Act 103 of 2006, § 69, under HIGHWAY-RAILROAD AND HIGHWAY BRIDGE CAPITAL BUDGET SUPPLEMENTAL ACT FOR 2005-2006.

Act 103 of 2006, § 69

Section 69. Westmoreland County.

(a) Local Bridges

(1) Fairfield Township, T-482, Hirsch Road over Tubmill Creek, Bridge Replacement

325,000

(Base Construction Allocation - $325,000)

(2) Fairfield Township, T-466, Cove Hollow Road over Small Creek, Bridge Replacement

100,000

(Base Construction Allocation - $100,000)

(3) Fairfield Township, T-735, Turkey Inn Road over Small Creek, Bridge Replacement

150,000

(Base Construction Allocation - $150,000)

(4) Fairfield Township, T-990, Patterson Road over Small Creek, Bridge Replacement

175,000

(Base Construction Allocation - $175,000)

(5) Fairfield Township, T-740, Berkeys Road over Small Creek, Bridge Replacement

75,000

(Base Construction Allocation - $75,000)

(6) Loyalhanna Township, T-939, Tunnelton Road over Conemaugh River, Bridge Replacement

800,000

(Base Construction Allocation - $680,000)

(Land Allocation - $20,000)

(Design and Contingencies - $100,000)

(7) Loyalhanna Township, T-852, Maple Lodge Road over Small Creek, Bridge Replacement

600,000

(Base Construction Allocation - $490,000)

(Land Allocation - $10,000)

(Design and Contingencies - $100,000)

(8) Murrysville Borough, Hills Church Road over Small Tributary of Haymaker Run, Bridge Replacement

200,000

(Base Construction Allocation - $200,000)

(9) Murrysville Borough, Manont Road over Tributary of Haymaker Run, Bridge Replacement

200,000

(Base Construction Allocation - $200,000)

(10) Murrysville Borough, Haymaker Farm Road over Steels Run, Bridge Replacement

600,000

(Base Construction Allocation - $600,000)

(11) Salem Township, T-921, Pump Station Road over Beaver Run, Bridge Rehabilitation

159,000

(Base Construction Allocation - $125,000)

(Land Allocation - $2,000)

(Design and Contingencies - $32,000)

(12) Salem Township, T-616, Maplewood Drive over Beaver Run, Bridge Rehabilitation

101,000

(Base Construction Allocation - $79,000)

(Land Allocation - $2,000)

(Design and Contingencies - $20,000)

(13) Salem Township, T-612, Rock Springs Road over Beaver Run, Bridge Rehabilitation

65,000

(Base Construction Allocation - $50,000)

(Land Allocation - $2,000)

(Design and Contingencies - $13,000)

(14) Salem Township, T-728, Hoffman Heights Road over Porter Run, Bridge Rehabilitation

78,000

(Base Construction Allocation - $61,000)

(Land Allocation - $2,000)

(Design and Contingencies - $15,000)

(15) St. Clair Township, T-994 over Small Creek, Bridge Replacement

600,000

(Base Construction Allocation - $490,000)

(Land Allocation - $10,000)

(Design and Contingencies - $100,000)

(16) T-654, Finnin Road Bridge, Allegheny Township, Bridge Replacement

612,000

(Base Construction Allocation - $400,000)

(Land Allocation - $52,000)

(Design and Contingencies - $160,000)

(b) State Bridges

(1) SR 4028, Kemerer Hollow Road over Steel's Run, Murrysville Borough, Bridge Replacement

400,000

(Base Construction Allocation - $400,000)

(2) SR 4041, School Road over Turtle Creek, Murrysville, Bridge Replacement

600,000

(Base Construction Allocation - $600,000)

(3) SR 1050, T-910, Loyalhanna Dam Road over Loyalhanna Creek, Loyalhanna Township, Bridge Rehabilitation

1,000,000

(Base Construction Allocation - $850,000)

(Land Allocation - $20,000)

(Design and Contingencies - $130,000)

(4) SR 1006, Creekroad Bridge No.3 over Small Creek, Fairfield Township, Bridge Replacement

1,000,000

(Base Construction Allocation - $1,000,000)

(5) SR 1006, Creekroad Bridge No.1 over Small Creek, Fairfield Township, Bridge Replacement

1,000,000

(Base Construction Allocation - $1,000,000)

(6) SR 0156 Bridge over Kiskiminetas River, Avonmore Borough, Bridge Rehabilitation

