SR 3048, Noblestown Road over Branch of Chartiers Creek, Collier Township, Bridge Rehabilitation

96,000

(Base Construction Allocation - $6,000)

(Land Allocation - $40,000)

(Design and Contingencies - $50,000)

(96) SR 0022, SH over Potato Garden Road, North Fayette Township, Bridge Rehabilitation

523,000

(Base Construction Allocation - $433,000)

(Land Allocation - $40,000)

(Design and Contingencies - $50,000)

(97) SR 0279, Penn Lincoln Parkway over Poplar Avenue, Green Tree Borough, Bridge Replacement

413,000

(Base Construction Allocation - $368,000)

(Land Allocation - $20,000)

(Design and Contingencies - $25,000)

(98) SR 0079, Raymond P. Shafer Highway over SR 4051 Mingo Road, Marshall Township, Bridge Rehabilitation

179,000

(Base Construction Allocation - $134,000)

(Land Allocation - $20,000)

(Design and Contingencies - $25,000)

(99) SR 0079, Raymond P. Shafer Highway over Mingo Road, Marshall Township, Bridge Rehabilitation

167,000

(Base Construction Allocation - $122,000)

(Land Allocation - $20,000)

(Design and Contingencies - $25,000)

(100) SR 0079, Raymond P. Shafer Highway over Warrendale Bayne Road, Marshall Township, Bridge Rehabilitation

327,000

(Base Construction Allocation - $282,000)

(Land Allocation - $20,000)

(Design and Contingencies - $25,000)

(101) SR 0079, Raymond P. Shafer Highway over Warrendale Bayne Road, Marshall Township, Bridge Rehabilitation

285,000

(Base Construction Allocation - $240,000)

(Land Allocation - $20,000)

(Design and Contingencies - $25,000)

(102) SR 0079, Raymond P. Shafer Highway over I-76, Pennsylvania Turnpike, Marshall Township, Bridge Rehabilitation

184,000

(Base Construction Allocation - $139,000)

(Land Allocation - $20,000)

(Design and Contingencies - $25,000)

(103) SR 0376, Parkway East Highway over Old William Penn Highway, Monroeville Borough, Bridge Replacement

942,000

(Base Construction Allocation - $897,000)

(Land Allocation - $20,000)

(Design and Contingencies - $25,000)

(104) SR 0376, Parkway East 277+84 over LR 187, US 22 Business, Monroeville Borough, Bridge Rehabilitation

206,000

(Base Construction Allocation - $161,000)

(Land Allocation - $20,000)

(Design and Contingencies - $25,000)

(105) SR 0030, Lincoln Highway over LR 639, Electric Avenue, Chalfant Borough, Bridge Replacement

1,003,000

(Base Construction Allocation - $913,000)

(Land Allocation - $40,000)

(Design and Contingencies - $50,000)

(106) SR 4049, Nicholson Road over I-79 Northbound and Southbound, Franklin Park Borough, Bridge Rehabilitation

499,000

(Base Construction Allocation - $409,000)

(Land Allocation - $40,000)

(Design and Contingencies - $50,000)

(107) SR 2103, Bigelow Boulevard over 7th Avenue, Rosslyn Farms Borough, Bridge Rehabilitation

209,000

(Base Construction Allocation - $119,000)

(Land Allocation - $40,000)

(Design and Contingencies - $50,000)

(108) SR 3027, Georgetown Road over Branch of Mill Creek, Springdale Township, Bridge Rehabilitation

103,000

(Base Construction Allocation - $13,000)

(Land Allocation - $40,000)

(Design and Contingencies - $50,000)

(109) SR 3027, Georgetown Road over Mill Creek, Fawn Township, Bridge Replacement

193,000

(Base Construction Allocation - $103,000)

(Land Allocation - $40,000)

(Design and Contingencies - $50,000)

(110) SR 0028, SH over LR 02169, Yutes Run Road, Collier Township, Bridge Replacement

216,000

(Base Construction Allocation - $126,000)

(Land Allocation - $40,000)

(Design and Contingencies - $50,000)

(111) SR 1034, Bull Creek Road over Branch of Bull Creek, Scott Township, Bridge Replacement

114,000

(Base Construction Allocation - $24,000)

(Land Allocation - $40,000)

(Design and Contingencies - $50,000)

(112) SR 3028, Grant Street over Robinson Run, Findlay Township, Bridge Replacement

218,000

(Base Construction Allocation - $128,000)

(Land Allocation - $40,000)

(Design and Contingencies - $50,000)

(113) SR 3052, Greentree Road over Chartiers Creek, Scott Township, Bridge Replacement

1,222,000

(Base Construction Allocation - $1,132,000)

(Land Allocation - $40,000)

(Design and Contingencies - $50,000)

(114) SR 3071, Potato Garden Road over Potato Garden Run, Findlay Township, Bridge Rehabilitation

110,000

(Base Construction Allocation - $20,000)

(Land Allocation - $40,000)

