Section 3. Itemization of public improvement projects.
Additional capital projects in the category of public improvement projects to be constructed or acquired by the Department of General Services, its successors or assigns, and to be financed by the incurring of debt, are hereby itemized, together with their respective estimated financial costs, as follows:
Total
Project
Project
Allocation
(1) Department of Agriculture
$556,000
(i) Farm Show Complex - Harrisburg
(A) Parking areas and hard stand improvements
556,000
(Base Project Allocation - $463,000)
(Design and Contingencies - $93,000)
(2) Department of Corrections
$156,991,000
(Amount amended July 11, 1989, P.L.320, No.54)
(i) State Correctional Institution - Camp Hill
(A) Life safety code improvements
4,290,000
(Base Project Allocation - $3,575,000)
(Design and Contingencies - $715,000)
(ii) State Correctional Institution - Dallas
(A) Additional funds for DGS 578-11, guard towers
157,000
(Base Project Allocation - $131,000)
(Design and Contingencies - $26,000)
(B) Additional funds for DGS 578-10, security and lighting
792,000
(Base Project Allocation - $660,000)
(Design and Contingencies - $132,000)
(C) Construction and installation of a water line
795,000
(Base Project Allocation - $663,000)
(Design and Contingencies - $132,000)
(iii) State Correctional Institution - Graterford
(A) Additional funds for DGS 577-10, sewage treatment system
1,734,000
(Base Project Allocation - $1,445,000)
(Design and Contingencies - $289,000)
(B) Life safety code improvements
9,720,000
(Base Project Allocation - $8,100,000)
(Design and Contingencies - $1,620,000)
(C) Installation of waterline and storage tank
2,544,000
(Base Project Allocation - $2,120,000)
(Design and Contingencies - $424,000)
This project is a replacement for project DGS 577-21 authorized in the act of July 10, 1986 (P.L.1285, No.118).
((C) added July 11, 1989, P.L.320, No.54)
(iv) State Correctional Institution - Huntingdon
(A) Security fence and lighting
330,000
(Base Project Allocation - $275,000)
(Design and Contingencies - $55,000)
(B) Life safety code improvements
3,498,000
(Base Project Allocation - $2,915,000)
(Design and Contingencies - $583,000)
(v) State Regional Correctional Facility - Mercer County
(A) Construction of a chapel for use of inmates
400,000
(Base Project Allocation - $400,000)
(vi) State Correctional Institution - Philadelphia
(A) ((A) deleted by amendment July 11, 1989, P.L.320, No.54)
(B) Construction of new detention facility for the City of Philadelphia
50,000,000
(Base Project Allocation - $50,000,000)
(vii) State Correctional Institution - Retreat
(A) Additional funds for DGS 1575-1, conversion of Retreat State Hospital to a State Correctional Institution
4,304,000
(Base Project Allocation - $3,587,000)
(Design and Contingencies - $717,000)
(B) Rehabilitate entrance bridge
792,000
(Base Project Allocation - $660,000)
(Design and Contingencies - $132,000)
(C) Renovations to boiler plant
700,000
(Base Project Allocation - $583,000)
(Design and Contingencies - $117,000)
This project is a replacement for project DGS 1575-2 authorized in the act of July 10, 1986 (P.L.1285, No.118).
((C) added July 11, 1989, P.L.320, No.54)
(viii) State Correctional Institution - Rockview
(A) Restricted housing unit
4,802,000
(Base Project Allocation - $3,960,000)
(Design and Contingencies - $842,000)
(B) Second perimeter fence and lighting
942,000
(Base Project Allocation - $785,000)
(Design and Contingencies - $157,000)
(ix) State Correctional Institution - Smithfield
(A) Bake shop
792,000
(Base Project Allocation - $660,000)
(Design and Contingencies - $132,000)
(B) Cell block
6,864,000
(Base Project Allocation - $5,720,000)
(Design and Contingencies - $1,144,000)
(x) State Correctional Institution - Waynesburg
(A) Emergency generator
198,000
(Base Project Allocation - $165,000)
(Design and Contingencies - $33,000)
(B) Perimeter lighting and electronic type perimeter detection system
257,000
(Base Project Allocation - $257,000)
(C) Educational/Visitors Center
480,000
(Base Project Allocation - $480,000)
(xi) State Correctional Institution - City of Chester, Pennsylvania
(A) Construction of a new prison facility to house and provide treatment for drug offenders, including land acquisition
50,000,000
(Base Project Allocation - $41,667,000)
(Design and Contingencies - $8,333,000)
((xi) added July 11, 1989, P.L.320, No.54)
(xii) State Correctional Institution - Farview
(A) Conversion of parts of Farview State Hospital into a correctional institution
12,600,000
(Base Project Allocation - $12,600,000)
((xii) added July 11, 1989, P.L.320, No.54)
(3) Department of Education
$442,003,000
(Amount amended July 11, 1989, P.L.320, No.54)
(i) Lincoln University
(A) Fire protection improvements
460,000
(Base Project Allocation - $383,000)
(Design and Contingencies - $77,000)
(B) Construction of Living-Learning Center
17,100,000
(Base Project Allocation - $17,100,000)
(ii) Scranton State School for the Deaf
(A) Renovation to school properties
2,200,000
(Base Project Allocation - $2,000,000)
(Design and Contingencies - $200,000)
(iii) Scotland School for Veterans' Children
(A) Campus fire alarm system
726,000
(Base Project Allocation - $605,000)
(Design and Contingencies - $121,000)
(B) Replacement of PCB transformers
462,000
(Base Project Allocation - $385,000)
(Design and Contingencies - $77,000)
(iv) Thaddeus Stevens State School of Technology
(A) Conversion of cottages "A" and "B" and construction of an addition for a learning resource center
4,000,000
(Base Project Allocation - $3,300,000)
(Design and Contingencies - $700,000)
(B) Resurface roads and parking area
120,000
(Base Project Allocation - $100,000)
(Design and Contingencies - $20,000)
(C) Repairs to athletic field
210,000
(Base Project Allocation - $175,000)
(Design and Contingencies - $35,000)
(D) Replacement of sidewalks and curbing
157,000
(Base Project Allocation - $131,000)
(Design and Contingencies - $26,000)
(E) Landscaping and fencing
168,000
(Base Project Allocation - $140,000)
(Design and Contingencies - $28,000)
(F) Energy conservation: Installation of storm windows and install automatic temperature control
108,000
(Base Project Allocation - $90,000)
(Design and Contingencies - $18,000)
(G) Utility repairs and improvements: Replace various sewer and water lines; replace steam lines and improve boiler room instrumentation
372,000
(Base Project Allocation - $310,000)
(Design and Contingencies - $62,000)
(H) Painting, glazing and roof repairs: Miscellaneous slate, tin and spout repairs, all buildings as required; also roof repairs Hartzell classroom building
441,000
(Base Project Allocation - $369,000)
(Design and Contingencies - $72,000)
(I) Rehabilitation and Safety Equipment: Installation of smoke detectors; replace fire escape; replace fire alarm activator; renovate Canteen building; repair floors and doors in Brenner Hall and the Administration Building; expand master lock system
547,000
(Base Project Allocation - $457,000)
(Design and Contingencies - $90,000)
(J) Additional funds for DGS 417-15
217,000
(K) Renovation of two dormitories
1,800,000
(Base Project Allocation - $1,500,000)
(Design and Contingencies - $300,000)
(L) Construction of a new dormitory
4,750,000
(Base Project Allocation - $4,000,000)
(Design and Contingencies - $750,000)
(M) Additional boiler
900,000
(Base Project Allocation - $750,000)
(Design and Contingencies - $150,000)
(N) 28,000 sq. ft. addition to Building #3 for vocational-technical training
646,000
(Base Project Allocation - $538,000)
(Design and Contingencies - $108,000)
(v) Pennsylvania State University
(A) University Park
(I) Construction of addition to the east wing of Pattee Library
19,800,000
(Base Project Allocation - $16,500,000)
(Design and Contingencies - $3,300,000)
(II) Construction of new research center
17,700,000
(Base Project Allocation - $14,750,000)
(Design and Contingencies - $2,950,000)
(III) Removal of asbestos from Eisenhower Auditorium
4,500,000
(Base Project Allocation - $3,750,000)
(Design and Contingencies - $750,000)
(IV) Construction of a new general purpose classroom
5,000,000
(Base Project Allocation - $4,167,000)
(Design and Contingencies - $833,000)
(V) Renovation of storm water management system
3,200,000
(Base Project Allocation - $2,667,000)
(Design and Contingencies - $533,000)
(VI) ((VI) repealed Oct. 10, 1997, P.L.392, No.47)
(VII) Improvements and additions to central energy plant and distribution systems (Hershey Medical Center)
12,000,000
(Base Project Allocation - $12,000,000)
(VIII) Construction of a convocation center in State College
28,800,000
(Base Project Allocation - $24,000,000)
(Design and Contingencies - $4,800,000)
(IX) Addition to DGS 800-194 for construction of agricultural science and industry building
5,000,000
(Base Project Allocation - $5,000,000)
(X) ((X) deleted by amendment July 11, 1989, P.L.320, No.54)
(XI) ((XI) deleted by amendment July 11, 1989, P.L.320, No.54)
(XII) ((XII) deleted by amendment July 11, 1989, P.L.320, No.54)
(XIII) ((XIII) deleted by amendment July 11, 1989, P.L.320, No.54)
(XIV) ((XIV) deleted by amendment July 11, 1989, P.L.320, No.54)
(XV) ((XV) deleted by amendment July 11, 1989, P.L.320, No.54)
(XVI) ((XVI) deleted by amendment July 11, 1989, P.L.320, No.54)
(B) Altoona Campus
(I) Electrical distribution system
1,600,000
(Base Project Allocation - $1,600,000)
(II) ((II) deleted by amendment July 11, 1989, P.L.320, No.54)
(C) Beaver Campus
(I) Construction of a new learning center
2,850,000
(Base Project Allocation - $2,850,000)
(D) Berks Campus
(I) Acquisition of land and development of an agricultural instruction center
5,500,000
(Base Project Allocation - $4,500,000)
(Design and Contingencies - $1,000,000)
(E) Capital College
(I) Electrical distribution system
3,500,000
(Base Project Allocation - $3,500,000)
(II) Installation of distribution and heating systems for various campus buildings
1,367,000
(Base Project Allocation - $1,139,000)
(Design and Contingencies - $228,000)
(F) Delaware County Campus
(I) Construction of classroom building
4,000,000
(Base Project Allocation - $4,000,000)
(G) Fayette Campus
(I) Construction of a multipurpose technological-cultural "Southwest Institute" to support regional socioeconomic development
4,000,000
(Base Project Allocation - $3,350,000)
(Design and Contingencies - $650,000)
(II) Construction of an agricultural sciences classroom/laboratory building to support new programming efforts
2,850,000
(Base Project Allocation - $2,375,000)
(Design and Contingencies - $475,000)
(III) Replace HVAC library building
300,000
(Base Project Allocation - $300,000)
(H) New Kensington Campus
(I) Construction of a science and technology center
1,650,000
(Base Project Allocation - $1,500,000)
(Design and Contingencies - $150,000)
(II) Addition to Academic Building
1,650,000
(Base Project Allocation - $1,500,000)
(Design and Contingencies - $150,000)
(I) Ogontz Campus - Renovations of Sutherland and Lares Buildings
4,500,000
(Base Project Allocation - $3,750,000)
(Design and Contingencies - $750,000)
(J) Schuylkill Campus - Construction of a new library
1,600,000
(Base Project Allocation - $1,333,000)
(Design and Contingencies - $267,000)
(K) Shenango Campus - Construction of student activities and classroom complex
4,000,000
(Base Project Allocation - $3,500,000)
(Design and Contingencies - $500,000)
(L) Wilkes-Barre Campus - Construction of Technology Center
1,200,000
(Base Project Allocation - $1,000,000)
(Design and Contingencies - $200,000)
(M) Projects covering all branches
(I) PCB electrical system project
3,100,000
(Base Project Allocation - $2,583,000)
(Design and Contingencies - $517,000)
(II) Storm water management systems - Phase I
4,300,000
(Base Project Allocation - $4,300,000)
(N) Erie Campus - Construction of multipurpose facility for student activities
10,000,000
(Base Project Allocation - $9,000,000)
(Design and Contingencies - $1,000,000)
(vi) University of Pittsburgh
(A) Main Campus
(I) Acquisition and renovation of the Bellefield Annex
12,000,000
(Base Project Allocation - $10,000,000)
(Design and Contingencies - $2,000,000)
(II) Renovation and addition to Alumni Hall and chemistry building
13,000,000
(Base Project Allocation - $10,833,000)
(Design and Contingencies - $2,167,000)
(III) Renovation of the Trees Pool and Gymnasium Complex
5,000,000
(Base Project Allocation - $4,167,000)
(Design and Contingencies - $833,000)
(IV) Phase II, multipurpose building
12,800,000
(Base Project Allocation - $10,667,000)
(Design and Contingencies - $2,133,000)
(V) Construction of addition to Victoria Hall
7,200,000
(Base Project Allocation - $7,200,000)
(VI) Replacement of the steam distribution system - Phase II
2,000,000
(Base Project Allocation - $2,000,000)
(VII) Acquisition, construction and renovation of faculty offices and conference space for Pediatric Department of Medical School