600,000

(Base Construction Allocation - $490,000)

(Land Allocation - $10,000)

(Design and Contingencies - $100,000)

(7) SR 1006 over Tubmill Creek, Fairfield Township, Bridge Replacement

1,670,000

(Base Construction Allocation - $1,400,000)

(Land Allocation - $20,000)

(Design and Contingencies - $250,000)

(8) SR 1006, Creekroad No.2 over Unnamed Creek, Fairfield Township, Bridge Replacement

100,000

(Base Construction Allocation - $100,000)

(9) SR 0366, Little Pucketa Creek, City of New Kensington, Bridge Replacement

530,000

(Base Construction Allocation - $400,000)

(Land Allocation - $10,000)

(Design and Contingencies - $120,000)

(10) SR 0906, Webster Hollow Run, Rostraver Township, Bridge Replacement

875,000

(Base Construction Allocation - $500,000)

(Land Allocation - $25,000)

(Design and Contingencies - $350,000)

(11) SR 0982, Loyalhanna Creek, Derry Township, Bridge Replacement

1,315,000

(Base Construction Allocation - $900,000)

(Land Allocation - $35,000)

(Design and Contingencies - $380,000)

(12) SR 1017, Branch of Hannas Run, Ligonier Township, Bridge Replacement

175,000

(Base Construction Allocation - $100,000)

(Land Allocation - $5,000)

(Design and Contingencies - $70,000)

(13) SR 1018, Branch of Loyalhanna Creek, Derry Township, Bridge Replacement

00,000,000

(Base Construction Allocation - $)

(Land Allocation - $)

(Design and Contingencies - $)

(14) SR 1021, Coalpit Run, Ligonier Township, Bridge Replacement

195,000

(Base Construction Allocation - $120,000)

(Land Allocation - $5,000)

(Design and Contingencies - $70,000)

(15) SR 1023, Furnace Run, Ligonier Township, Bridge Replacement

155,000

(Base Construction Allocation - $80,000)

(Land Allocation - $5,000)

(Design and Contingencies - $70,000)

(16) SR 1055, Branch of Whitethorn Creek, Salem Township, Bridge Replacement

875,000

(Base Construction Allocation - $500,000)

(Land Allocation - $25,000)

(Design and Contingencies - $350,000)

(17) SR 2009, Township Line Run, Salem Township, Bridge Replacement

195,000

(Base Construction Allocation - $120,000)

(Land Allocation - $5,000)

(Design and Contingencies - $70,000)

(18) SR 0217, Derry Borough Bridge, Derry Township, Bridge Replacement

2,220,000

(Base Construction Allocation - $2,000,000)

(Land Allocation - $20,000)

(Design and Contingencies - $200,000)

(19) SR 2043, Two Mile Run, Ligonier Township, Bridge Replacement

195,000

(Base Construction Allocation - $120,000)

(Land Allocation - $5,000)

(Design and Contingencies - $70,000)

(20) SR 2045, Two Mile Run, Ligonier Township, Bridge Replacement

195,000

(Base Construction Allocation - $120,000)

(Land Allocation - $5,000)

(Design and Contingencies - $70,000)

(21) SR 3012, Sewickley Creek, Sewickley and South Huntingdon Townships, Bridge Replacement

2,520,000

(Base Construction Allocation - $2,000,000)

(Land Allocation - $50,000)

(Design and Contingencies - $470,000)

(22) SR 3021, Tributary of Monongahela River, Rostraver Township, Bridge Replacement

875,000

(Base Construction Allocation - $500,000)

(Land Allocation - $25,000)

(Design and Contingencies - $350,000)

(23) SR 3023, Pollock Run, Rostraver Township, Bridge Replacement

215,000

(Base Construction Allocation - $130,000)

(Land Allocation - $5,000)

(Design and Contingencies - $80,000)

(24) SR 3023, Pollock Run, Rostraver Township, Bridge Replacement

215,000

(Base Construction Allocation - $130,000)

(Land Allocation - $5,000)

(Design and Contingencies - $80,000)

(25) SR 3035, Barren Run, South Huntingdon Township, Bridge Replacement

155,000

(Base Construction Allocation - $80,000)

(Land Allocation - $5,000)

(Design and Contingencies - $70,000)

(26) SR 3047, Possum Hollow Run, North Huntington Township, Bridge Replacement

215,000

(Base Construction Allocation - $130,000)

(Land Allocation - $5,000)