(Design and Contingencies - $50,000)

(115) SR 4011, Rochester Road over LR 1021 and I-79, I-279 Franklin Park Borough, Bridge Rehabilitation

512,000

(Base Construction Allocation - $422,000)

(Land Allocation - $40,000)

(Design and Contingencies - $50,000)

(116) SR 0008, William Flynn Highway over Small Stream, Hampton Township, Bridge Replacement

128,000

(Base Construction Allocation - $38,000)

(Land Allocation - $40,000)

(Design and Contingencies - $50,000)

(117) SR 0008, William Flynn Highway over West Branch of Deer Creek, Richland Township, Bridge Rehabilitation

134,000

(Base Construction Allocation - $44,000)

(Land Allocation - $40,000)

(Design and Contingencies - $50,000)

(118) SR 0022, SR 0022 SH over SR 3041 and McMichael Road, Robinson Township, Bridge Rehabilitation

353,000

(Base Construction Allocation - $263,000)

(Land Allocation - $40,000)

(Design and Contingencies - $50,000)

(119) SR 0028, SR 0028 SH over LR 02244 and Guys Run Road, Harmar Township, Bridge Rehabilitation

252,000

(Base Construction Allocation - $162,000)

(Land Allocation - $40,000)

(Design and Contingencies - $50,000)

(120) SR 0028, SR 0028 SH over LR 02244 and Guys Run Road, Harmar Township, Bridge Rehabilitation

252,000

(Base Construction Allocation - $162,000)

(Land Allocation - $40,000)

(Design and Contingencies - $50,000)

(121) SR 0028, SR 0028 SH over Deer Creek, Harmar Township, Bridge Rehabilitation

321,000

(Base Construction Allocation - $231,000)

(Land Allocation - $40,000)

(Design and Contingencies - $50,000)

(122) SR 0028, SR 0028 SH over Deer Creek, Harmar Township, Bridge Rehabilitation

288,000

(Base Construction Allocation - $198,000)

(Land Allocation - $40,000)

(Design and Contingencies - $50,000)

(123) SR 0028, SR 0028 SH over LR 679 and TR 910, Harmar Township, Bridge Rehabilitation

304,000

(Base Construction Allocation - $214,000)

(Land Allocation - $40,000)

(Design and Contingencies - $50,000)

(124) SR 0048, Scenery Drive over Douglas Run, Forward Township, Bridge Rehabilitation

102,000

(Base Construction Allocation - $12,000)

(Land Allocation - $40,000)

(Design and Contingencies - $50,000)

(125) SR 0048, Boston Hollow Road over Wylie Run, Elizabeth Township, Bridge Rehabilitation

98,000

(Base Construction Allocation - $8,000)

(Land Allocation - $40,000)

(Design and Contingencies - $50,000)

(126) SR 0048, Boston Hollow Road over Wylie Run, Elizabeth Township, Bridge Rehabilitation

99,000

(Base Construction Allocation - $9,000)

(Land Allocation - $40,000)

(Design and Contingencies - $50,000)

(127) SR 0051, Island Avenue over Filled-in Spandrel Arch, Stowe Township, Bridge Replacement

207,000

(Base Construction Allocation - $117,000)

(Land Allocation - $40,000)

(Design and Contingencies - $50,000)

(128) SR 0051, Coraopolis Boulevard over TR 142 and Montour Run, Robinson Township, Bridge Replacement

1,240,000

(Base Construction Allocation - $1,150,000)

(Land Allocation - $40,000)

(Design and Contingencies - $50,000)

(129) SR 0051, 4th Street over McMabe Run, Coraopolis Borough, Bridge Rehabilitation

106,000

(Base Construction Allocation - $16,000)

(Land Allocation - $40,000)

(Design and Contingencies - $50,000)

(130) SR 0051, Stoops Ferry Road over Flaugherty Run, Moon Township, Bridge Replacement

315,000

(Base Construction Allocation - $225,000)

(Land Allocation - $40,000)

(Design and Contingencies - $50,000)

(131) SR 0060, Steubenville Pike over Branch of Chartiers Creek, Robinson Township, Bridge Rehabilitation

141,000

(Base Construction Allocation - $51,000)

(Land Allocation - $40,000)

(Design and Contingencies - $50,000)

(132) SR 0060, Steubenville Pike over Branch of Chartiers Creek, Robinson Township, Bridge Rehabilitation

99,000

(Base Construction Allocation - $9,000)

(Land Allocation - $40,000)

(Design and Contingencies - $50,000)

(133) SR 0065, Ohio River Boulevard over Toms Run, Kilbuck Township, Bridge Replacement

204,000

(Base Construction Allocation - $114,000)

(Land Allocation - $40,000)

(Design and Contingencies - $50,000)

(134) SR 0130, Allegheny River Boulevard over Abandoned Railroad, Penn Hills Township, Bridge Replacement

336,000

(Base Construction Allocation - $246,000)

(Land Allocation - $40,000)

(Design and Contingencies - $50,000)