16,800,000
(Base Project Allocation - $14,000,000)
(Design and Contingencies - $2,800,000)
(VIII) Construction of a convocation and fieldhouse complex
30,000,000
(Base Project Allocation - $25,000,000)
(Design and Contingencies - $5,000,000)
(IX) Additional funds for DGS1103-32, Salk Hall and Dental Clinic renovation
4,900,000
(Base Project Allocation - $4,500,000)
(Design and Contingencies - $400,000)
(B) Bradford Campus
(I) Renovations to Swartz Hall DGS 1103-A, Fisher Hall DGS 1103-20, and common facilities building DGS 1103-30
1,200,000
(Base Project Allocation - $1,000,000)
(Design and Contingencies - $200,000)
(II) Moveable equipment for library administration building
150,000
(Base Project Allocation - $130,000)
(Design and Contingencies - $20,000)
(C) Greensburg Campus
(I) Construction of library/administration building
6,600,000
(Base Project Allocation - $5,200,000)
(Design and Contingencies - $1,400,000)
(D) Johnstown Campus
(I) Construction of a new boiler with multifuel capacity
4,500,000
(Base Project Allocation - $3,750,000)
(Design and Contingencies - $750,000)
(II) Renovation and addition to student union
2,226,000
(Base Project Allocation - $2,226,000)
(III) Construction of an administration building
7,000,000
(Base Project Allocation - $7,000,000)
(E) Titusville Campus
(I) Construction of a new science center
10,625,000
(Base Project Allocation - $8,500,000)
(Design and Contingencies - $2,125,000)
(vii) Temple University
(A) Main Campus
(I) Kardon Building Academic Center - that portion of total project consisting of replacement of elevators and mechanical and electrical systems, exterior repairs as required, and interior renovations of four floors as required for academic uses
21,600,000
(Base Project Allocation - $18,000,000)
(Design and Contingencies - $3,600,000)
(B) Rehabilitation, recreation and convocation center
33,600,000
(Base Project Allocation - $28,000,000)
(Design and Contingencies - $5,600,000)
(C) Atlantic Building on Science and Technology Campus
7,200,000
(Base Project Allocation - $6,000,000)
(Design and Contingencies - $1,200,000)
(D) Fire and safety renovations to comply with High Rise Fire Code and other standards, including installation of sprinkler, fire detection and alarm systems and associated facilities, to DGS Project Nos. 1104-03, 1104-05, 1104-08, 1104-12, 1104-13, 1104-16, 1104-17, 1104-21, 1104-22, 1104-24 and 1104-30
19,740,000
(Base Project Allocation - $16,450,000)
(Design and Contingencies - $3,290,000)
(E) Acquisition and renovation of Seltzer Hall
7,200,000
(Base Project Allocation - acquisition - $3,000,000)
(Base Project Allocation - renovation - $3,000,000)
(Design and Contingencies - $1,200,000)
(F) Classroom and laboratory building
14,400,000
(Base Project Allocation - $12,000,000)
(Design and Contingencies - $2,400,000)
(G) Additional funds for Dental School DGS 1104-32 - Phase II - including retransfer of $1,100,000 to DGS 1104-34
2,000,000
((G) added July 11, 1989, P.L.320, No.54)
(viii) Butler County Community College
(A) For the maintenance of heating and ventilation for the library and applied science building
350,000
(Base Project Allocation - $350,000)
(ix) Lehigh University
(A) Renovation and rehabilitation for Homer Research Facility
3,000,000
(Base Project Allocation - $3,000,000)
(x) Philadelphia College of Textiles and Science
(A) Building of new library
7,200,000
(Base Project Allocation - $6,000,000)
(Design and Contingencies - $1,200,000)
(xi) Williamson Free School of Mechanical Trades
(A) Renovation of student infirmary
136,000
(Base Project Allocation - $114,000)
(Design and Contingencies - $22,000)
(4) Emergency Management Agency
$3,056,000
(i) Lackawanna County
(A) Construction of a volunteer firefighter training facility in Abington Township
180,000
(Base Project Allocation - $180,000)
(ii) Mifflin County
(A) Centralization of emergency communications center
500,000
(Base Project Allocation - $450,000)
(Design and Contingencies - $50,000)
(iii) State Fire Academy
(A) Residence hall
2,376,000
(Base Project Allocation - $1,980,000)
(Design and Contingencies - $396,000)
(5) Department of Environmental Resources
$457,612,000
(Amount amended July 11, 1989, P.L.320, No.54)
(i) Bald Eagle State Park
(A) Resurface roads and boat launch
491,000
(Base Project Allocation - $409,000)
(Design and Contingencies - $82,000)
(B) Water and sewer improvements and addition to Park Office
220,000
(Base Project Allocation - $183,000)
(Design and Contingencies - $37,000)
(C) Installation of lights, restroom rehabilitation and construction, dust control
126,000
(Base Project Allocation - $105,000)
(Design and Contingencies - $21,000)
(D) Marina and dock repairs and replacement
2,568,000
(Base Project Allocation - $2,140,000)
(Design and Contingencies - $428,000)
(E) Remove railroad grade, playground equipment, air conditioning for park office, curbing at beach area, overhead doors for maintenance building, rebuild road
167,000
(Base Project Allocation - $139,000)
(Design and Contingencies - $28,000)
(F) Park superintendent residence
153,000
(Base Project Allocation - $127,000)
(Design and Contingencies - $26,000)
(ii) Bendigo State Park
(A) Rehabilitate latrines and bathhouse
312,000
(Base Project Allocation - $260,000)
(Design and Contingencies - $52,000)
(B) Pool supplies, concession building
128,000
(Base Project Allocation - $106,000)
(Design and Contingencies - $22,000)
(C) Rehabilitate roads and parking lots, repairs to office, residence and maintenance building, dam and bridge repair
143,000
(Base Project Allocation - $119,000)
(Design and Contingencies - $24,000)
(iii) Black Moshannon State Park
(A) Renovate washhouses, changehouses and lifeguard shack
330,000
(Base Project Allocation - $275,000)
(Design and Contingencies - $55,000)
(B) Road and parking facility repair and construction
440,000
(Base Project Allocation - $367,000)
(Design and Contingencies - $73,000)
(C) Water and sewer construction and repair
228,000
(Base Project Allocation - $190,000)
(Design and Contingencies - $38,000)
(D) Windows, trail renovation, heating system and electrical work, construct boat docks and storage shed
122,000
(Base Project Allocation - $101,000)
(Design and Contingencies - $21,000)
(E) Construct contact station and comfort station, roof replacements
219,000
(Base Project Allocation - $182,000)
(Design and Contingencies - $37,000)
(iv) Blue Knob State Park
(A) Improve roads, dining hall, latrines, basketball courts
1,400,000
(Base Project Allocation - $1,400,000)
(v) Chapman State Park
(A) Replace park office and maintenance building
288,000
(Base Project Allocation - $240,000)
(Design and Contingencies - $48,000)
(B) Road and parking lot paving and repair
426,000
(Base Project Allocation - $355,000)
(Design and Contingencies - $71,000)
(C) Water and sewer repair and replacement
228,000
(Base Project Allocation - $190,000)
(Design and Contingencies - $38,000)
(D) Desilt lake, dam maintenance, beach and dock repair
402,000
(Base Project Allocation - $335,000)
(Design and Contingencies - $67,000)
(E) Trail rehabilitation, heating system, playground equipment and renovation, construct ice skating lagoon, replace roof and partition
154,000
(Base Project Allocation - $128,000)
(Design and Contingencies - $26,000)
(vi) Cherry Springs State Park
(A) Construct shed and comfort station, repair road, extend water system
119,000
(Base Project Allocation - $99,000)
(Design and Contingencies - $20,000)
(vii) Colton Point State Park
(A) Repair road, replace latrine, replace water line, construct new chlorinator building
563,000
(Base Project Allocation - $469,000)
(Design and Contingencies - $94,000)
(viii) Denton Hill State Park
(A) Resurface road, energy conservation, re-roof buildings
92,000
(Base Project Allocation - $76,000)
(Design and Contingencies - $16,000)
(ix) Elk State Park
(A) Rehabilitation of parking lots, dock area and camping area
190,000
(Base Project Allocation - $158,000)
(Design and Contingencies - $32,000)
(x) Hills Creek State Park
(A) Dam rehabilitation
1,205,000
(Base Project Allocation - $1,004,000)
(Design and Contingencies - $201,000)
(B) Water, bathhouse, sewage projects
137,000
(Base Project Allocation - $114,000)
(Design and Contingencies - $23,000)
(C) Repair of roads, heating system, bathhouses, phone system, building maintenance, replace sewage plant equipment
268,000
(Base Project Allocation - $223,000)
(Design and Contingencies - $45,000)
(xi) Hyner Run State Park
(A) Pool repairs
120,000
(Base Project Allocation - $100,000)
(Design and Contingencies - $20,000)
(B) Restroom repairs
180,000
(Base Project Allocation - $150,000)
(Design and Contingencies - $30,000)
(C) Road, building, campground, picnic area repairs, stream improvements, playground and telephone equipment
293,000
(Base Project Allocation - $244,000)
(Design and Contingencies - $49,000)
(xii) Hyner View State Park
(A) Repair of road, parking area, pavilion, wall and toilets
212,000
(Base Project Allocation - $176,000)
(Design and Contingencies - $36,000)
(xiii) Kettle Creek State Park
(A) Road rehabilitation
132,000
(Base Project Allocation - $110,000)
(Design and Contingencies - $22,000)
(B) Rehabilitation of nature center, renovate toilets, redesign maintenance building, boat dock and mooring area
172,000
(Base Project Allocation - $143,000)
(Design and Contingencies - $29,000)
(xiv) Kinzua Bridge State Park
(A) New campground and facilities
660,000
(Base Project Allocation - $550,000)
(Design and Contingencies - $110,000)
(B) Improve overlook area and parking lot, replace bridge planks, concession stand, new maintenance building
218,000
(Base Project Allocation - $181,000)
(Design and Contingencies - $37,000)
(xv) Leonard Harrison State Park
(A) Latrine replacement
540,000
(Base Project Allocation - $450,000)
(Design and Contingencies - $90,000)
(B) Renovate main overlook walkway
198,000
(Base Project Allocation - $165,000)
(Design and Contingencies - $33,000)
(C) Replace furnace, flagpole base and sidewalk; rehabilitation of concession stand; visitors center and trail; repave parking lot; construct pavilion and new maintenance building
173,000
(Base Project Allocation - $144,000)
(Design and Contingencies - $29,000)
(xvi) Little Pine State Park
(A) Water and sewer upgrade
255,000
(Base Project Allocation - $212,000)
(Design and Contingencies - $43,000)
(B) Desilt dam
240,000
(Base Project Allocation - $200,000)
(Design and Contingencies - $40,000)
(C) Renovation of office, campground pads, group tenting area and foot bridge in campground
144,000
(Base Project Allocation - $120,000)
(Design and Contingencies - $24,000)
(D) Repair buildings, roads, drainage ditches; purchase front end loader; new beach sand; riprap on dam; renovate picnic area, shooting range, restrooms, dam, visitors center, play area, concession area, stream, beach, boat mooring areas, gates; barge to work with flood debris
714,000
(Base Project Allocation - $595,000)
(Design and Contingencies - $119,000)
(xvii) Lyman Run State Park
(A) Rehabilitation of dam
1,200,000
(Base Project Allocation - $1,000,000)
(Design and Contingencies - $200,000)
(B) New garage and storage building; repave roads
188,000
(Base Project Allocation - $156,000)
(Design and Contingencies - $32,000)
(C) Comfort stations; changehouses; concession; camping area rehabilitation
174,000
(Base Project Allocation - $145,000)
(Design and Contingencies - $29,000)
(xviii) McCall's Dam State Park
(A) Rehabilitation of latrine and group tent camping area
32,000
(Base Project Allocation - $26,000)
(Design and Contingencies - $6,000)
(xix) Mt. Pisgah State Park
(A) Road, dam and parking lot repairs; renovate boat dock
126,000
(Base Project Allocation - $105,000)
(Design and Contingencies - $21,000)
(B) Residence, pool, pumphouse repair; burglar alarms, landscaping; water and sewer repairs, building repairs; road work; equipment purchases; replace gas and oil tanks; trail repair
314,000
(Base Project Allocation - $261,000)
(Design and Contingencies - $53,000)
(xx) Ole Bull State Park
(A) Renovate trails, toilets, buildings, water system; re-roof beach house; rehabilitate maintenance building; electrical work
144,000
(Base Project Allocation - $120,000)
(Design and Contingencies - $24,000)
(B) Resurface roads
156,000
(Base Project Allocation - $130,000)
(Design and Contingencies - $26,000)
(xxi) Parker Dam State Park
(A) Rehabilitate roads
473,000
(Base Project Allocation - $394,000)
(Design and Contingencies - $79,000)
(B) Water, sewer and dam projects
123,000
(Base Project Allocation - $102,000)
(Design and Contingencies - $21,000)
(C) Rehabilitation of cabins, maintenance building, nature center, pavilion and playground; campsite electrical hookups; campsite markers
390,000
(Base Project Allocation - $325,000)
(Design and Contingencies - $65,000)
(xxii) Patterson State Park