(Design and Contingencies - $80,000)

(27) SR 4003, Branch of Brush Creek, Hempfield Township, Bridge Replacement

195,000

(Base Construction Allocation - $120,000)

(Land Allocation - $5,000)

(Design and Contingencies - $70,000)

(28) SR 4022, Brush Run, Penn Township, Bridge Replacement

875,000

(Base Construction Allocation - $500,000)

(Land Allocation - $25,000)

(Design and Contingencies - $350,000)

(29) SR 4053, Turtle Creek, Municipality of Murrysville, Bridge Replacement

195,000

(Base Construction Allocation - $120,000)

(Land Allocation - $5,000)

(Design and Contingencies - $70,000)

(30) SR 4055, Haymakers Run, Municipality of Murrysville, Bridge Replacement

230,000

(Base Construction Allocation - $140,000)

(Land Allocation - $10,000)

(Design and Contingencies - $80,000)

(31) SR 4089, Branch of Chartiers Run, Allegheny Township, Bridge Replacement

875,000

(Base Construction Allocation - $500,000)

(Land Allocation - $25,000)

(Design and Contingencies - $350,000)

(32) SR 0031 over Buffalo Run, East Huntingdon Township, Bridge Replacement

875,000

(Base Construction Allocation - $500,000)

(Land Allocation - $25,000)

(Design and Contingencies - $350,000)

(33) SR 0366, Pucketa Creek, Municipality of Murrysville, Bridge Replacement

195,000

(Base Construction Allocation - $120,000)

(Land Allocation - $5,000)

(Design and Contingencies - $70,000)

(34) SR 0366, Pucketa Creek, Municipality of Murrysville, Bridge Rehabilitation

465,000

(Base Construction Allocation - $340,000)

(Land Allocation - $5,000)

(Design and Contingencies - $120,000)

(35) SR 0366 over Pucketa Creek, Washington Township, Bridge Rehabilitation

245,000

(Base Construction Allocation - $160,000)

(Land Allocation - $5,000)

(Design and Contingencies - $80,000)

(36) SR 0400 over Beaver Run, Washington and Bell Townships, Bridge Rehabilitation

365,000

(Base Construction Allocation - $260,000)

(Land Allocation - $5,000)

(Design and Contingencies - $100,000)

(37) SR 0136, Pollock Run Bridge, Rostraver Township, Bridge Replacement

195,000

(Base Construction Allocation - $120,000)

(Land Allocation - $5,000)

(Design and Contingencies - $70,000)

(38) SR 4055, Haymakers Run Bridge, Municipality of Murrysville, Bridge Replacement

1,025,000

(Base Construction Allocation - $650,000)

(Land Allocation - $25,000)

(Design and Contingencies - $350,000)

(39) SR 0993, Larimer Bridge, North Huntingdon Township, Bridge Replacement

385,000

(Base Construction Allocation - $280,000)

(Land Allocation - $5,000)

(Design and Contingencies - $100,000)

(40) SR 4018 over Turtle Creek, Trafford Borough, Bridge Replacement

345,000

(Base Construction Allocation - $240,000)

(Land Allocation - $5,000)

(Design and Contingencies - $100,000)

(41) SR 0982, Welty Run Bridge, Mount Pleasant Township, Bridge Replacement

175,000

(Base Construction Allocation - $100,000)

(Land Allocation - $5,000)

(Design and Contingencies - $70,000)

(42) SR 3071, Little Sewickley Creek, Arona Borough, Bridge Replacement

245,000

(Base Construction Allocation - $150,000)

(Land Allocation - $5,000)

(Design and Contingencies - $90,000)

(43) SR 3093 over I-70, New Stanton Borough, Bridge Replacement

780,000

(Base Construction Allocation - $600,000)

(Land Allocation - $40,000)

(Design and Contingencies - $140,000)

(44) SR 3101 over Jacks Run, South Greensburg Borough and Hempfield Township, Bridge Rehabilitation

225,000

(Base Construction Allocation - $140,000)

(Land Allocation - $5,000)

(Design and Contingencies - $80,000)

(45) SR 1014 over McGee Run, Derry Township, Bridge Rehabilitation

465,000

(Base Construction Allocation - $340,000)

(Land Allocation - $5,000)

(Design and Contingencies - $120,000)

(46) SR 3011 over I-70, Rostraver Township, Bridge Replacement

320,000

(Base Construction Allocation - $150,000)

(Land Allocation - $20,000)