(135) SR 0130, Allegheny River Boulevard over Abandoned Railroad, City of Pittsburgh, Bridge Replacement

358,000

(Base Construction Allocation - $268,000)

(Land Allocation - $40,000)

(Design and Contingencies - $50,000)

(136) SR 0130, Beulah Road over Chalfont Run, Penn Hills Township, Bridge Replacement

126,000

(Base Construction Allocation - $36,000)

(Land Allocation - $40,000)

(Design and Contingencies - $50,000)

(137) SR 0130, Broadway Boulevard over Branch of Turtle Creek, Mt. Oliver Borough, Bridge Rehabilitation

103,000

(Base Construction Allocation - $13,000)

(Land Allocation - $40,000)

(Design and Contingencies - $50,000)

(138) SR 0136, Monongahela Road over Beckets Run, Forward Township, Bridge Rehabilitation

111,000

(Base Construction Allocation - $21,000)

(Land Allocation - $40,000)

(Design and Contingencies - $50,000)

(139) SR 0279, Penn Lincoln Parkway over Whiskey Run and Bell Road, Scott Township, Bridge Rehabilitation

639,000

(Base Construction Allocation - $594,000)

(Land Allocation - $20,000)

(Design and Contingencies - $25,000)

(140) SR 0279, Parkway West over Branch of Whiskey Run, Green Tree Borough, Bridge Replacement

91,000

(Base Construction Allocation - $46,000)

(Land Allocation - $20,000)

(Design and Contingencies - $25,000)

(141) SR 0279, I-279 Southbound over SR 4003, SR 4009 and Ramp J, City of Pittsburgh, Bridge Rehabilitation

553,000

(Base Construction Allocation - $508,000)

(Land Allocation - $20,000)

(Design and Contingencies - $25,000)

(142) SR 0376, Parkway East over LR 763 Ramp B, City of Pittsburgh, Bridge Rehabilitation

242,000

(Base Construction Allocation - $197,000)

(Land Allocation - $20,000)

(Design and Contingencies - $25,000)

(143) SR 0376, Parkway East over LR 187, Ramp A, Westbound, Churchill Borough, Bridge Rehabilitation

135,000

(Base Construction Allocation - $90,000)

(Land Allocation - $20,000)

(Design and Contingencies - $25,000)

(144) SR 0400, Saltsburgh Road over Plum Creek, Plum Borough, Bridge Rehabilitation

112,000

(Base Construction Allocation - $22,000)

(Land Allocation - $40,000)

(Design and Contingencies - $50,000)

(145) SR 0791, Rodi Road over Branch of Chalfant Run, Penn Hills Township, Bridge Rehabilitation

97,000

(Base Construction Allocation - $7,000)

(Land Allocation - $40,000)

(Design and Contingencies - $50,000)

(146) SR 0791, Rodi Road over Branch of Chalfant Run, Penn Hills Township, Bridge Rehabilitation

97,000

(Base Construction Allocation - $7,000)

(Land Allocation - $40,000)

(Design and Contingencies - $50,000)

(147) SR 0837, Eighth Avenue over Homestead Run, Munhall Borough, Bridge Rehabilitation

114,000

(Base Construction Allocation - $24,000)

(Land Allocation - $40,000)

(Design and Contingencies - $50,000)

(148) SR 0910, Bayne Wexford Run, Pine Township, Bridge Rehabilitation

99,000

(Base Construction Allocation - $9,000)

(Land Allocation - $40,000)

(Design and Contingencies - $50,000)

(149) SR 0910, Salem Hollow Road over North Fork Pine Creek, Pine Township, Bridge Replacement

162,000

(Base Construction Allocation - $72,000)

(Land Allocation - $40,000)

Design and Contingencies - $50,000)

(150) SR 0910, Gibsonia Road over Branch of Deer Creek, West Deer Township, Bridge Rehabilitation

108,000

(Base Construction Allocation - $18,000)

(Land Allocation - $40,000)

(Design and Contingencies - $50,000)

(151) SR 0978, Miller's Run Road over Fishing Run, South Fayette Township, Bridge Replacement

130,000

(Base Construction Allocation - $40,000)

(Land Allocation - $40,000)

(Design and Contingencies - $50,000)

(152) SR 0978, Battle Ridge Road over Dolphin Run, McDonald Borough, Bridge Rehabilitation

113,000

(Base Construction Allocation - $23,000)

(Land Allocation - $40,000)

(Design and Contingencies - $50,000)

(153) SR 1001, Freeport Road over Squaw Run, O'Hara Township, Bridge Rehabilitation

128,000

(Base Construction Allocation - $38,000)

(Land Allocation - $40,000)

(Design and Contingencies - $50,000)

(154) SR 1001, Freeport Road over Barge Basin, Harmar Township, Bridge Replacement

429,000

(Base Construction Allocation - $339,000)

(Land Allocation - $40,000)

(Design and Contingencies - $50,000)