(A) Drill new well; resurface road; replace latrine; re-roof pavilions
53,000
(Base Project Allocation - $44,000)
(Design and Contingencies - $9,000)
(xxiii) Poe Paddy State Park
(A) Renovate campgrounds, latrines, trails, drinking water system; replace fire rings, grills, picnic tables and garbage cans
162,000
(Base Project Allocation - $135,000)
(Design and Contingencies - $27,000)
(xxiv) Poe Valley State Park
(A) Campground renovation
360,000
(Base Project Allocation - $300,000)
(Design and Contingencies - $60,000)
(B) Beachhouse renovation
150,000
(Base Project Allocation - $125,000)
(Design and Contingencies - $25,000)
(C) Water and sewer projects; comfort station replacement
356,000
(Base Project Allocation - $296,000)
(Design and Contingencies - $60,000)
(D) Renovation of concession stand, nature center, park entrance, shale pit, fuel dispensing system, storage building, trail system, hand pump; replace picnic tables, garbage cans, grills, fire rings; pit vault cleaning; roof work; rehabilitation of office, maintenance area, day-use area; landscaping; dead limb removal; concession boat docking facility; survey boundary
562,000
(Base Project Allocation - $468,000)
(Design and Contingencies - $94,000)
(E) Sand beach renovation; park entrance bridge renovation; resurface roads; dam control; boat mooring
135,000
(Base Project Allocation - $112,000)
(Design and Contingencies - $23,000)
(xxv) Prouty Place State Park
(A) Construct comfort station; regravel dirt road
48,000
(Base Project Allocation - $40,000)
(Design and Contingencies - $8,000)
(xxvi) R. B. Winter State Park
(A) Restroom and bathhouse repair
144,000
(Base Project Allocation - $120,000)
(Design and Contingencies - $24,000)
(B) Road, bridge and parking lot repairs
108,000
(Base Project Allocation - $90,000)
(Design and Contingencies - $18,000)
(C) Rehabilitation of old maintenance building, visitors center, camping area restroom, playground and campground; replace beach sand, garbage cans, picnic tables, grills, charcoal dumps; landscaping; install fence of maintenance yard
290,000
(Base Project Allocation - $241,000)
(Design and Contingencies - $49,000)
(xxvii) Ravensburg State Park
(A) Install fence, signs and new entrance; replace picnic tables; rehabilitation of restrooms; restroom and shower in campground
372,000
(Base Project Allocation - $310,000)
(Design and Contingencies - $62,000)
(xxviii) Reed's Gap State Park
(A) Water and sewer projects
237,000
(Base Project Allocation - $197,000)
(Design and Contingencies - $40,000)
(B) Road and bridge repair
213,000
(Base Project Allocation - $177,000)
(Design and Contingencies - $36,000)
(C) Replace residence; renovate campground, maintenance building, fuel dispensing system, trails and park buildings; replace garbage cans, fire rings, grills, picnic tables; boundary survey
431,000
(Base Project Allocation - $359,000)
(Design and Contingencies - $72,000)
(xxix) S. B. Elliott State Park
(A) Rehabilitation of campground restroom; campsite markers; campsite electric hookup
32,000
(Base Project Allocation - $26,000)
(Design and Contingencies - $6,000)
(xxx) Sand Bridge State Park
(A) Building rehabilitation
27,000
(Base Project Allocation - $22,000)
(Design and Contingencies - $5,000)
(xxxi) Shikellamy State Park
(A) Replace docks
360,000
(Base Project Allocation - $300,000)
(Design and Contingencies - $60,000)
(B) Road repairs; recondition roof; riprap; sewage system extension; rehabilitation of restroom; recaulk bulkheads; replace windows
246,000
(Base Project Allocation - $205,000)
(Design and Contingencies - $41,000)
(xxxii) Sinnemahoning State Park
(A) Repair service gate, conduit and spillway
1,200,000
(Base Project Allocation - $1,000,000)
(Design and Contingencies - $200,000)
(B) Trash boom replacement
581,000
(Base Project Allocation - $484,000)
(Design and Contingencies - $97,000)
(C) Road and bridge repairs
322,000
(Base Project Allocation - $268,000)
(Design and Contingencies - $54,000)
(D) Desilt lake
1,200,000
(Base Project Allocation - $1,000,000)
(Design and Contingencies - $200,000)
(E) Water and sewer projects
306,000
(Base Project Allocation - $255,000)
(Design and Contingencies - $51,000)
(F) Rehabilitation of trails, water supply, beach and emergency gate wells; replace roofs; heating systems, cable barrier, residence, park office, guide rail; debris cleanup; fuel storage tank; stream stabilization; vegetation control; security fence; beach sand; amphitheater renovations; play equipment; construct nature center, storage area, comfort station and two pavilions; carpenter shop addition
1,341,000
(Base Project Allocation - $1,117,000)
(Design and Contingencies - $224,000)
(xxxiii) Sizerville State Park
(A) Road repairs
522,000
(Base Project Allocation - $435,000)
(Design and Contingencies - $87,000)
(B) Water and sewer projects
404,000
(Base Project Allocation - $336,000)
(Design and Contingencies - $68,000)
(C) Pool repairs
129,000
(Base Project Allocation - $107,000)
(Design and Contingencies - $22,000)
(D) Rehabilitation of electric system, amphitheater, grills, footbridges, baskets, park office, maintenance building; replace barn fencing, heating oil tanks, signs, waterlines, walkways, grills, benches, play equipment, heating systems, gutters, pavilion supports; enlarge campground; paint and roof all buildings; install two footbridges; enlarge maintenance building and kitchen of residence; resurface driveways and garage area
616,000
(Base Project Allocation - $513,000)
(Design and Contingencies - $103,000)
(xxxiv) Region II Central Office
(A) Cabin maintenance
72,000
(Base Project Allocation - $60,000)
(Design and Contingencies - $12,000)
(xxxv) Clear Creek State Park
(A) Repair heating systems; repair roofing; repair vaults; repair wells; repair cabins, install siding on park office; fence reservoir; repair toilets; repair parking lot and roads; prune trees; desilt lake
138,000
(Base Project Allocation - $115,000)
(Design and Contingencies - $23,000)
(xxxvi) Cook Forest State Park
(A) Paint swimming pool; repair cabins; re-roof and repair restrooms, Toms Run Dam; repair trails; repair sawmill and water tank; replace doors, repair roads; motor protection; install drainage; landscape river cabs; install fencing; rehabilitation of long shed; replace blower filter
312,000
(Base Project Allocation - $260,000)
(Design and Contingencies - $52,000)
(B) Pave roads
569,000
(Base Project Allocation - $474,000)
(Design and Contingencies - $95,000)
(C) Rehabilitation of Firetower Road
300,000
(Base Project Allocation - $250,000)
(Design and Contingencies - $50,000)
(xxxvii) Hillman State Park
(A) Fire damage pavilion
36,000
(Base Project Allocation - $30,000)
(Design and Contingencies - $6,000)
(xxxviii) Keystone State Park
(A) Drawdown channel; beach repair water tower; repair and install toilets
396,000
(Base Project Allocation - $330,000)
(Design and Contingencies - $66,000)
(B) Parking lots
496,000
(Base Project Allocation - $413,000)
(Design and Contingencies - $83,000)
(xxxix) Kooser State Park
(A) Rehabilitation of main roads
212,000
(Base Project Allocation - $176,000)
(Design and Contingencies - $36,000)
(B) Rehabilitation of buildings and cabins; smoke detectors; storm windows
138,000
(Base Project Allocation - $115,000)
(Design and Contingencies - $23,000)
(C) Mighty Oak Pavilion; fire rings; master key locks; tree removal; repair bridges; dam trash rack; extend water line; rehabilitation of latrine area; Van Dyke toilet; drinking fountains
166,000
(Base Project Allocation - $138,000)
(Design and Contingencies - $28,000)
(xl) Laurel Hill State Park
(A) Replace water lines
300,000
(Base Project Allocation - $250,000)
(Design and Contingencies - $50,000)
(B) Pave roads; expand and repair parking areas; rehabilitation of bath area
1,119,000
(Base Project Allocation - $932,000)
(Design and Contingencies - $187,000)
(C) Landscape beach area
210,000
(Base Project Allocation - $175,000)
(Design and Contingencies - $35,000)
(D) Camp lease; replace locks; replace fire extinguishers; desilt dams; install electric; repair woodshop equipment; re-roof buildings; install siding and insulation on buildings; repair buildings; install fire rings; install ball fields; repair sewage treatment plant; replace road construction; trail and bridge repair; stain buildings; post and gate repairs; dam boat launch area; convert camp office; sign replacement; park bound maintenance
600,000
(Base Project Allocation - $500,000)
(Design and Contingencies - $100,000)
(xli) Laurel Ridge State Park
(A) Repair trails, trail shelters, chimney; park boundary maintenance; windows and insulation in residence; locks-master keying
210,000
(Base Project Allocation - $175,000)
(Design and Contingencies - $35,000)
(xlii) Linn Run State Park
(A) Road and parking lot repair; pit rehabilitation
138,000
(Base Project Allocation - $115,000)
(Design and Contingencies - $23,000)
(B) Re-roof cabins; trail repair; rehabilitation of playground; rehabilitation maintenance, building and pavilion; replace wiring, windows and fuel tank
137,000
(Base Project Allocation - $114,000)
(Design and Contingencies - $23,000)
(xliii) M. K. Goddard State Park
(A) Road, sidewalk and trail repair
135,000
(Base Project Allocation - $112,000)
(Design and Contingencies - $23,000)
(B) Launch and dock repair; marina tree work; lift station repairs, toilet partitions; well repair; office repair; replace floatation; remove electric service; boundary line maintenance; sign repair; lights; tower repair; restaurant fan
207,000
(Base Project Allocation - $172,000)
(Design and Contingencies - $35,000)
(xliv) McConnell's Mill State Park
(A) Repair dam, roads, trail; repair residence; replace comfort station
77,000
(Base Project Allocation - $64,000)
(Design and Contingencies - $13,000)
(xlv) Moraine State Park
(A) Road repair
125,000
(Base Project Allocation - $104,000)
(Design and Contingencies - $21,000)
(B) Rehabilitate sewage system, marina, beach changing building, boat launches residence; replace water main, furnace and restaurant roof
322,000
(Base Project Allocation - $268,000)
(Design and Contingencies - $54,000)
(xlvi) Ohiopyle State Park
(A) Construct restroom facilities
180,000
(Base Project Allocation - $150,000)
(Design and Contingencies - $30,000)
(B) Bridge removal
240,000
(Base Project Allocation - $200,000)
(Design and Contingencies - $40,000)
(C) Construct cabin colony
600,000
(Base Project Allocation - $500,000)
(Design and Contingencies - $100,000)
(D) Construct group camping area
360,000
(Base Project Allocation - $300,000)
(Design and Contingencies - $60,000)
(E) Repair office, construct restroom; construct pole barn; building maintenance; building repairs; park boundary work; radio replacement; rehabilitate water and sewer plant; electrical repairs; bridge repair
620,000
(Base Project Allocation - $516,000)
(Design and Contingencies - $104,000)
(F) Construct changing room facility
300,000
(Base Project Allocation - $250,000)
(Design and Contingencies - $50,000)
(xlvii) Oil Creek State Park
(A) Route 8 entrance relocation
240,000
(Base Project Allocation - $200,000)
(Design and Contingencies - $40,000)
(B) Bike trail repair and rehabilitation of bike rental building
377,000
(Base Project Allocation - $314,000)
(Design and Contingencies - $63,000)
(C) Cemetery rehabilitation, water system repair, gate repairs, storage building repair, vehicle repair, hiking trail rehabilitation, residence rehabilitation, park office addition, roof for maintenance building, electric service
180,000
(Base Project Allocation - $150,000)
(Design and Contingencies - $30,000)
(xlviii) Point State Park
(A) Replace park benches and site maintenance
304,000
(Base Project Allocation - $253,000)
(Design and Contingencies - $51,000)
(B) Rehabilitate belgium block, rehabilitate walk; landscaping
156,000
(Base Project Allocation - $130,000)
(Design and Contingencies - $26,000)
(C) Lighting, lawn sprinkling system, fountain repairs
285,000
(Base Project Allocation - $237,000)
(Design and Contingencies - $48,000)
(xlix) Presque Isle State Park
(A) Road, parking lot and marina lift paving
342,000
(Base Project Allocation - $285,000)
(Design and Contingencies - $57,000)
(B) Rehabilitation of ferry slip
120,000
(Base Project Allocation - $100,000)
(Design and Contingencies - $20,000)
(C) Marina construction, highway line painting, resurfacing pier cart, pipe gates, fuel storage, screen park residence, dredging, marina gas dock, sign replacement toilets, ice rescue crosses
258,000
(Base Project Allocation - $215,000)
(Design and Contingencies - $43,000)
(l) Pymatuning State Park
(A) Pave and seal roads
1,744,000
(Base Project Allocation - $1,453,000)
(Design and Contingencies - $291,000)
(B) Rehabilitation of buildings, docks and storage buildings, toilet repair, tuttle drainage, dumpster pads, spillway fence, traffic sign replacement
203,000
(Base Project Allocation - $169,000)