(Design and Contingencies - $150,000)

(47) SR 3017 over I-70, Rostraver Township, Bridge Replacement

220,000

(Base Construction Allocation - $100,000)

(Land Allocation - $20,000)

(Design and Contingencies - $100,000)

(48) SR 3007 over I-70, North Belle Vernon Borough, Bridge Replacement

320,000

(Base Construction Allocation - $150,000)

(Land Allocation - $20,000)

(Design and Contingencies - $150,000)

(49) SR 0366 over Pucketa Creek, Murrysville, Bridge Rehabilitation

435,000

(Base Construction Allocation - $244,000)

(Land Allocation - $26,000)

(Design and Contingencies - $165,000)

(50) SR 0366, Bridge No.2, Washington Township, Bridge Rehabilitation

631,000

(Base Construction Allocation - $520,000)

(Land Allocation - $11,000)

(Design and Contingencies - $100,000)

(51) SR 0400 over Beaver Run, Bell Township, Bridge Rehabilitation

764,000

(Base Construction Allocation - $630,000)

(Land Allocation - $14,000)

(Design and Contingencies - $120,000)

(52) SR 0993, Larimer Bridge, North Huntingdon Township, Bridge Rehabilitation

808,000

(Base Construction Allocation - $508,000)

(Land Allocation - $50,000)

(Design and Contingencies - $250,000)

(53) SR 1014 over McGee Run, Derry Township, Bridge Rehabilitation

528,000

(Base Construction Allocation - $358,000)

(Land Allocation - $45,000)

(Design and Contingencies - $125,000)

(54) SR 3101 over Jacks Run, South Greensburg Township, Bridge Rehabilitation

280,000

(Base Construction Allocation - $153,000)

(Land Allocation - $17,000)

(Design and Contingencies - $110,000)

(55) SR 0030 over Monastery Run, Unity Township, Bridge Replacement

1,575,000

(Base Construction Allocation - $1,000,000)

(Land Allocation - $75,000)

(Design and Contingencies - $500,000)

(56) SR 0030 over Branch of Loyalhanna Creek, Unity Township, Bridge Replacement

750,000

(Base Construction Allocation - $500,000)

(Land Allocation - $50,000)

(Design and Contingencies - $200,000)

(57) SR 1022 over Crabtree Creek, Unity Township, Bridge Replacement

775,000

(Base Construction Allocation - $400,000)

(Land Allocation - $75,000)

(Design and Contingencies - $300,000)

(58) SR 3009 over Mon River, Rostraver Township, Bridge Replacement

975,000

(Base Construction Allocation - $500,000)

(Land Allocation - $75,000)

(Design and Contingencies - $400,000)

(59) SR 3103, Zellers Run Bridge, Hempfield Township and Southwest Greensburg Borough, Bridge Rehabilitation

884,000

(Base Construction Allocation - $700,000)

(Land Allocation - $110,000)

(Design and Contingencies - $74,000)

(60) SR 4022 over Brush Run, Penn Borough, Bridge Replacement

365,000

(Base Construction Allocation - $160,000)

(Land Allocation - $105,000)

(Design and Contingencies - $100,000)

(61) SR 4041, Turtle Creek Bridge, Murrysville Borough, Bridge Replacement

505,000

(Base Construction Allocation - $300,000)

(Land Allocation - $125,000)

(Design and Contingencies - $80,000)

(62) SR 3101 over Jacks Run, South Greensburg Borough and Hempfield Township, Bridge Replacement

655,000

(Base Construction Allocation - $300,000)

(Land Allocation - $125,000)

(Design and Contingencies - $230,000)

(63) SR 0031, Buffalo Run Bridge, East Huntingdon Township, Bridge Replacement

675,000

(Base Construction Allocation - $400,000)

(Land Allocation - $75,000)

(Design and Contingencies - $200,000)

(64) SR 0031 over Sherrick Run, East Huntingdon Township, Bridge Replacement

1,475,000

(Base Construction Allocation - $1,000,000)

(Land Allocation - $75,000)

(Design and Contingencies - $400,000)

(65) SR 0031 over Sherrick Run 2, East Huntingdon Township, Bridge Replacement

1,475,000

(Base Construction Allocation - $1,000,000)

(Land Allocation - $75,000)

(Design and Contingencies - $400,000)

(66) SR 0031 over Brush Run, Mount Pleasant Township, Bridge Replacement

305,000

(Base Construction Allocation - $150,000)