(155) SR 1001, Freeport Road over Riddle Run, Springdale Township, Bridge Rehabilitation

100,000

(Base Construction Allocation - $10,000)

(Land Allocation - $40,000)

(Design and Contingencies - $50,000)

(156) SR 1002, SR 0028 SH over Tributary of Allegheny River, O'Hara Township, Bridge Replacement

110,000

(Base Construction Allocation - $20,000)

(Land Allocation - $40,000)

(Design and Contingencies - $50,000)

(157) SR 1006, Saxonburg Boulevard over Branch of Little Pine Creek, Indiana Township, Bridge Rehabilitation

106,000

(Base Construction Allocation - $16,000)

(Land Allocation - $40,000)

(Design and Contingencies - $50,000)

(158) SR 1011, Guys Run Road over Guys Run, Harmar Township, Bridge Replacement

171,000

(Base Construction Allocation - $81,000)

(Land Allocation - $40,000)

(Design and Contingencies - $50,000)

(159) SR 1011, Guys Run Road over Guys Run, Harmar Township, Bridge Replacement

131,000

(Base Construction Allocation - $41,000)

(Land Allocation - $40,000)

(Design and Contingencies - $50,000)

(160) SR 1013, Saxonburg Boulevard over Little Pine Creek, Shaler Township, Bridge Replacement

175,000

(Base Construction Allocation - $85,000)

(Land Allocation - $40,000)

(Design and Contingencies - $50,000)

(161) SR 1013, Saxonburg Boulevard over Little Pine Creek, O'Hara Township, Bridge Replacement

155,000

(Base Construction Allocation - $65,000)

(Land Allocation - $40,000)

(Design and Contingencies - $50,000)

(162) SR 1013, Saxonburg Boulevard over Branch of Little Pine Creek, O'Hara Township, Bridge Replacement

120,000

(Base Construction Allocation - $30,000)

(Land Allocation - $40,000)

(Design and Contingencies - $50,000)

(163) SR 1014, Hite Road over Allegheny Valley Express, Harmar Township, Bridge Replacement

1,749,000

(Base Construction Allocation - $1,659,000)

(Land Allocation - $40,000)

(Design and Contingencies - $50,000)

(164) SR 1016, Cove Run Road over Deer Creek, Indiana Township, Bridge Rehabilitation

219,000

(Base Construction Allocation - $129,000)

(Land Allocation - $40,000)

(Design and Contingencies - $50,000)

(165) SR 1018, Alpha Drive over SR 0028 SH, O'Hara Township, Bridge Replacement

1,150,000

(Base Construction Allocation - $1,060,000)

(Land Allocation - $40,000)

(Design and Contingencies - $50,000)

(166) SR 1019, Butler Logan Road over Allegheny Valley Expressway, Frazer Township, Bridge Rehabilitation

522,000

(Base Construction Allocation - $432,000)

(Land Allocation - $40,000)

(Design and Contingencies - $50,000)

(167) SR 1019, Days Run Road over Days Run, East Deer Township, Bridge Rehabilitation

112,000

(Base Construction Allocation - $22,000)

(Land Allocation - $40,000)

(Design and Contingencies - $50,000)

(168) SR 1022, Oak Road over Dawson Run, West Deer Township, Bridge Replacement

162,000

(Base Construction Allocation - $72,000)

(Land Allocation - $40,000)

(Design and Contingencies - $50,000)

(169) SR 1028, Bakerstown Road over Branch of Deer Creek, Richland Township, Bridge Replacement

114,000

(Base Construction Allocation - $24,000)

(Land Allocation - $40,000)

(Design and Contingencies - $50,000)

(170) SR 1028, Bakerstown Road over Bull Creek, Fawn Township, Bridge Replacement

224,000

(Base Construction Allocation - $134,000)

(Land Allocation - $40,000)

(Design and Contingencies - $50,000)

(171) SR 1028, Bakerstown Road over Little Bull Creek, Fawn Township, Bridge Replacement

108,000

(Base Construction Allocation - $18,000)

(Land Allocation - $40,000)

(Design and Contingencies - $50,000)

(172) SR 1031, Lardington Road over Bull Creek, Fawn Township, Bridge Rehabilitation

138,000

(Base Construction Allocation - $48,000)

(Land Allocation - $40,000)

(Design and Contingencies - $50,000)

(173) SR 1031, Lardington Road over Lardington Run, Fawn Township, Bridge Rehabilitation

115,000

(Base Construction Allocation - $25,000)

(Land Allocation - $40,000)

(Design and Contingencies - $50,000)

(174) SR 1034, Bull Creek Road over Branch of Bull Creek, Fawn Township, Bridge Replacement

112,000

(Base Construction Allocation - $22,000)

(Land Allocation - $40,000)

(Design and Contingencies - $50,000)

(175) SR 1034, Bull Creek Road over Branch of Bull Creek, Fawn Township, Bridge Replacement

294,000

(Base Construction Allocation - $204,000)

(Land Allocation - $40,000)

(Design and Contingencies - $50,000)