(Design and Contingencies - $34,000)
(li) Raccoon Creek State Park
(A) Water and sewer, dam repairs
152,000
(Base Project Allocation - $126,000)
(Design and Contingencies - $26,000)
(B) Lodge roof, cabin repairs, dam repairs, trail repairs, park gates, beach house repairs, fence, lodge furnace
294,000
(Base Project Allocation - $245,000)
(Design and Contingencies - $49,000)
(lii) Region II Regional Office
(A) Motorized equipment, engineer, hydraulic lift, maintenance building heating system, office rehabilitation
221,000
(Base Project Allocation - $184,000)
(Design and Contingencies - $37,000)
(liii) Ryerson State Park
(A) Desilt lake
322,000
(Base Project Allocation - $268,000)
(Design and Contingencies - $54,000)
(B) Asbestos removal, pool repairs, rehabilitation of roofs, rehabilitation of playground, office addition, replace chimneys, road maintenance, trail drainage
228,000
(Base Project Allocation - $190,000)
(Design and Contingencies - $38,000)
(liv) Yellow Creek State Park
(A) Dam repair
135,000
(Base Project Allocation - $112,000)
(Design and Contingencies - $23,000)
(B) Road rehabilitation, paving
240,000
(Base Project Allocation - $200,000)
(Design and Contingencies - $40,000)
(C) Rehabilitation of maintenance building, rehabilitation of beachfront, lift station panel, electric motor repair, spillway repairs, replace boat docks, furnace replacement, boat launch rehabilitation; painting
146,000
(Base Project Allocation - $121,000)
(Design and Contingencies - $25,000)
(lv) Blue Knob State Park
(A) Reconstruct basketball courts, ball field; repair latrines; reconstruct campground/picnic play area and dining hall
183,000
(Base Project Allocation - $152,000)
(Design and Contingencies - $31,000)
(B) Rehabilitation of administration complex road system and other roads
299,000
(Base Project Allocation - $249,000)
(Design and Contingencies - $50,000)
(C) Open field management; repair park gates and kitchen equipment; insulate water heater; install water supply park pool/picnic area and run electric lines underground
112,000
(Base Project Allocation - $93,000)
(Design and Contingencies - $9,000)
(D) Rehabilitation of park facilities
1,080,000
(Base Project Allocation - $900,000)
(Design and Contingencies - $180,000)
(lvi) Buchanan's Birthplace State Park
(A) Replace restroom
23,000
(Base Project Allocation - $19,000)
(Design and Contingencies - $4,000)
(lvii) Caledonia State Park
(A) Repair pool and facilities
242,000
(Base Project Allocation - $201,000)
(Design and Contingencies - $41,000)
(B) Pave, paint and repair roads and parking lots; rehabilitation of park facilities
645,000
(Base Project Allocation - $537,000)
(Design and Contingencies - $108,000)
(C) Restore and paint restrooms and sewer lines; replace water heaters; repair pool facilities; repair well sewage plant
303,000
(Base Project Allocation - $252,000)
(Design and Contingencies - $51,000)
(D) Construct ice skating rink; rehabilitation of trail system, play field, campground; and replace food concession building
158,000
(Base Project Allocation - $131,000)
(Design and Contingencies - $27,000)
(E) Replace roofs; repair garage and amphitheater; install woodburner, furnace solar panels in residences; construct main gate; renovate office, group game area; expand storage facilities; paint buildings, bridges, gates, rails and fencing; install trails
273,000
(Base Project Allocation - $227,000)
(Design and Contingencies - $46,000)
(lviii) Canoe Creek State Park
(A) Replace maintenance building, lot curbs, warning markers, beach sand, siding on buildings and boat mooring walls; reseal walls; construct sidewalks; pave roads; rehabilitation of heating system
204,000
(Base Project Allocation - $170,000)
(Design and Contingencies - $34,000)
(B) Restore limestone kilns
120,000
(Base Project Allocation - $100,000)
(Design and Contingencies - $20,000)
(lix) Codorus State Park
(A) Rehabilitation of docks
1,250,000
(Base Project Allocation - $1,000,000)
(Design and Contingencies - $250,000)
(B) Pave roads and lots
114,000
(Base Project Allocation - $95,000)
(Design and Contingencies - $19,000)
(C) Paint water tank; rehabilitation of roads, pool tanks and filters; replace pool showers; construct barn and pool storage; electric lines, and install furnace; cedar siding for office
311,000
(Base Project Allocation - $259,000)
(Design and Contingencies - $52,000)
(lx) Colonel Denning State Park
(A) Rehabilitation of roads, lots, kitchen; construct maintenance building
238,000
(Base Project Allocation - $198,000)
(Design and Contingencies - $40,000)
(lxi) Cowan's Gap State Park
(A) Rehabilitation of parking lots
251,000
(Base Project Allocation - $209,000)
(Design and Contingencies - $42,000)
(B) Desilt lake
120,000
(Base Project Allocation - $100,000)
(Design and Contingencies - $20,000)
(C) Park rehabilitation
1,281,000
(Base Project Allocation - $1,067,000)
(Design and Contingencies - $214,000)
(D) Rehabilitation of charcoal units, storage buildings, restrooms, sewage plants; repair and paint restrooms; eliminate erosion in group tent area; expand storage
156,000
(Base Project Allocation - $130,000)
(Design and Contingencies - $26,000)
(lxii) Gifford Pinchot State Park
(A) Construct maintenance storage area
300,000
(Base Project Allocation - $250,000)
(Design and Contingencies - $50,000)
(B) Dredge lake
180,000
(Base Project Allocation - $150,000)
(Design and Contingencies - $30,000)
(C) Construct filter drying beds
120,000
(Base Project Allocation - $100,000)
(Design and Contingencies - $20,000)
(D) Pave roads; construct latrines
226,000
(Base Project Allocation - $188,000)
(Design and Contingencies - $38,000)
(E) Replace windows, furnace, latrines; extend sewage system; rehabilitation of gas valve; expand handicap access
246,000
(Base Project Allocation - $205,000)
(Design and Contingencies - $41,000)
(lxiii) Greenwood Furnace State Park
(A) Picnic and camping facilities
1,080,000
(Base Project Allocation - $900,000)
(Design and Contingencies - $180,000)
(B) Reconstruct furnace building
214,000
(Base Project Allocation - $178,000)
(Design and Contingencies - $36,000)
(C) Rehabilitation of park administration/support structures
1,080,000
(Base Project Allocation - $900,000)
(Design and Contingencies - $180,000)
(D) Rehabilitation of washhouse interior; sewage system extension; replace drinking fountains
214,000
(Base Project Allocation - $178,000)
(Design and Contingencies - $36,000)
(E) Pave Roads
188,000
(Base Project Allocation - $156,000)
(Design and Contingencies - $32,000)
(F) Rehabilitation of camping area, pavilions and structures
147,000
(Base Project Allocation - $122,000)
(Design and Contingencies - $25,000)
(G) Rehabilitation of buildings; replace playgrounds; construct barn; shoreline erosion control; replace siding and roofs
212,000
(Base Project Allocation - $176,000)
(Design and Contingencies - $36,000)
(lxiv) Little Buffalo State Park
(A) Repair water system; reroof bridge; replace fence, new carpet and wood burners; repair pool; enlarge visitors' center; replace grills; paving; painting water and sewer repairs; replace guide rail; repair boat docks
165,000
(Base Project Allocation - $137,000)
(Design and Contingencies - $28,000)
(B) Construct overnight facilities
300,000
(Base Project Allocation - $250,000)
(Design and Contingencies - $50,000)
(lxv) Mont Alto State Park
(A) Paint grills; stain foot bridges and bank pavilion; replace playground equipment; replace foot bridge; water and sewer repairs; landscaping; paint pavilion; rehabilitation of park facilities
182,000
(Base Project Allocation - $151,000)
(Design and Contingencies - $31,000)
(lxvi) Penn Roosevelt State Park
(A) Rehabilitation of monument, latrines, camp roads, pavilion, dam, day use and camp area; replace water system; install gates
294,000
(Base Project Allocation - $245,000)
(Design and Contingencies - $49,000)
(B) Dam and picnic facilities
720,000
(Base Project Allocation - $600,000)
(Design and Contingencies - $120,000)
(lxvii) Pine Grove Furnace State Park
(A) Construction of water and sewer systems
2,400,000
(Base Project Allocation - $2,000,000)
(Design and Contingencies - $400,000)
(B) Dredge lake
300,000
(Base Project Allocation - $250,000)
(Design and Contingencies - $50,000)
(C) Rehabilitation of camp store building
180,000
(Base Project Allocation - $150,000)
(Design and Contingencies - $30,000)
(D) Develop ice house, day-use area
150,000
(Base Project Allocation - $125,000)
(Design and Contingencies - $25,000)
(E) Repair mansion house; extend maintenance building; develop visitor center; construct pavilion; pole barn and fence; revamp buildings and gate key system; paint buildings; install storm windows
255,000
(Base Project Allocation - $212,000)
(Design and Contingencies - $43,000)
(F) Pave roads and parking lots; pave bicycle trail
123,000
(Base Project Allocation - $102,000)
(Design and Contingencies - $21,000)
(G) Water and sewer projects
147,000
(Base Project Allocation - $122,000)
(Design and Contingencies - $25,000)
(lxviii) Prince Gallitzin State Park
(A) Improve and renovate marina decks
881,000
(Base Project Allocation - $734,000)
(Design and Contingencies - $147,000)
(B) Reconstruct Beaver Valley marina
480,000
(Base Project Allocation - $400,000)
(Design and Contingencies - $80,000)
(C) Reconstruct washhouse
360,000
(Base Project Allocation - $300,000)
(Design and Contingencies - $60,000)
(D) Rehabilitate contact station
300,000
(Base Project Allocation - $250,000)
(Design and Contingencies - $50,000)
(E) Addition to maintenance shop
300,000
(Base Project Allocation - $250,000)
(Design and Contingencies - $50,000)
(F) Improve sewage treatment plant
240,000
(Base Project Allocation - $200,000)
(Design and Contingencies - $40,000)
(G) Stabilize shoreline
180,000
(Base Project Allocation - $150,000)
(Design and Contingencies - $30,000)
(H) Major rehabilitation of marina docks
480,000
(Base Project Allocation - $400,000)
(Design and Contingencies - $80,000)
(I) Road, trail and parking lot repair
177,000
(Base Project Allocation - $147,000)
(Design and Contingencies - $30,000)
(J) Stabilize lake shoreline; dredge and dam; replace siding and paint buildings; replace docks; replace beach sand; replace playground equipment; replace buoy floats
112,000
(Base Project Allocation - $93,000)
(Design and Contingencies - $19,000)
(K) Water and sewer projects
194,000
(Base Project Allocation - $161,000)
(Design and Contingencies - $33,000)
(L) Seal floors; replace lights; woodstove and fireplace insert; storm windows; replace locks; enclose office entrance; replace campsite markers; solar chamber; winterize main shop; rehabilitate amphitheater; replace furnace; replace fire rings and grills; rehabilitate fence; rehabilitate visitors center, repair roof; construct pedestrian walkway
150,000
(Base Project Allocation - $125,000)
(Design and Contingencies - $25,000)
(lxix) Region III Regional Office
(A) Paint office and two residences; office and equipment repairs
72,000
(Base Project Allocation - $60,000)
(Design and Contingencies - $12,000)
(lxx) Shawnee State Park
(A) Replace latrine; extend sewage
240,000
(Base Project Allocation - $200,000)
(Design and Contingencies - $40,000)
(B) Construct new office
180,000
(Base Project Allocation - $150,000)
(Design and Contingencies - $30,000)
(C) Replace pit latrines; water and sewage projects
224,000
(Base Project Allocation - $186,000)
(Design and Contingencies - $38,000)
(D) Rehabilitate boat rental and dock facilities
120,000
(Base Project Allocation - $100,000)
(Design and Contingencies - $20,000)
(E) Repair dam and roads; replace restroom partition; replace beach sand and beach drainage; paint building; furnace for residence
214,000
(Base Project Allocation - $178,000)
(Design and Contingencies - $36,000)
(lxxi) Susquehannock State Park
(A) Reconstruct Landis House
162,000
(Base Project Allocation - $135,000)
(Design and Contingencies - $27,000)
(lxxii) Trough Creek State Park
(A) Paving
410,000
(Base Project Allocation - $341,000)
(Design and Contingencies - $69,000)
(B) Construct three restrooms
120,000
(Base Project Allocation - $100,000)
(Design and Contingencies - $20,000)
(C) Rehabilitate iron furnace; restore railroad bridge; addition to maintenance building; replace playground equipment; re-roof residence
155,000
(Base Project Allocation - $129,000)
(Design and Contingencies - $26,000)
(D) Rehabilitate guardrail posts; install walls; replace restrooms; rehabilitate water system; replace windows; tractor shed addition, construct picnic pavilion
240,000
(Base Project Allocation - $200,000)
(Design and Contingencies - $40,000)
(lxxiii) Warrior's Path State Park
100,000
(A) Replace culvert and playground equipment, rehabilitation of water system, construct picnic latrine, paving
100,000
(Base Project Allocation - $83,000)
(Design and Contingencies - $17,000)
(lxxiv) Whipple Dam State Park
(A) Lake, picnic area