(Land Allocation - $75,000)

(Design and Contingencies - $80,000)

(67) SR 0031 over Jacobs Creek, Mount Pleasant Township, Bridge Replacement

675,000

(Base Construction Allocation - $400,000)

(Land Allocation - $75,000)

(Design and Contingencies - $200,000)

(68) SR 0031, Bridge No.2 over Jacobs Run, Mount Pleasant Township, Bridge Replacement

675,000

(Base Construction Allocation - $400,000)

(Land Allocation - $75,000)

(Design and Contingencies - $200,000)

(69) SR 0051 over I-70, Rostraver Township, Bridge Replacement

1,590,000

(Base Construction Allocation - $1,200,000)

(Land Allocation - $90,000)

(Design and Contingencies - $300,000)

(70) SR 0056 over Little Pucketa Creek, City of New Kensington, Bridge Replacement

305,000

(Base Construction Allocation - $150,000)

(Land Allocation - $75,000)

(Design and Contingencies - $80,000)

(71) SR 0056, Bridge No.2 over Little Pucketa Creek, City of New Kensington, Bridge Replacement

850,000

(Base Construction Allocation - $600,000)

(Land Allocation - $50,000)

(Design and Contingencies - $200,000)

(72) SR 0056 over Small Stream, Allegheny Township, Bridge Replacement

1,225,000

(Base Construction Allocation - $750,000)

(Land Allocation - $75,000)

(Design and Contingencies - $400,000)

(73) SR 0070 over Branch of Cedar Creek, South Huntingdon Township, Bridge Replacement

2,650,000

(Base Construction Allocation - $2,000,000)

(Land Allocation - $150,000)

(Design and Contingencies - $500,000)

(74) SR 0119 over Jacks Run, Hempfield Township, Bridge Replacement

465,000

(Base Construction Allocation - $300,000)

(Land Allocation - $45,000)

(Design and Contingencies - $120,000)

(75) SR 0119 over Zellers Run, Southwest Greensburg Borough, Bridge Rehabilitation

1,225,000

(Base Construction Allocation - $750,000)

(Land Allocation - $75,000)

(Design and Contingencies - $400,000)

(76) SR 0119 over Branch of Jacks Run, Hempfield Township, Bridge Replacement

975,000

(Base Construction Allocation - $600,000)

(Land Allocation - $75,000)

(Design and Contingencies - $300,000)

(77) SR 0119 over Crabtree Creek No.2, Hempfield Township, Bridge Rehabilitation

1,125,000

(Base Construction Allocation - $750,000)

(Land Allocation - $75,000)

(Design and Contingencies - $300,000)

(78) SR 0130 over Brush Creek, City of Jeannette, Bridge Replacement

910,000

(Base Construction Allocation - $360,000)

(Land Allocation - $150,000)

(Design and Contingencies - $400,000)

(79) SR 0130 over SR 0030, Hempfield Township, Bridge Rehabilitation

690,000

(Base Construction Allocation - $500,000)

(Land Allocation - $90,000)

(Design and Contingencies - $100,000)

(80) SR 0130 over Slate Creek, Hempfield Township, Bridge Replacement

525,000

(Base Construction Allocation - $150,000)

(Land Allocation - $75,000)

(Design and Contingencies - $300,000)

(81) SR 0201 over Pollock Run, Rostraver Township, Bridge Replacement

525,000

(Base Construction Allocation - $150,000)

(Land Allocation - $75,000)

(Design and Contingencies - $300,000)

(82) SR 0217 over Loyalhanna Creek, Derry Township, Bridge Rehabilitation

1,000,000

(Base Construction Allocation - $800,000)

(Land Allocation - $100,000)

(Design and Contingencies - $100,000)

(83) SR 0259, Freeman Run Bridge No.2, Fairfield Township, Bridge Replacement

675,000

(Base Construction Allocation - $400,000)

(Land Allocation - $75,000)

(Design and Contingencies - $200,000)

(84) SR 0259, Freeman Run Bridge, Bolivar Borough, Bridge Rehabilitation

440,000

(Base Construction Allocation - $300,000)

(Land Allocation - $60,000)

(Design and Contingencies - $80,000)

(85) SR 0271, Mill Creek Bridge, Ligonier Township, Bridge Replacement

505,000

(Base Construction Allocation - $300,000)

(Land Allocation - $125,000)

(Design and Contingencies - $80,000)