(176) SR 1037, Saxonburg Road over Branch of Little Bull Creek, Harrison Township, Bridge Rehabilitation

99,000

(Base Construction Allocation - $9,000)

(Land Allocation - $40,000)

(Design and Contingencies - $50,000)

(177) SR 2013, Elizabeth Road over Branch of Beckets Run, Forward Township, Bridge Replacement

116,000

(Base Construction Allocation - $26,000)

(Land Allocation - $40,000)

(Design and Contingencies - $50,000)

(178) SR 2017, Buena Vista Road over Wildcat Run, Elizabeth Township, Bridge Replacement

196,000

(Base Construction Allocation - $106,000)

(Land Allocation - $40,000)

(Design and Contingencies - $50,000)

(179) SR 2018, West Smithfield Road over Unnamed Creek, Elizabeth Borough, Bridge Rehabilitation

105,000

(Base Construction Allocation - $15,000)

(Land Allocation - $40,000)

(Design and Contingencies - $50,000)

(180) SR 2031, Lincoln Way over Long Run, White Oak Borough, Bridge Rehabilitation

142,000

(Base Construction Allocation - $52,000)

(Land Allocation - $40,000)

(Design and Contingencies - $50,000)

(181) SR 2058, Verona Road over Branch of Sandy Creek, Penn Hills Township, Bridge Rehabilitation

99,000

(Base Construction Allocation - $9,000)

(Land Allocation - $40,000)

(Design and Contingencies - $50,000)

(182) SR 2058, Verona Road over Sandy Creek, Penn Hills Township, Bridge Replacement

125,000

(Base Construction Allocation - $35,000)

(Land Allocation - $40,000)

(Design and Contingencies - $50,000)

(183) SR 2058, Hulton Road over Plum Creek, Penn Hills Township, Bridge Replacement

245,000

(Base Construction Allocation - $155,000)

(Land Allocation - $40,000)

(Design and Contingencies - $50,000)

(184) SR 2058, Hulton Road over Branch of Plum Creek, Plum Borough, Bridge Rehabilitation

102,000

(Base Construction Allocation - $12,000)

(Land Allocation - $40,000)

(Design and Contingencies - $50,000)

(185) SR 2059, Long Road over Chalfant Run, Penn Hills Township, Bridge Replacement

119,000

(Base Construction Allocation - $29,000)

(Land Allocation - $40,000)

(Design and Contingencies - $50,000)

(186) SR 2064, Lime Hollow Road over Lime Hollow Run, Penn Hills Township, Bridge Rehabilitation

103,000

(Base Construction Allocation - $13,000)

(Land Allocation - $40,000)

(Design and Contingencies - $50,000)

(187) SR 2070, Indiana Drive over Small Stream, Penn Hills Township, Bridge Rehabilitation

97,000

(Base Construction Allocation - $7,000)

(Land Allocation - $40,000)

(Design and Contingencies - $50,000)

(188) SR 2075, New Texas Road over Branch of Little Plum Creek, Plum Borough, Bridge Rehabilitation

100,000

(Base Construction Allocation - $10,000)

(Land Allocation - $40,000)

(Design and Contingencies - $50,000)

(189) SR 2076, Old Leechburg Road over Little Plum Creek, Plum Borough, Bridge Replacement

134,000

(Base Construction Allocation - $44,000)

(Land Allocation - $40,000)

(Design and Contingencies - $50,000)

(190) SR 2112, Electric Avenue over Falls Run, East Pittsburgh Borough, Bridge Replacement

128,000

(Base Construction Allocation - $38,000)

(Land Allocation - $40,000)

(Design and Contingencies - $50,000)

(191) SR 3001, Miller's Run Road over Branch of Miller's Run, South Fayette Township, Bridge Replacement

113,000

(Base Construction Allocation - $23,000)

(Land Allocation - $40,000)

(Design and Contingencies - $50,000)

(192) SR 3002, Country Club Drive over SR 0019, Upper St. Clair Township, Bridge Rehabilitation

160,000

(Base Construction Allocation - $70,000)

(Land Allocation - $40,000)

(Design and Contingencies - $50,000)

(193) SR 3005, Mayview Road over Branch of Chartiers Creek, Upper St. Clair Township, Bridge Rehabilitation

98,000

(Base Construction Allocation - $8,000)

(Land Allocation - $40,000)

(Design and Contingencies - $50,000)

(194) SR 3021, Walton Road over Lobbs Run, Jefferson Hills Borough, Bridge Replacement

161,000

(Base Construction Allocation - $71,000)

(Land Allocation - $40,000)

(Design and Contingencies - $50,000)

(195) SR 3028, Preston Sygan Road over Thoms Run, South Fayette Township, Bridge Rehabilitation

112,000

(Base Construction Allocation - $22,000)

(Land Allocation - $40,000)

(Design and Contingencies - $50,000)

(196) SR 3031, Presley Road over Chartiers Creek, Collier Township, Bridge Rehabilitation