840,000
(Base Project Allocation - $700,000)
(Design and Contingencies - $140,000)
(B) Desilt lake
300,000
(Base Project Allocation - $250,000)
(Design and Contingencies - $50,000)
(C) Construct water system
180,000
(Base Project Allocation - $150,000)
(Design and Contingencies - $30,000)
(D) Rehabilitation of day use area
120,000
(Base Project Allocation - $100,000)
(Design and Contingencies - $20,000)
(E) Replace gate, parking lot wall, dressing stockade, rehabilitation of picnic areas, pavilions, refreshment building, ranger station cabin, bridge and latrines
263,000
(Base Project Allocation - $219,000)
(Design and Contingencies - $44,000)
(lxxv) Beltzville State Park
(A) Parking lot repair, bulletin board replacement, superintendent's residence repair, repair storage barn, repair sewer line, replace comfort station
219,000
(Base Project Allocation - $182,000)
(Design and Contingencies - $37,000)
(lxxvi) Big Pocono State Park
(A) Repair picnic areas, repair trails, repair and re-roof buildings, replace drain pipes; install guardrails and remove vegetation on scenic drive, rehabilitation of bus turnaround; boundary work
164,000
(Base Project Allocation - $136,000)
(Design and Contingencies - $28,000)
(lxxvii) Evansburg State Park
(A) Repair buildings
348,000
(Base Project Allocation - $290,000)
(Design and Contingencies - $58,000)
(B) Repair storage buildings, paint residence; demolish building, remove hazards, repair softball fields, repair visitors center, replace bridge, survey boundary, repair road, replace picnic facilities
209,000
(Base Project Allocation - $174,000)
(Design and Contingencies - $35,000)
(C) Paint comfort stations and office, repair water and waste systems, repair water tower
120,000
(Base Project Allocation - $100,000)
(Design and Contingencies - $20,000)
(lxxviii) Fort Washington State Park
(A) Repair park building and pave roads
54,000
(Base Project Allocation - $45,000)
(Design and Contingencies - $9,000)
(lxxix) Frances Slocum State Park
(A) Pool repairs, kitchen repairs, dam repairs, comfort station repair, pave roads and parking lots, repair maintenance building and office, repair sewage line and replace tank cover, repair signs and walkways
209,000
(Base Project Allocation - $174,000)
(Design and Contingencies - $35,000)
(lxxx) French Creek State Park
(A) Repair bathhouse, latrines and shower buildings
274,000
(Base Project Allocation - $228,000)
(Design and Contingencies - $46,000)
(B) Repair roads and parking lots
323,000
(Base Project Allocation - $269,000)
(Design and Contingencies - $54,000)
(C) Repair spillway, repair docks and repair boat mooring
312,000
(Base Project Allocation - $291,000)
(Design and Contingencies - $21,000)
((C) amended July 11, 1989, P.L.320, No.54)
(D) Build fencing, vehicle storage building, rebuild lodge, replace fire ring, repair and replace storage buildings, repair residences, campground renovations, repair cabin, boundary survey, safety rail, picnic area, lumber, gates, construct pavilions, repair quarry, repair playground and replace equipment, construct chapel and amphitheater, repair swimming pool
764,000
(Base Project Allocation - $636,000)
(Design and Contingencies - $128,000)
(lxxxi) Gouldsboro State Park
(A) Repair picnic areas and hiking trails, repair beach and swimming areas, repair roads and parking lot, repair various buildings, repair boat launch and watercraft rental facilities
162,000
(Base Project Allocation - $135,000)
(Design and Contingencies - $27,000)
(lxxxii) Hickory Run State Park
(A) Repair roads and parking lots
344,000
(Base Project Allocation - $286,000)
(Design and Contingencies - $58,000)
(B) Repair water treatment units, repair dams and drawdown gates, repair and paint showers, bathhouses and latrines, repair sewer lines, replace swimming pool filter, electric service to various buildings, repair campsites and picnic areas, paint maintenance building, repair workshop, repair trail, clear boundary lines
196,000
(Base Project Allocation - $163,000)
(Design and Contingencies - $33,000)
(lxxxiii) Lehigh Gorge State Park
(A) Historic hotel repair
300,000
(Base Project Allocation - $250,000)
(Design and Contingencies - $50,000)
(B) Repair main access road and install parking area
142,000
(Base Project Allocation - $118,000)
(Design and Contingencies - $24,000)
(C) Repair bridge, improve trail, repair/replace gates, repair water system
173,000
(Base Project Allocation - $144,000)
(Design and Contingencies - $29,000)
(lxxxiv) Locust Lake State Park
(A) Resurface road, repair washhouse, pave boat launch area, renovate playground equipment
146,000
(Base Project Allocation - $121,000)
(Design and Contingencies - $25,000)
(lxxxv) Marsh Creek State Park
(A) Repair and replace roofing, repair park office, install fire rings and grates, brushout aerial electric lines, repair swimming pool, install playground area
176,000
(Base Project Allocation - $146,000)
(Design and Contingencies - $30,000)
(lxxxvi) Memorial Lake State Park
(A) Pave parking lots, repair dam, construct deck and latrine, construct addition to maintenance building
208,000
(Base Project Allocation - $173,000)
(Design and Contingencies - $35,000)
(lxxxvii) Neshaminy State Park
(A) Pave parking areas, walkways and roads
270,000
(Base Project Allocation - $225,000)
(Design and Contingencies - $45,000)
(B) Repair swimming pool, repair shower and restroom plumbing, repair roofing, purchase schramm for bubbler, electrical maintenance, install fire hydrants and curb stops, repair barn and comfort station
183,000
(Base Project Allocation - $152,000)
(Design and Contingencies - $31,000)
(C) Re-deck full pier, replace gangways on piers
1,800,000
(Base Project Allocation - $1,500,000)
(Design and Contingencies - $300,000)
(lxxxviii) Nockamixon State Park
(A) Repair parking lot lines, road and parking lot repair
213,000
(Base Project Allocation - $177,000)
(Design and Contingencies - $36,000)
(B) Repair water tower, repair sewage system, repair sewage line infiltration, install skylights in comfort stations
160,000
(Base Project Allocation - $133,000)
(Design and Contingencies - $27,000)
(C) Replace floatation on marina docks
150,000
(Base Project Allocation - $125,000)
(Design and Contingencies - $25,000)
(D) Repair bulletin boards, repair pool, repair decking and siding, install gutters and drainage system, replace water lines, replace dead shrubbery and trees, demolish silo and stone walls, repair boundaries, pave bicycle trail, repair dam fence, replace locks throughout park, install chlorine gas detector
164,000
(Base Project Allocation - $136,000)
(Design and Contingencies - $28,000)
(E) Control shoreline erosion
360,000
(Base Project Allocation - $300,000)
(Design and Contingencies - $60,000)
(lxxxix) Promised Land State Park
(A) Road and parking lot rehabilitation, campground rehabilitation
143,000
(Base Project Allocation - $119,000)
(Design and Contingencies - $24,000)
(B) Playground equipment rehabilitation, boat mooring, rehabilitation of picnic area, hiking trails, family cabins, lodge, landscaping, paint water tower, rehabilitation of dump station tower
148,000
(Base Project Allocation - $123,000)
(Design and Contingencies - $25,000)
(xc) Ralph Stover State Park
(A) Footbridge, winterize cabins
14,000
(Base Project Allocation - $11,000)
(Design and Contingencies - $3,000)
(xci) Region IV Regional Office
(A) Replace boiler, porch steps, repair equipment, rehabilitation of boathouse, emergency contingency funds, vinyl siding
81,000
(Base Project Allocation - $67,000)
(Design and Contingencies - $14,000)
(xcii) Ricketts Glen State Park
(A) Paving and resurface roads, water tank fall prevention system
135,000
(Base Project Allocation - $112,000)
(Design and Contingencies - $23,000)
(xciii) Ridley Creek State Park
(A) Rehabilitation of historical structures
600,000
(Base Project Allocation - $500,000)
(Design and Contingencies - $100,000)
(B) Boundary survey
120,000
(Base Project Allocation - $100,000)
(Design and Contingencies - $20,000)
(C) Rehabilitation of electric and water at residence, rehabilitation comfort station, stone gutter, bridle trail and park office electric, gate replacement, park office heating system repair and pave parking lots
136,000
(Base Project Allocation - $113,000)
(Design and Contingencies - $23,000)
(xciv) Roosevelt State Park
(A) Masonry repair, pave maintenance area, aqueduct and bridge repair, re-roof buildings, towpath erosion control, parking lot drainage and modify heating system
108,000
(Base Project Allocation - $90,000)
(Design and Contingencies - $18,000)
(B) Bridge repairs
455,000
(Base Project Allocation - $379,000)
(Design and Contingencies - $76,000)
(xcv) Swatara State Park
(A) Furnace replacement, sewage system at maintenance building, vinyl siding
24,000
(Base Project Allocation - $20,000)
(Design and Contingencies - $4,000)
(xcvi) Tobyhanna State Park
(A) Rehabilitation of boat mooring area, rehabilitation of beach area, rehabilitation of watercraft rental docks, increase parking, launching and mooring
134,000
(Base Project Allocation - $111,000)
(Design and Contingencies - $23,000)
(B) Road repairs
132,000
(Base Project Allocation - $110,000)
(Design and Contingencies - $22,000)
(C) Residence repairs, boundary line work, rehabilitation of picnic areas, rehabilitation of trails, erosion control, repair buildings and dam, rehabilitation of campsites, replace heating system, install new gas and oil tanks, install security fence, relocate loading ramp, rehabilitation of water system and construct storage areas
269,000
(Base Project Allocation - $224,000)
(Design and Contingencies - $45,000)
(xcvii) Tuscarora State Park
(A) Renovate road, pave boat launch area, replace showers, renovate residence, rehabilitation of beach, roof replacement, renovate office parking lot
186,000
(Base Project Allocation - $155,000)
(Design and Contingencies - $31,000)
(xcviii) Tyler State Park
(A) Resurface bike trail, repoint stone barn, dam repair, roof and floor repair, road and parking lot repair, rehabilitation of docks, replace comfort station partitions
148,000
(Base Project Allocation - $123,000)
(Design and Contingencies - $25,000)
(xcix) White Clay Creek State Park
(A) Rehabilitation of residence, replace windows, renovate water system, paint exterior of residence
16,000
(Base Project Allocation - $13,000)
(Design and Contingencies - $3,000)
(c) World's End State Park
(A) Rehabilitation of maintenance building
300,000
(Base Project Allocation - $250,000)
(Design and Contingencies - $50,000)
(B) Rehabilitation of office
180,000
(Base Project Allocation - $150,000)
(Design and Contingencies - $30,000)
(C) Replace beach dressing stockade
180,000
(Base Project Allocation - $150,000)
(Design and Contingencies - $30,000)
(D) Road repair and paving
419,000
(Base Project Allocation - $349,000)
(Design and Contingencies - $70,000)
(E) Cabin rehabilitation, pavilion repair, rehabilitation of day-use area, rehabilitation of concession stand
140,000
(Base Project Allocation - $116,000)
(Design and Contingencies - $24,000)
(F) Latrine repair and replacement
312,000
(Base Project Allocation - $260,000)
(Design and Contingencies - $52,000)
(ci) EEI Environmental Education Center
(A) Flagpole, visitor center development
50,000
(Base Project Allocation - $41,000)
(Design and Contingencies - $9,000)
(cii) Jacobsburg Environmental Education Center
(A) Replace roof, residence repair, rehabilitation of maintenance and storage buildings
22,000
(Base Project Allocation - $18,000)
(Design and Contingencies - $4,000)
(ciii) Jennings Environmental Education Center
(A) Center extension
180,000
(Base Project Allocation - $150,000)
(Design and Contingencies - $30,000)
(B) Road and parking repairs, entrance walk and lighting, maintenance building extension, storage shed, boundary survey, water systems, fuel tanks, loading ramp, WTS visitor integration system
225,000
(Base Project Allocation - $187,000)
(Design and Contingencies - $38,000)
(civ) Kings Gap Environmental Education Center
(A) Renovate carriage house
180,000
(Base Project Allocation - $150,000)
(Design and Contingencies - $30,000)
(B) Replace water tower
300,000
(Base Project Allocation - $250,000)
(Design and Contingencies - $50,000)
(C) Replace heating system, painting, plumbing and curtains, paving
168,000
(Base Project Allocation - $140,000)
(Design and Contingencies - $28,000)
(cv) Nolde Forest Environmental Education Center
(A) Convert barn
120,000
(Base Project Allocation - $100,000)
(Design and Contingencies - $20,000)
(B) Mansion repairs, handicapped walk, road repairs, painting, rebuild stone walls, dam repair, replace roof
324,000
(Base Project Allocation - $270,000)
(Design and Contingencies - $54,000)
(cvi) Delaware Canal Improvement Program
(A) Repair locks, aqueducts, stop and waste gates, overflows, bridge crossing and canal wall/liner dredging
38,280,000