(86) SR 0356 over Kiski River, Allegheny Township, Bridge Replacement

1,405,000

(Base Construction Allocation - $1,000,000)

(Land Allocation - $105,000)

(Design and Contingencies - $300,000)

(87) SR 0366 over Pucketa Creek, City of Lower Burrell, Bridge Replacement

1,025,000

(Base Construction Allocation - $650,000)

(Land Allocation - $75,000)

(Design and Contingencies - $300,000)

(88) SR 0381, Powdermill Run Bridge, Cook Township, Bridge Rehabilitation

375,000

(Base Construction Allocation - $100,000)

(Land Allocation - $75,000)

(Design and Contingencies - $200,000)

(89) SR 0711, Mill Creek Bridge No.2, Ligonier Township, Bridge Rehabilitation

420,000

(Base Construction Allocation - $300,000)

(Land Allocation - $50,000)

(Design and Contingencies - $70,000)

(90) SR 0711, Mill Creek Bridge, Ligonier Township, Bridge Rehabilitation

550,000

(Base Construction Allocation - $200,000)

(Land Allocation - $150,000)

(Design and Contingencies - $200,000)

(91) SR 0711, Tubmill Creek Bridge, Fairfield Township, Bridge Replacement

725,000

(Base Construction Allocation - $450,000)

(Land Allocation - $75,000)

(Design and Contingencies - $200,000)

(92) SR 0819 over Jacks Run, Hempfield Township, Bridge Replacement

725,000

(Base Construction Allocation - $450,000)

(Land Allocation - $75,000)

(Design and Contingencies - $200,000)

(93) SR 0819, Porters Run Bridge, Salem Township, Bridge Replacement

775,000

(Base Construction Allocation - $500,000)

(Land Allocation - $75,000)

(Design and Contingencies - $200,000)

(94) SR 0981, Barron Run Bridge, South Huntingdon Township, Bridge Replacement

375,000

(Base Construction Allocation - $100,000)

(Land Allocation - $75,000)

(Design and Contingencies - $200,000)

(95) SR 0982, Nine Mile Run Bridge, Unity Township, Bridge Replacement

775,000

(Base Construction Allocation - $500,000)

(Land Allocation - $75,000)

(Design and Contingencies - $200,000)

(96) SR 0982, Bridge over Stony Run, Derry Township, Bridge Replacement

875,000

(Base Construction Allocation - $500,000)

(Land Allocation - $75,000)

(Design and Contingencies - $300,000)

(97) SR 0993, Brush Creek, North Huntingdon Township, Bridge Replacement

725,000

(Base Construction Allocation - $450,000)

(Land Allocation - $75,000)

(Design and Contingencies - $200,000)

(98) SR 1020, Saxman Run Bridge, Derry Township, Bridge Replacement

1,230,000

(Base Construction Allocation - $750,000)

(Land Allocation - $80,000)

(Design and Contingencies - $400,000)

(99) SR 0056 over Little Pucketa Creek, City of New Kensington, Bridge Replacement

241,000

(Base Construction Allocation - $151,000)

(Land Allocation - $45,000)

(Design and Contingencies - $45,000)

(100) SR 0259 over Freeman Run, Bolivar Borough, Bridge Replacement

264,000

(Base Construction Allocation - $166,000)

(Land Allocation - $49,000)

(Design and Contingencies - $49,000)

(101) SR 0381 over Indian Creek, Donegal Township, Bridge Replacement

181,000

(Base Construction Allocation - $113,000)

(Land Allocation - $34,000)

(Design and Contingencies - $34,000)

(102) SR 2006 over Jacobs Creek, Mount Pleasant Township, Bridge Replacement

132,000

(Base Construction Allocation - $82,000)

(Land Allocation - $25,000)

(Design and Contingencies - $25,000)

(103) SR 2043 over Four Mile Run, Ligonier Township, Bridge Replacement

159,000

(Base Construction Allocation - $99,000)

(Land Allocation - $30,000)

(Design and Contingencies - $30,000)

(104) SR 3045 over Branch of Little Sewickley Creek, Sewickley Township, Bridge Replacement

54,000

(Base Construction Allocation - $34,000)

(Land Allocation - $10,000)

(Design and Contingencies - $10,000)

(105) SR 4028 over Branch of Steels Run, Murrysville Borough, Bridge Replacement

122,000

(Base Construction Allocation - $76,000)

(Land Allocation - $23,000)

(Design and Contingencies - $23,000)