262,000

(Base Construction Allocation - $172,000)

(Land Allocation - $40,000)

(Design and Contingencies - $50,000)

(197) SR 3057, Donaldson Road over Fork Robinson Run, North Fayette Township, Bridge Rehabilitation

99,000

(Base Construction Allocation - $9,000)

(Land Allocation - $40,000)

(Design and Contingencies - $50,000)

(198) SR 3071, Potato Garden Road over Branch of Potato Garden Run, Findlay Township, Bridge Rehabilitation

98,000

(Base Construction Allocation - $8,000)

(Land Allocation - $40,000)

(Design and Contingencies - $50,000)

(199) SR 3072, Beaver Grade Road over Montour Trailway and Montour Railroad, Moon Township, Bridge Rehabilitation

254,000

(Base Construction Allocation - $164,000)

(Land Allocation - $40,000)

(Design and Contingencies - $50,000)

(200) SR 3077, Brodhead Road over Flaugherty Run, Moon Township, Bridge Rehabilitation

128,000

(Base Construction Allocation - $38,000)

(Land Allocation - $40,000)

(Design and Contingencies - $50,000)

(201) SR 3077, Brodhead Road over Boggs Run, Moon Township, Bridge Rehabilitation

117,000

(Base Construction Allocation - $27,000)

(Land Allocation - $40,000)

(Design and Contingencies - $50,000)

(202) SR 3082, Murdocksville Road over Branch of Raccoon Creek, Findlay Township, Bridge Rehabilitation

102,000

(Base Construction Allocation - $12,000)

(Land Allocation - $40,000)

(Design and Contingencies - $50,000)

(203) SR 3084, Spring Run Road over LR 1023 and TR 60, Findlay Township, Bridge Rehabilitation

398,000

(Base Construction Allocation - $308,000)

(Land Allocation - $40,000)

(Design and Contingencies - $50,000)

(204) SR 3108, North Branch Road over Branch of North Branch Robinson Run, North Fayette Township, Bridge Replacement

127,000

(Base Construction Allocation - $37,000)

(Land Allocation - $40,000)

(Design and Contingencies - $50,000)

(205) SR 3111, Sugar Grove Road over Shouse Run, Crescent Township, Bridge Rehabilitation

99,000

(Base Construction Allocation - $9,000)

(Land Allocation - $40,000)

(Design and Contingencies - $50,000)

(206) SR 3144, Robinson Township, C Boulevard over Airport Parkway, North Fayette Township, Bridge Rehabilitation

435,000

(Base Construction Allocation - $345,000)

(Land Allocation - $40,000)

(Design and Contingencies - $50,000)

(207) SR 4003, McKnight Road over Pine Creek, McCandless Township, Bridge Rehabilitation

205,000

(Base Construction Allocation - $115,000)

(Land Allocation - $40,000)

(Design and Contingencies - $50,000)

(208) SR 4009, Evergreen Road over Girtys Run, Millvale Borough, Bridge Rehabilitation

138,000

(Base Construction Allocation - $48,000)

(Land Allocation - $40,000)

(Design and Contingencies - $50,000)

(209) SR 4028, Red Gate over Hays Run, Haysville Borough, Bridge Replacement

104,000

(Base Construction Allocation - $14,000)

(Land Allocation - $40,000)

(Design and Contingencies - $50,000)

(210) SR 4032, Fern Hollow Road over Branch of Little Sewickley Creek, Sewickley Heights Borough, Bridge Rehabilitation

99,000

(Base Construction Allocation - $9,000)

(Land Allocation - $40,000)

(Design and Contingencies - $50,000)

(211) SR 4036, Big Sewickley Creek Road over Branch of Big Sewickley Creek, Bell Acres Borough, Bridge Replacement

140,000

(Base Construction Allocation - $50,000)

(Land Allocation - $40,000)

(Design and Contingencies - $50,000)

(212) SR 4036, Big Sewickley Creek Road over Branch of Big Sewickley Creek, Braddock Hills Borough, Bridge Replacement

121,000

(Base Construction Allocation - $31,000)

(Land Allocation - $40,000)

(Design and Contingencies - $50,000)

(213) SR 4036, Big Sewickley Creek Road over Branch of Big Sewickley Creek, Bell Acres Borough, Bridge Rehabilitation

105,000

(Base Construction Allocation - $15,000)

(Land Allocation - $40,000)

(Design and Contingencies - $50,000)

(214) SR 4036, Big Sewickley Creek Road over Big Sewickley Creek, Braddock Hills Borough, Bridge Replacement

228,000

(Base Construction Allocation - $138,000)

(Land Allocation - $40,000)

(Design and Contingencies - $50,000)

(215) SR 4036, Big Sewickley Creek over Branch of Big Sewickley Creek, Braddock Hills Borough, Bridge Replacement

136,000

(Base Construction Allocation - $46,000)

(Land Allocation - $40,000)

(Design and Contingencies - $50,000)