(Base Project Allocation - $31,900,000)
(Design and Contingencies - $6,380,000)
(cvii) State Park Bridge Repair Program
(A) Bendigo State Park
36,000
(Base Project Allocation - $30,000)
(Design and Contingencies - $6,000)
(B) Hills Creek State Park
86,000
(Base Project Allocation - $71,000)
(Design and Contingencies - $15,000)
(C) Hyner Run State Park
195,000
(Base Project Allocation - $162,000)
(Design and Contingencies - $33,000)
(D) Little Pine State Park
339,000
(Base Project Allocation - $282,000)
(Design and Contingencies - $57,000)
(E) Parker Dam State Park
159,000
(Base Project Allocation - $132,000)
(Design and Contingencies - $27,000)
(F) Poe Valley State Park
12,000
(Base Project Allocation - $10,000)
(Design and Contingencies - $2,000)
(G) R. B. Winter State Park
80,000
(Base Project Allocation - $66,000)
(Design and Contingencies - $14,000)
(H) Reed's Gap State Park
141,000
(Base Project Allocation - $117,000)
(Design and Contingencies - $24,000)
(I) Reed's Gap State Park
40,000
(Base Project Allocation - $33,000)
(Design and Contingencies - $7,000)
(J) Sinnemahoning State Park
87,000
(Base Project Allocation - $72,000)
(Design and Contingencies - $15,000)
(K) Sizerville State Park
62,000
(Base Project Allocation - $51,000)
(Design and Contingencies - $11,000)
(L) Sizerville State Park
72,000
(Base Project Allocation - $60,000)
(Design and Contingencies - $12,000)
(M) Clear Creek State Park
105,000
(Base Project Allocation - $87,000)
(Design and Contingencies - $18,000)
(N) Cook Forest State Park
190,000
(Base Project Allocation - $158,000)
(Design and Contingencies - $32,000)
(O) Keystone State Park
69,000
(Base Project Allocation - $57,000)
(Design and Contingencies - $12,000)
(P) Kooser State Park
84,000
(Base Project Allocation - $70,000)
(Design and Contingencies - $14,000)
(Q) Kooser State Park
113,000
(Base Project Allocation - $94,000)
(Design and Contingencies - $19,000)
(R) Laurel Hill State Park
(Base Project Allocation - $125,000)
(Design and Contingencies - $25,000)
(S) Laurel Hill State Park
112,000
(Base Project Allocation - $94,000)
(Design and Contingencies - $18,000)
(T) Laurel Hill State Park
158,000
(Base Project Allocation - $131,000)
(Design and Contingencies - $27,000)
(U) Laurel Hill State Park
201,000
(Base Project Allocation - $167,000)
(Design and Contingencies - $34,000)
(V) Laurel Hill State Park
112,000
(Base Project Allocation - $93,000)
(Design and Contingencies - $19,000)
(W) Linn Run State Park
128,000
(Base Project Allocation - $106,000)
(Design and Contingencies - $22,000)
(X) Linn Run State Park
122,000
(Base Project Allocation - $101,000)
(Design and Contingencies - $21,000)
(Y) Ohiopyle State Park
212,000
(Base Project Allocation - $176,000)
(Design and Contingencies - $36,000)
(Z) Raccoon Creek State Park
81,000
(Base Project Allocation - $67,000)
(Design and Contingencies - $14,000)
(AA) Raccoon Creek State Park
182,000
(Base Project Allocation - $151,000)
(Design and Contingencies - $31,000)
(BB) Raccoon Creek State Park
124,000
(Base Project Allocation - $103,000)
(Design and Contingencies - $21,000)
(CC) Raccoon Creek State Park
64,000
(Base Project Allocation - $53,000)
(Design and Contingencies - $11,000)
(DD) Raccoon Creek State Park
132,000
(Base Project Allocation - $110,000)
(Design and Contingencies - $22,000)
(EE) Raccoon Creek State Park
102,000
(Base Project Allocation - $85,000)
(Design and Contingencies - $17,000)
(FF) Raccoon Creek State Park
69,000
(Base Project Allocation - $57,000)
(Design and Contingencies - $12,000)
(GG) Raccoon Creek State Park
121,000
(Base Project Allocation - $101,000)
(Design and Contingencies - $20,000)
(HH) Raccoon Creek State Park
122,000
(Base Project Allocation - $101,000)
(Design and Contingencies - $21,000)
(II) Raccoon Creek State Park
107,000
(Base Project Allocation - $89,000)
(Design and Contingencies - $18,000)
(JJ) Ryerson Station State Park
408,000
(Base Project Allocation - $340,000)
(Design and Contingencies - $68,000)
(KK) Blue Knob State Park
60,000
(Base Project Allocation - $50,000)
(Design and Contingencies - $10,000)
(LL) Blue Knob State Park
48,000
(Base Project Allocation - $40,000)
(Design and Contingencies - $8,000)
(MM) Blue Knob State Park
48,000
(Base Project Allocation - $40,000)
(Design and Contingencies - $8,000)
(NN) Blue Knob State Park
90,000
(Base Project Allocation - $75,000)
(Design and Contingencies - $15,000)
(OO) Blue Knob State Park
54,000
(Base Project Allocation - $45,000)
(Design and Contingencies - $9,000)
(PP) Blue Knob State Park
48,000
(Base Project Allocation - $40,000)
(Design and Contingencies - $8,000)
(QQ) Blue Knob State Park
48,000
(Base Project Allocation - $40,000)
(Design and Contingencies - $8,000)
(RR) Blue Knob State Park
66,000
(Base Project Allocation - $55,000)
(Design and Contingencies - $11,000)
(SS) Blue Knob State Park
60,000
(Base Project Allocation - $50,000)
(Design and Contingencies - $10,000)
(TT) Blue Knob State Park
54,000
(Base Project Allocation - $45,000)
(Design and Contingencies - $9,000)
(UU) Blue Knob State Park
90,000
(Base Project Allocation - $75,000)
(Design and Contingencies - $15,000)
(VV) Canoe Creek State Park
72,000
(Base Project Allocation - $60,000)
(Design and Contingencies - $12,000)
(WW) Colonel Denning State Park
90,000
(Base Project Allocation - $75,000)
(Design and Contingencies - $15,000)
(XX) Cowan's Gap State Park
72,000
(Base Project Allocation - $60,000)
(Design and Contingencies - $12,000)
(YY) Fowlers Hollow State Park
108,000
(Base Project Allocation - $90,000)
(Design and Contingencies - $18,000)
(ZZ) Fowlers Hollow State Park
78,000
(Base Project Allocation - $65,000)
(Design and Contingencies - $13,000)
(AAA) King's Gap Environmental Education Center
54,000
(Base Project Allocation - $45,000)
(Design and Contingencies - $9,000)
(BBB) King's Gap Environmental Education Center
66,000
(Base Project Allocation - $55,000)
(Design and Contingencies - $11,000)
(CCC) King's Gap Environmental Education Center
66,000
(Base Project Allocation - $55,000)
(Design and Contingencies - $11,000)
(DDD) Penn-Roosevelt State Park
36,000
(Base Project Allocation - $30,000)
(Design and Contingencies - $6,000)
(EEE) Pine Grove Furnace State Park
77,000
(Base Project Allocation - $65,000)
(Design and Contingencies - $12,000)
(FFF) Prince Gallitzin State Park
90,000
(Base Project Allocation - $75,000)
(Design and Contingencies - $15,000)
(GGG) Shawnee State Park
226,000
(Base Project Allocation - $188,000)
(Design and Contingencies - $38,000)
(HHH) Shawnee State Park
89,000
(Base Project Allocation - $74,000)
(Design and Contingencies - $15,000)
(III) Shawnee State Park
(Base Project Allocation - $188,000)
(Design and Contingencies - $38,000)
(JJJ) Shawnee State Park
60,000
(Base Project Allocation - $50,000)
(Design and Contingencies - $10,000)
(KKK) Shawnee State Park
48,000
(Base Project Allocation - $40,000)
(Design and Contingencies - $8,000)
(LLL) Trough State Park
300,000
(Base Project Allocation - $250,000)
(Design and Contingencies - $50,000)
(MMM) Trough State Park
36,000
(Base Project Allocation - $30,000)
(Design and Contingencies - $6,000)
(NNN) Trough State Park
270,000
(Base Project Allocation - $225,000)
(Design and Contingencies - $45,000)
(OOO) Whipple Dam State Park
72,000
(Base Project Allocation - $60,000)
(Design and Contingencies - $12,000)
(PPP) Bruce Lake State Park
150,000
(Base Project Allocation - $125,000)
(Design and Contingencies - $25,000)
(QQQ) Bruce Lake State Park
60,000
(Base Project Allocation - $50,000)
(Design and Contingencies - $10,000)
(RRR) French Creek State Park
66,000
(Base Project Allocation - $55,000)
(Design and Contingencies - $11,000)
(SSS) French Creek State Park
66,000
(Base Project Allocation - $55,000)
(Design and Contingencies - $11,000)
(TTT) French Creek State Park
70,000
(Base Project Allocation - $58,000)
(Design and Contingencies - $12,000)
(UUU) Hickory Run State Park
144,000
(Base Project Allocation - $120,000)
(Design and Contingencies - $24,000)
(VVV) Hickory Run State Park
26,000
(Base Project Allocation - $21,000)
(Design and Contingencies - $5,000)
(WWW) Hickory Run State Park
110,000
(Base Project Allocation - $91,000)
(Design and Contingencies - $19,000)
(XXX) Hickory Run State Park
114,000
(Base Project Allocation - $95,000)
(Design and Contingencies - $19,000)
(YYY) Hickory Run State Park
114,000
(Base Project Allocation - $95,000)
(Design and Contingencies - $19,000)
(ZZZ) Hickory Run State Park
114,000
(Base Project Allocation - $95,000)
(Design and Contingencies - $19,000)
(AAAA) Hickory Run State Park
104,000
(Base Project Allocation - $86,000)
(Design and Contingencies - $18,000)
(BBBB) Nockamixon State Park
44,000
(Base Project Allocation - $36,000)
(Design and Contingencies - $8,000)
(CCCC) Nolde Forest Environmental Education Center
54,000
(Base Project Allocation - $45,000)
(Design and Contingencies - $9,000)
(DDDD) Nolde Forest Environmental Education Center
72,000
(Base Project Allocation - $60,000)
(Design and Contingencies - $12,000)
(EEEE) Nolde Forest Environmental Education Center
54,000
(Base Project Allocation - $45,000)
(Design and Contingencies - $9,000)
(FFFF) Nolde Forest Environmental Education Center
30,000
(Base Project Allocation - $25,000)
(Design and Contingencies - $5,000)
(GGGG) Nolde Forest Environmental Education Center
54,000
(Base Project Allocation - $45,000)
(Design and Contingencies - $9,000)
(HHHH) Nolde Forest Environmental Education Center
54,000
(Base Project Allocation - $45,000)
(Design and Contingencies - $9,000)
(IIII) Nolde Forest Environmental Education Center
24,000
(Base Project Allocation - $20,000)
(Design and Contingencies - $4,000)
(JJJJ) Promised Land State Park
406,000
(Base Project Allocation - $338,000)
(Design and Contingencies - $68,000)
(KKKK) Promised Land State Park
118,000
(Base Project Allocation - $98,000)
(Design and Contingencies - $20,000)
(LLLL) Promised Land State Park
88,000
(Base Project Allocation - $73,000)
(Design and Contingencies - $15,000)
(MMMM) Ralph Stover State Park
90,000
(Base Project Allocation - $75,000)
(Design and Contingencies - $15,000)
(NNNN) Ricketts Glen State Park
72,000
(Base Project Allocation - $60,000)
(Design and Contingencies - $12,000)
(OOOO) Ridley Creek State Park
92,000
(Base Project Allocation - $76,000)
(Design and Contingencies - $16,000)
(PPPP) Ridley Creek State Park
240,000
(Base Project Allocation - $200,000)
(Design and Contingencies - $40,000)
(QQQQ) Tyler State Park
14,000
(Base Project Allocation - $11,000)
(Design and Contingencies - $3,000)
(RRRR) Tyler State Park
108,000
(Base Project Allocation - $90,000)
(Design and Contingencies - $18,000)
(SSSS) Tyler State Park
42,000
(Base Project Allocation - $35,000)
(Design and Contingencies - $7,000)
(TTTT) Tyler State Park
60,000
(Base Project Allocation - $50,000)
(Design and Contingencies - $10,000)
(UUUU) Tyler State Park
90,000
(Base Project Allocation - $75,000)
(Design and Contingencies - $15,000)
(VVVV) Tyler State Park
60,000
(Base Project Allocation - $50,000)
(Design and Contingencies - $10,000)
(WWWW) Tyler State Park
72,000
(Base Project Allocation - $60,000)
(Design and Contingencies - $12,000)
(XXXX) Tyler State Park
60,000
(Base Project Allocation - $50,000)
(Design and Contingencies - $10,000)
(YYYY) Roosevelt State Park
54,000
(Base Project Allocation - $45,000)
(Design and Contingencies - $9,000)
(ZZZZ) Roosevelt State Park
153,000
(Base Project Allocation - $127,000)
(Design and Contingencies - $26,000)
(A5) Roosevelt State Park
120,000
(Base Project Allocation - $100,000)
(Design and Contingencies - $20,000)
(B5) Roosevelt State Park
144,000
(Base Project Allocation - $120,000)
(Design and Contingencies - $24,000)
(C5) Roosevelt State Park
46,000
(Base Project Allocation - $38,000)
(Design and Contingencies - $8,000)
(D5) Roosevelt State Park
24,000
(Base Project Allocation - $20,000)
(Design and Contingencies - $4,000)
(E5) Roosevelt State Park
143,000
(Base Project Allocation - $119,000)
(Design and Contingencies - $24,000)
(F5) Roosevelt State Park
131,000
(Base Project Allocation - $109,000)
(Design and Contingencies - $22,000)
(G5) Roosevelt State Park
34,000
(Base Project Allocation - $28,000)
(Design and Contingencies - $6,000)
(H5) Roosevelt State Park
80,000
(Base Project Allocation - $66,000)
(Design and Contingencies - $14,000)
(I5) Roosevelt State Park
528,000
(Base Project Allocation - $440,000)
(Design and Contingencies - $88,000)
(J5) Roosevelt State Park
51,000
(Base Project Allocation - $42,000)
(Design and Contingencies - $9,000)
(K5) Roosevelt State Park
158,000
(Base Project Allocation - $131,000)
(Design and Contingencies - $27,000)
(L5) Roosevelt State Park
158,000
(Base Project Allocation - $131,000)
(Design and Contingencies - $27,000)
(M5) Roosevelt State Park
158,000
(Base Project Allocation - $131,000)
(Design and Contingencies - $27,000)
(N5) Roosevelt State Park