(216) SR 4039, Lower Sewickley Creek Road over Little Sewickley Creek, Sewickley Hills Borough, Bridge Replacement

121,000

(Base Construction Allocation - $31,000)

(Land Allocation - $40,000)

(Design and Contingencies - $50,000)

(217) SR 4043, Camp Meeting Road over Branch of Rippling Run, Franklin Park Borough, Bridge Replacement

137,000

(Base Construction Allocation - $47,000)

(Land Allocation - $40,000)

(Design and Contingencies - $50,000)

(218) SR 4043, Camp Meeting Road over Rippling Run, Franklin Park Borough, Bridge Replacement

126,000

(Base Construction Allocation - $36,000)

(Land Allocation - $40,000)

(Design and Contingencies - $50,000)

(219) SR 4050, Shenot Road over Branch of Brush Creek, Marshall Township, Bridge Rehabilitation

99,000

(Base Construction Allocation - $9,000)

(Land Allocation - $40,000)

(Design and Contingencies - $50,000)

(220) SR 4053, Wexford Run Road over Branch of Brush Creek, Marshall Township, Bridge Rehabilitation

97,000

(Base Construction Allocation - $7,000)

(Land Allocation - $40,000)

(Design and Contingencies - $50,000)

(221) SR 4059, SH over Branch of Breakneck Creek, Pine Township, Bridge Rehabilitation

103,000

(Base Construction Allocation - $13,000)

(Land Allocation - $40,000)

(Design and Contingencies - $50,000)

(222) SR 4064, Peebles Road over Little Pine Creek, McCandless Township, Bridge Replacement

155,000

(Base Construction Allocation - $65,000)

(Land Allocation - $40,000)

(Design and Contingencies - $50,000)

(223) SR 4070, Wildwood Road over CSX Railroad, Unnamed Creek, Private Road, Hampton Township, Bridge Rehabilitation

571,000

(Base Construction Allocation - $481,000)

(Land Allocation - $40,000)

(Design and Contingencies - $50,000)

(224) SR 4153, Township Road over Little Pine Creek, Shaler Township, Bridge Rehabilitation

108,000

(Base Construction Allocation - $18,000)

(Land Allocation - $40,000)

(Design and Contingencies - $50,000)

(225) SR 6579, LR 1026, HOV Station 25+45 over CSX Railroad, City of Pittsburgh, Bridge Rehabilitation

1,634,000

(Base Construction Allocation - $1,544,000)

(Land Allocation - $40,000)

(Design and Contingencies - $50,000)

(226) SR 8057, Ramp A Road over 736 Extension Southbound TR 837, City of Duquesne, Bridge Rehabilitation

438,000

(Base Construction Allocation - $348,000)

(Land Allocation - $40,000)

(Design and Contingencies - $50,000)

(227) SR 8080, Mall Entrance and Exit over LR 187 and US 22 Business, Monroeville Borough, Bridge Rehabilitation

246,000

(Base Construction Allocation - $156,000)

(Land Allocation - $40,000)

(Design and Contingencies - $50,000)

(228) SR 8086, Ramp H Road over Local Street, City of McKeesport, Bridge Rehabilitation

140,000

(Base Construction Allocation - $50,000)

(Land Allocation - $40,000)

(Design and Contingencies - $50,000)

(229) SR 8094, Ramp BU Road over Mon Wharf, City of Pittsburgh, Bridge Rehabilitation

293,000

(Base Construction Allocation - $203,000)

(Land Allocation - $40,000)

(Design and Contingencies - $50,000)

(230) SR 8095, Ramp F Road over C&D, Ft. Pitt Boulevard, City of Pittsburgh, Bridge Rehabilitation

495,000

(Base Construction Allocation - $405,000)

(Land Allocation - $40,000)

(Design and Contingencies - $50,000)

(231) SR 0279 and I-79, Various Townships, Bridge Rehabilitation and Paint

1,600,000

(Base Construction Allocation - $1,600,000)

(232) SR 2048, Bridge over Thompson to SR 0048 (0050/1252 to 0110/0000), Elizabeth Township, Bridge Restoration

800,000

(Base Construction Allocation - $800,000)

(233) SR 7219, Corrigan Catfish CT03, South Park Township, Bridge Restoration

150,000

(Base Construction Allocation - $150,000)

(234) SR 0400, Baum Boulevard over CSX Railroad, City of Pittsburgh, Bridge Rehabilitation

165,000

(Base Construction Allocation - $150,000)

(Design and Contingencies - $15,000)

(235) SR 0030, Westinghouse Bridge over Turtle Creek, N&S Railroad, Bridge Preservation

276,000

(Base Construction Allocation - $240,000)

(Design and Contingencies - $36,000)

(236) SR 0376, Pedestrian Bridge Paint, Parkway East near Bates Street, Interstate Maintenance

42,000

(Base Construction Allocation - $40,000)

(Design and Contingencies - $2,000)

(237) Various SRs, Bridge Expansion, Dam Replacements, Bridge Rehabilitation

201,000

(Base Construction Allocation - $200,000)