158,000
(Base Project Allocation - $131,000)
(Design and Contingencies - $27,000)
(O5) Roosevelt State Park
138,000
(Base Project Allocation - $115,000)
(Design and Contingencies - $23,000)
(P5) Roosevelt State Park
163,000
(Base Project Allocation - $136,000)
(Design and Contingencies - $27,000)
(Q5) Roosevelt State Park
144,000
(Base Project Allocation - $120,000)
(Design and Contingencies - $24,000)
(R5) Roosevelt State Park
26,000
(Base Project Allocation - $21,000)
(Design and Contingencies - $5,000)
(S5) Roosevelt State Park
131,000
(Base Project Allocation - $109,000)
(Design and Contingencies - $22,000)
(T5) Roosevelt State Park
56,000
(Base Project Allocation - $46,000)
(Design and Contingencies - $10,000)
(U5) Roosevelt State Park
53,000
(Base Project Allocation - $44,000)
(Design and Contingencies - $9,000)
(V5) Roosevelt State Park
124,000
(Base Project Allocation - $103,000)
(Design and Contingencies - $21,000)
(W5) Roosevelt State Park
153,000
(Base Project Allocation - $127,000)
(Design and Contingencies - $26,000)
(X5) Roosevelt State Park
54,000
(Base Project Allocation - $45,000)
(Design and Contingencies - $9,000)
(Y5) Roosevelt State Park
138,000
(Base Project Allocation - $115,000)
(Design and Contingencies - $23,000)
(Z5) Roosevelt State Park
129,000
(Base Project Allocation - $107,000)
(Design and Contingencies - $22,000)
(A6) Roosevelt State Park
114,000
(Base Project Allocation - $95,000)
(Design and Contingencies - $19,000)
(B6) Roosevelt State Park
110,000
(Base Project Allocation - $91,000)
(Design and Contingencies - $19,000)
(C6) Roosevelt State Park
106,000
(Base Project Allocation - $88,000)
(Design and Contingencies - $18,000)
(D6) Roosevelt State Park
138,000
(Base Project Allocation - $115,000)
(Design and Contingencies - $23,000)
(E6) Roosevelt State Park
138,000
(Base Project Allocation - $115,000)
(Design and Contingencies - $23,000)
(F6) Roosevelt State Park
110,000
(Base Project Allocation - $91,000)
(Design and Contingencies - $19,000)
(G6) Roosevelt State Park
30,000
(Base Project Allocation - $25,000)
(Design and Contingencies - $5,000)
(H6) Roosevelt State Park
29,000
(Base Project Allocation - $24,000)
(Design and Contingencies - $5,000)
(I6) Roosevelt State Park
131,000
(Base Project Allocation - $109,000)
(Design and Contingencies - $22,000)
(J6) Roosevelt State Park
131,000
(Base Project Allocation - $109,000)
(Design and Contingencies - $22,000)
(K6) Roosevelt State Park
131,000
(Base Project Allocation - $109,000)
(Design and Contingencies - $22,000)
(L6) Roosevelt State Park
14,000
(Base Project Allocation - $11,000)
(Design and Contingencies - $3,000)
(cviii) Codorus State Park
(A) Repair and improvement of the docking system
1,800,000
(Base Project Allocation - $1,500,000)
(Design and Contingencies - $300,000)
(cix) Cook Forest State Park
(A) Renovation and construction of Saw Mill Center
1,500,000
(Base Project Allocation - $1,500,000)
(cx) French Creek State Park
(A) Additional funds for DGS 111-4, spillway modifications, Hopewell Dam
43,000
(Base Project Allocation - $36,000)
(Design and Contingencies - $7,000)
(cxi) Hickory Run State Park
(A) Replace bridges
264,000
(Base Project Allocation - $220,000)
(Design and Contingencies - $44,000)
(cxii) Kettle Creek State Park
(A) Rehabilitation of park facilities, including five comfort stations
1,420,000
(Base Project Allocation - $1,200,000)
(Design and Contingencies - $220,000)
(cxiii) Keystone State Park
(A) Renovation of facilities
1,080,000
(Base Project Allocation - $900,000)
(Design and Contingencies - $180,000)
(cxiv) Kooser State Park
(A) Reconstruct tent and trailer camping area, road and sites
420,000
(Base Project Allocation - $350,000)
(Design and Contingencies - $70,000)
(B) Construction of a new maintenance center, washhouses for the overnight areas, sewer and other utility connections and extensions, and sewage treatment plant provisions
960,000
(Base Project Allocation - $800,000)
(Design and Contingencies - $160,000)
(cxv) Laurel Hill State Park
(A) Additional funds for DGS 145-6, spillway modifications
660,000
(Base Project Allocation - $550,000)
(Design and Contingencies - $110,000)
(cxvi) Parker Dam State Park
(A) Rehabilitate road and drainage - main park road
264,000
(Base Project Allocation - $220,000)
(Design and Contingencies - $44,000)
(cxvii) Presque Isle State Park
(A) Additional funds for Project No. DGS 163-21; beach protection and beach nourishment
4,833,000
(Base Project Allocation - $4,394,000)
(Design and Contingencies - $439,000)
(B) Renovation of marina
1,154,000
(Base Project Allocation - $962,000)
(Design and Contingencies - $192,000)
(C) Storm damage and beach protection project
2,875,000
(Base Project Allocation - $2,725,000)
(Design and Contingencies - $150,000)
(D) The Department of Environmental Resources, acting for and in the name of the Commonwealth of Pennsylvania, is authorized to agree to hold and save the United States of America free from damages due to construction, operation and maintenance of the shoreline protection project at Presque Isle Peninsula, Erie, Pennsylvania, as authorized by section 501(a) of the Water Resources Development Act of 1986 (Public Law 99-662, 100 Stat. 4133), except for damages due to the fault or negligence of the United States of America or its contractors.
(cxviii) Pymatuning State Park
(A) Additional funds for DGS 103-4, Linesville boat livery facilities, including parking, paving, dockage and other improvements
800,000
(Base Project Allocation - $667,000)
(Design and Contingencies - $133,000)
(B) Repair and rehabilitation of the causeway over Pymatuning Lake
1,648,000
(Base Project Allocation - $1,598,000)
(Design and Contingencies - $50,000)
(cxix) Roosevelt State Park
(A) Improvement program for canal structure in order to return and maintain water in the Delaware Canal
12,785,000
(Base Project Allocation - $12,785,000)
(B) Restoration of the Delaware Canal in Tullytown Borough
3,000,000
(Base Project Allocation - $3,000,000)
(C) Tohickon Creek aqueduct repairs
500,000
(Base Project Allocation - $417,000)
(Design and Contingencies - $83,000)
(D) Paunacoussing Creek aqueduct wall, wall between Point Pleasant and Lumberville and rebuilding of Lock No.17 at Treasure Island
2,000,000
(Base Project Allocation - $1,667,000)
(Design and Contingencies - $333,000)
(E) Yardley Aqueduct at Brock's Creek, MP 14, rehabilitate aqueduct and adjacent walls
250,000
(Base Project Allocation - $209,000)
(Design and Contingencies - $41,000)
(F) Rehabilitate Borden's Lock (Lock No.7)
1,100,000
(Base Project Allocation - $917,000)
(Design and Contingencies - $183,000)
(G) Repairs, stonework, waste gate repairs, wall repair and towpath stabilization
120,000
(Base Project Allocation - $100,000)
(Design and Contingencies - $20,000)
(H) Rehabilitate Tinicum aqueduct and Erwinna bridge
1,500,000
(Base Project Allocation - $1,250,000)
(Design and Contingencies - $250,000)
(cxx) Ryerson Station State Park
(A) Bridge
276,000
(Base Project Allocation - $230,000)
(Design and Contingencies - $46,000)
(cxxi) Salt Springs State Park
(A) Rehabilitation of park facilities including construction of additional pavilion and restrooms
150,000
(Base Project Allocation - $150,000)
(cxxii) Shawnee State Park
(A) Replace bridges - main park road
528,000
(Base Project Allocation - $440,000)
(Design and Contingencies - $88,000)
(B) Replace bridge decks, walkways, pit latrines; improve dock
1,300,000
(Base Project Allocation - $1,300,000)
(cxxiii) Sinnemahoning State Park
(A) Rehabilitation of gate and outlet tunnel - George B. Stevenson Dam
1,100,000
(Base Project Allocation - $917,000)
(Design and Contingencies - $183,000)
(cxxiv) Susquehanna State Park
(A) Provide riprap and filter blanket, rehabilitate existing boat launching ramp and install new courtesy dock
240,000
(Base Project Allocation - $200,000)
(Design and Contingencies - $40,000)
((cxxiv) amended July 11, 1989 P.L.320, No.54)
(cxxv) White Clay Creek Preserve
(A) Land acquisition for the White Clay Creek Preserve
500,000
(Base Project Allocation - $500,000)
(cxxvi) Yellow Creek State Park
(A) Construction of a marina on the north shore of the lake
2,160,000
(Base Project Allocation - $1,800,000)
(Design and Contingencies - $360,000)
(B) Construction of additional campsites
3,360,000
(Base Project Allocation - $2,800,000)
(Design and Contingencies - $560,000)
(cxxvii) Bicycle trail
(A) Acquisition, construction and improvement of a bicycle trail running from Ohiopyle Borough to the City of Connellsville
500,000
(Base Project Allocation - $500,000)
(cxxviii) Ricketts Glen State Park
(A) Rehabilitation of park facilities, including camp site development
200,000
(Base Project Allocation - $200,000)
(cxxix) Forest District No. 4
(A) Improvement to Laurel Summit Road
500,000
(Base Project Allocation - $450,000)
(Design and Contingencies - $50,000)
(cxxx) Forest District No. 5
(A) Rehabilitate bridges
134,000
(Base Project Allocation - $112,000)
(Design and Contingencies - $22,000)
(cxxxi) Forest District No. 7
(A) Rehabilitate bridges
138,000
(Base Project Allocation - $115,000)
(Design and Contingencies - $23,000)
(cxxxii) Forest District No. 8
(A) Rehabilitation and repair of Greens Valley Road in Spring Township
100,000
(Base Project Allocation - $100,000)
(cxxxiii) Forest District No. 9
(A) FM radio system
386,000
(Base Project Allocation - $322,000)
(Design and Contingencies - $64,000)
(cxxxiv) Forest District No. 10
(A) Rehabilitation and repair of the Kato Orviston Road
58,000
(Base Project Allocation - $58,000)
(B) Rehabilitate bridges
113,000
(Base Project Allocation - $94,000)
(Design and Contingencies - $19,000)
(cxxxv) Forest District No. 20
(A) FM radio system
386,000
(Base Project Allocation - $322,000)
(Design and Contingencies - $64,000)
(cxxxvi) Allegheny County
(A) Additional funds to restore Pine Creek Watershed to pre-May 1986 condition
3,000,000
(Base Project Allocation - $3,000,000)
(B) Construction of eight storm water detention facilities
1,520,000
(Base Project Allocation - $1,520,000)
(C) Relocation of utility lines in connection with the Pine Creek Flood Control Project
100,000
(Base Project Allocation - $100,000)
(D) Completion of the Gregg Lane Storm Sewer Project
60,000
(Base Project Allocation - $60,000)
(E) Completion of the Main Street drainage plan in Findley Township
49,000
(Base Project Allocation - $49,000)
(F) Correction of flooding problem in the Whiskey Run Basin of Chartiers Creek in Scott Township
150,000
(Base Project Allocation - $125,000)
(Design and Contingencies - $25,000)
(G) Borough of Castle Shannon - Replacement of entire storm water collection system
344,000
(Base Project Allocation - $287,000)
(Design and Contingencies - $57,000)
(H) Borough of Whitehall - Construction of storm water sewer along Barlind Drive from Lot 35 to Provost Road and along Provost Road to Lawnview Drive. Install storm water inlet on Lot 20 on Rolling Hills Road; install two new inlets and lower existing inlets on Echo Glen Drive at 4607 - 4611 and 4615; replace line on Felix Drive; raise headwall at the terminus of Maryal Drive; correct flood condition at 5291 Spring Valley Drive; correct storm water problem at 4731 Brownsville Road; correct flooding problem on Heinen Street; correct flooding problem on Skyline Drive; correct flooding on Doverdell Drive; correct flooding on Oak Ridge Drive; install manhole on South Passage Drive
385,000
(Base Project Allocation - $321,000)
(Design and Contingencies - $64,000)
(I) Borough of Bethel Park - Installation of 100-foot boring beneath the Port Authority transit trolley tracks to correct basement flooding
120,000
(Base Project Allocation - $100,000)
(Design and Contingencies - $20,000)
(J) Upgrade flood control systems in McCandless Township
120,000
(Base Project Allocation - $100,000)
(Design and Contingencies - $20,000)
(K) Flood prevention project on Little Bull Creek, Harrison Township
1,000,000
(Base Project Allocation - $1,000,000)
(L) Flood prevention project on Bull Creek, Fawn Township
1,000,000
(Base Project Allocation - $1,000,000)
(M) Coles Road storm sewer project
48,000
(Base Project Allocation - $48,000)
(N) Removal of sand bar in Allegheny River
600,000
(Base Project Allocation - $600,000)
(O) Deer Creek Watershed project
300,000
(Base Project Allocation - $300,000)
(P) Flood protection for Saw Mill Run
1,198,000
(Base Project Allocation - $1,089,000)
(Design and Contingencies - $109,000)
(Q) Engineering and piping for Lick Run Creek
800,000
(Base Project Allocation - $600,000)
(Design and Contingencies - $200,000)
(R) Baldwin Borough, correction of flood problem at Lick Run Creek
800,000
(Base Project Allocation - $800,000)
(S) City of Pittsburgh, 31st Ward - Dredging and repair of flood control structures in Streets Run and Glass Run Creeks, including construction of retaining flood walls and sewer backflow preventers