(Design and Contingencies - $1,000)

(238) Bridge No.6 Expansion and Replacement, Interstate Maintenance

200,000

(Base Construction Allocation - $200,000)

(239) SR 0050 over Pittsburgh & Ohio Railway, Scottsville, Bridge Replacement

419,000

(Base Construction Allocation - $262,000)

(Land Allocation - $78,000)

(Design and Contingencies - $78,000)

(240) SR 0910 over Deer Creek, Seg.0300, West Deer Township, Bridge Replacement

110,000

(Base Construction Allocation - $69,000)

(Land Allocation - $21,000)

(Design and Contingencies - $21,000)

(241) SR 0910 over Deer Creek, Seg.0280, West Deer Township, Bridge Replacement

74,000

(Base Construction Allocation - $46,000)

(Land Allocation - $14,000)

(Design and Contingencies - $14,000)

(242) SR 0910 over Deer Creek, Seg.0270, West Deer Township, Bridge Replacement

78,000

(Base Construction Allocation - $49,000)

(Land Allocation - $15,000)

(Design and Contingencies - $15,000)

(243) SR 1013 over Little Pine Creek, Seg.0030, O'Hara Township, Bridge Replacement

52,000

(Base Construction Allocation - $33,000)

(Land Allocation - $10,000)

(Design and Contingencies - $10,000)

(244) SR 1013 over Little Pine Creek, Seg.0020, Shaler Township, Bridge Replacement

68,000

(Base Construction Allocation - $43,000)

(Land Allocation - $13,000)

(Design and Contingencies - $13,000)

(245) SR 1019 over Days Run, Seg.0220, Offset 2389, East Deer Township, Bridge Replacement

49,000

(Base Construction Allocation - $31,000)

(Land Allocation - $9,000)

(Design and Contingencies - $9,000)

(246) SR 1019 over Days Run, Seg.0220, Offset 1167, East Deer Township, Bridge Replacement

54,000

(Base Construction Allocation - $34,000)

(Land Allocation - $10,000)

(Design and Contingencies - $10,000)

(247) SR 1019 over Days Run, Seg.0220, Offset 0000, East Deer Township, Bridge Replacement

53,000

(Base Construction Allocation - $33,000)

(Land Allocation - $10,000)

(Design and Contingencies - $10,000)

(248) SR 1020 over Cunningham Run, West Deer Township, Bridge Replacement

56,000

(Base Construction Allocation - $36,000)

(Land Allocation - $10,000)

(Design and Contingencies - $10,000)

(249) SR 1027 over Little Bull Creek, Harrison Township, Bridge Replacement

96,000

(Base Construction Allocation - $60,000)

(Land Allocation - $18,000)

(Design and Contingencies - $18,000)

(250) SR 1031 over Lardington Run, Fawn Township, Bridge Replacement

65,000

(Base Construction Allocation - $41,000)

(Land Allocation - $12,000)

(Design and Contingencies - $12,000)

(251) SR 2031 over Branch of Long Run, White Oak Borough, Bridge Replacement

202,000

(Base Construction Allocation - $126,000)

(Land Allocation - $38,000)

(Design and Contingencies - $38,000)

(252) SR 2046 over Streets Run, Seg.0080, Baldwin, Bridge Replacement

123,000

(Base Construction Allocation - $77,000)

(Land Allocation - $23,000)

(Design and Contingencies - $23,000)

(253) SR 2046 over Streets Run, Seg.0040, Baldwin, Bridge Replacement

55,000

(Base Construction Allocation - $35,000)

(Land Allocation - $10,000)

(Design and Contingencies - $10,000)

(254) SR 3004 over McLaughlin Run, Bridgeville Borough, Bridge Replacement

109,000

(Base Construction Allocation - $69,000)

(Land Allocation - $20,000)

(Design and Contingencies - $20,000)

(255) SR 3015 over Peters Creek, Jefferson Hills Borough, Bridge Replacement

127,000

(Base Construction Allocation - $79,000)

(Land Allocation - $24,000)

(Design and Contingencies - $24,000)

(256) SR 3070 over Montour Run, Seg.0070, Findlay Township, Bridge Replacement

45,000

(Base Construction Allocation - $29,000)

(Land Allocation - $8,000)

(Design and Contingencies - $8,000)

(257) SR 3070 over Montour Run, Seg.0064, North Fayette Township, Bridge Replacement

80,000

(Base Construction Allocation - $50,000)

(Land Allocation - $15,000)

(Design and Contingencies - $15,000)

(258) SR 4070 over Montour Run, Hampton Township, Bridge Replacement

102,000

(Base Construction Allocation - $64,000)

(Land Allocation - $19,000)

(Design and Contingencies - $19,000)

(259) SR 0019 over Pine Creek, Bridge Replacement

3,200,000

(Base Construction Allocation - $2,700,000)

(Land Allocation - $50,000)

(Design and Contingencies - $450,000)