5,000,000
(Base Project Allocation - $5,000,000)
(T) Flood Prevention Project on Lick Run Creek, Baldwin Borough - engineering and piping
960,000
(Base Project Allocation - $800,000)
(Design and Contingencies - $160,000)
(cxxxvii) Beaver County
(A) Virginia Avenue storm sewer reconstruction in the Borough of Rochester
294,000
(Base Project Allocation - $262,000)
(Design and Contingencies - $32,000)
(B) Railroad Street storm sewer in the Borough of Rochester
101,000
(Base Project Allocation - $89,000)
(Design and Contingencies - $12,000)
(C) Reconstruction of approximately 50 storm water inlets in the Borough of Freedom
260,000
(Base Project Allocation - $225,000)
(Design and Contingencies - $35,000)
(D) Construction of Ranney water well in Aliquippa Borough
1,000,000
(Base Project Allocation - $1,000,000)
(E) Extension of sewer line in Patterson Township
3,000,000
(Base Project Allocation - $3,000,000)
(F) Construction of sewer line to Aliquippa Airport
200,000
(Base Project Allocation - $200,000)
(cxxxviii) Berks County
(A) Rehabilitation of flood damaged areas of Birdsboro Borough
(I) Repairs to Water Street from Main to Beacon
250,000
(Base Project Allocation - $250,000)
(II) Repairs to Jackson Street
10,000
(Base Project Allocation - $10,000)
(III) Repairs to Old River Road
5,000
(Base Project Allocation - $5,000)
(IV) Repairs to the borough sewer system
150,000
(Base Project Allocation - $150,000)
(V) Repairs to the borough water system
150,000
(Base Project Allocation - $150,000)
(VI) Repairs to the Rustic Recreation Area
110,000
(Base Project Allocation - $110,000)
(VII) Repairs to the Water Street Recreation Area
10,000
(Base Project Allocation - $10,000)
(B) Bridge replacement and erosion control project on Topton Creek
2,500,000
(Base Project Allocation - $2,500,000)
(C) Repair of Trout Run Reservoir in Boyertown Borough
450,000
(Base Project Allocation - $450,000)
(D) Improvements to Boyertown Borough Wastewater Treatment Plant
350,000
(Base Project Allocation - $350,000)
(E) Antietam Creek Flood Control Project in Exeter Township
165,000
(Base Project Allocation - $150,000)
(Design and Contingencies - $15,000)
(F) Toad Creek Flood Control Project in Topton Borough
275,000
(Base Project Allocation - $250,000)
(Design and Contingencies - $25,000)
(G) Laurel Run Creek Flood Control Project in Muhlenberg Township
2,200,000
(Base Project Allocation - $2,000,000)
(Design and Contingencies - $200,000)
(H) Upgrade Berks County Sewage Treatment Plant
3,000,000
(Base Project Allocation - $3,000,000)
(I) Lower Alsace Township - Dredge channel, provide riprap, remove debris downstream from Angora Road
120,000
(Base Project Allocation - $100,000)
(Design and Contingencies - $20,000)
(J) Columbia Avenue - Install street storm drainage in conjunction with new street construction
120,000
(Base Project Allocation - $100,000)
(Design and Contingencies - $20,000)
(cxxxix) Bucks County
(A) Lower Southampton Township
(I) Pine Tree Farms drainage project
800,000
(Base Project Allocation - $800,000)
(II) Douglas Drive sewer improvement
120,000
(Base Project Allocation - $120,000)
(B) Falls Township storm water drainage improvement project
1,200,000
(Base Project Allocation - $1,200,000)
(C) Upper Southampton Township storm water drainage improvement project
2,000,000
(Base Project Allocation - $2,000,000)
(D) Ten-foot chain link fence to encircle the Bowman's Hill Wildflower Preserve
250,000
(Base Project Allocation - $250,000)
(cxl) Butler County
(A) Storm water management project for Butler Township
700,000
(Base Project Allocation - $700,000)
(B) City of Butler - Sullivan Run stream bank stabilization
500,000
(Base Project Allocation - $500,000)
(cxli) Cambria County
(A) Additional funds for DGS 182-4, Flood protection - City of Johnstown
160,000
(Base Project Allocation - $133,000)
(Design and Contingencies - $27,000)
(B) City of Johnstown - Channel improvements to St. Clair Run
1,320,000
(Base Project Allocation - $1,200,000)
(Design and Contingencies - $120,000)
(C) Lower Yoder Township - Construction of debris dam on St. Clair Run
605,000
(Base Project Allocation - $550,000)
(Design and Contingencies - $55,000)
(D) Upper Yoder Township - Construction of a flood control project on Cheney Run
600,000
(Base Project Allocation - $500,000)
(Design and Contingencies - $100,000)
(E) Upper Yoder Township - Construction of a flood control project on Cherry Run
438,000
(Base Project Allocation - $365,000)
(Design and Contingencies - $73,000)
(cxlii) Cameron County
(A) Emporium - Install 5,000 feet of curbing and storm sewers
168,000
(Base Project Allocation - $140,000)
(Design and Contingencies - $28,000)
(cxliii) Carbon County
(A) Acquisition of 18 mile Lehigh Valley Railroad right-of-way from Lehighton to Cementon for Scranton to Philadelphia Heritage Park project
900,000
(Base Project Allocation - $900,000)
(cxliv) Centre County
(A) Construction of a stream diversion project in Milesburg Borough and Boggs Township
400,000
(Base Project Allocation - $350,000)
(Design and Contingencies - $50,000)
(B) Correction of the storm water flooding in the Lytle addition subdivision in State College
485,000
(Base Project Allocation - $404,000)
(Design and Contingencies - $81,000)
(C) Philipsburg Borough - Replacing storm water pipe and cleaning storm drainage ditch
108,000
(Base Project Allocation - $90,000)
(Design and Contingencies - $18,000)
(D) Borough of Osceola Mills
(I) Reconstruction of a storm water culvert known as "the Canal"
432,000
(Base Project Allocation - $360,000)
(Design and Contingencies - $72,000)
(II) Construction of sewage treatment facility in conjunction with Osceola Mills Industrial Park Development
2,400,000
(Base Project Allocation - $2,000,000)
(Design and Contingencies - $400,000)
(E) Borough of Bellefonte - Expand Borough Sewer Authority facilities
7,800,000
(Base Project Allocation - $6,500,000)
(Design and Contingencies - $1,300,000)
(F) Updating and refurbishing Centre County solid waste transfer station
1,200,000
(Base Project Allocation - $1,000,000)
(Design and Contingencies - $200,000)
(G) Construction and operationalization of Centre County recycling centers
240,000
(Base Project Allocation - $200,000)
(Design and Contingencies - $40,000)
(H) Sewer line construction from Mid-State Airport to treatment center
960,000
(Base Project Allocation - $800,000)
(Design and Contingencies - $160,000)
(cxlv) Clearfield County
(A) Curwensville Borough - Construction of a flood control project
2,000,000
(Base Project Allocation - $1,833,000)
(Design and Contingencies - $167,000)
(B) For dredging and cleaning Janesville Dam, Smithmill, Clearfield County
300,000
(Base Project Allocation - $300,000)
(cxlvi) Clinton County
(A) Construction of the Beech Creek Rehabilitation Project in Beech Creek Township
400,000
(Base Project Allocation - $350,000)
(Design and Contingencies - $50,000)
(B) Erosion and sediment pollution control and fish habitat improvement project for Kettle Creek
141,000
(Base Project Allocation - $141,000)
(C) Erosion and sediment pollution control and fish habitat improvement project for Fishing Creek
32,000
(Base Project Allocation - $32,000)
(D) Woodward Township - flood control project
2,850,000
(Base Project Allocation - $2,550,000)
(Design and Contingencies - $300,000)
(E) Lock Haven - Federal flood control project
15,565,000
(Base Project Allocation - $14,150,000)
(Design and Contingencies - $1,415,000)
(cxlvii) Columbia County
(A) Town of Bloomsburg - Storm water management project to correct runoff problem from Bloomsburg State University
316,000
(Base Project Allocation - $256,000)
(Design and Contingencies - $60,000)
(B) Borough of Berwick - Construction to divert Thompson Run out of the borough sewer system
1,000,000
(Base Project Allocation - $800,000)
(Design and Contingencies - $200,000)
(cxlviii) Lackawanna County
(A) ((A) repealed July 8, 1994, P.L.444, No.74)
(B) Flood control projects on Lucky Run, Lindley Creek, Keyser Creek, Leach Creek, West Mountain Creek, Leggetts Creek, Meadowbrook, Roaring Brook, Mountain Lake, Stafford-Meadowbrook
5,500,000
(Base Project Allocation - $5,000,000)
(Design and Contingencies - $500,000)
(C) Replacement and/or rehabilitation of following: Luzerne Street culvert over Keyser Creek; Erie-Lackawanna Railroad culvert #1 over Keyser Creek; Erie-Lackawanna Railroad, West Mountain Road culvert over West Mountain Creek; culvert #2 over Keyser Creek; South Dewey Avenue culvert over Lindley Creek; South Merrifield Avenue culvert over Lindley Creek; South Cameron Avenue culvert over Lindley Creek; Jackson Street culvert over Keyser Creek; Horatio Avenue culvert over West Mountain Creek; North-South Road culvert over Keyser Creek; Erie-Lackawanna culvert #1 over Lucky Run Creek; Erie-Lackawanna culvert #2 over Lucky Run Creek; Erie-Lackawanna culvert #3 over Lucky Run Creek
2,970,000
(Base Project Allocation - $2,700,000)
(Design and Contingencies - $270,000)
(D) City of Carbondale and Carbondale Township - Installation of a storm water drainage system from Wayne Avenue and Copeland Street through Carbondale Township for discharge into the Lackawanna River
1,000,000
(Base Project Allocation - $925,000)
(Design and Contingencies - $75,000)
(E) City of Scranton
(I) ((I) repealed July 8, 1994, P.L.444, No.74)
(II) Storm water management system
11,000,000
(Base Project Allocation - $10,000,000)
(Design and Contingencies - $1,000,000)
(F) Dunmore Borough
(I) Storm water management system
4,400,000
(Base Project Allocation - $4,000,000)
(Design and Contingencies - $400,000)
(G) ((G) repealed July 11, 1996, Sp.Sess.2, P.L.1791, No.8)
(H) Taylor Borough
(I) Storm water management system
4,400,000
(Base Project Allocation - $4,000,000)
(Design and Contingencies - $400,000)
(I) Areas of the City of Scranton and Boroughs of Taylor and Dunmore
(I) PennDot Storm Water Management System Project on the State highways of: Jackson Street, Newton Road, Keyser Avenue, Morgan Highway, Luzerne Street, Main Avenue, West Market Street, Oak Street, Saltry Street, Providence Road, Queen Ridge Street, Linden Street, Mulberry Street, Harrison Avenue, Myrtle Street, Wheeler Avenue, Moosic Street, Stafford Avenue, Cedar Avenue, Birney Avenue, Pittston Avenue, Davis Street, Adams Avenue, Continental Street, Wyoming Avenue, Oak Street, Drinker Street and Blakely Street
5,500,000
(Base Project Allocation - $5,000,000)
(Design and Contingencies - $500,000)
(J) Clarks Summit Borough
(I) Dredging the tributaries of Leggets Creek
426,000
(Base Project Allocation - $355,000)
(Design and Contingencies - $71,000)
(II) Creek repairs to include dredging of creeks under Landsdowne, Maple, Linden, Hosfeld, Clarks Sunset and Center Streets
456,000
(Base Project Allocation - $380,000)
(Design and Contingencies - $76,000)
(III) Sewer line repair project
294,000
(Base Project Allocation - $294,000)
(IV) Clarks Summit and South Abington Township Joint Sewer Project
678,000
(Base Project Allocation - $678,000)
(K) Old Forge Borough
(I) Flood control and dredging of St. Johns Creek
1,050,000
(Base Project Allocation - $875,000)
(Design and Contingencies - $175,000)
(L) Fell Township
(I) Sewers and storm drains on Lackawanna River and Wilson Creek
540,000
(Base Project Allocation - $450,000)
(Design and Contingencies - $90,000)
(M) Scott Township
(I) Hull Creek dredging
1,026,000
(Base Project Allocation - $855,000)
(Design and Contingencies - $171,000)
(II) Construction of storm water drainage systems on Routes 438 and 247
168,000
(Base Project Allocation - $140,000)
(Design and Contingencies - $28,000)
(N) Benton Township
(I) Construction of and dredging of a storm drain
150,000
(Base Project Allocation - $125,000)
(Design and Contingencies - $25,000)
(O) Moosic Borough - Construction and repair of sewer system
641,000
(Base Project Allocation - $641,000)
(P) South Abington Township sewer construction project
600,000
(Base Project Allocation - $600,000)
(Q) Greenfield Township sewer construction project
510,000
(Base Project Allocation - $510,000)
(cxlix) Lancaster County
(A) West Lampeter Township - Construct storm water runoff control in Willow Street area
270,000
(Base Project Allocation - $225,000)
(Design and Contingencies - $45,000)
(cl) Luzerne County
(A) Additional funds for DGS 182-5, flood protection, Exeter Borough
112,000
(Base Project Allocation - $93,000)
(Design and Contingencies - $19,000)
(B) Construct storm sewer on Trayor Street, Sanovia Street and Scarborough Avenue in Sullivan Park Area
302,000
(Base Project Allocation - $252,000)
(Design and Contingencies - $50,000)
(C) Construct storm sewer system, Exeter Park Area - Harding, Wilson, Whitlock and Roosevelt Avenues
419,000
(Base Project Allocation - $349,000)
(Design and Contingencies - $70,000)
(D) Flood control project on Solomon Creek
500,000
(Base Project Allocation - $400,000)
(Design and Contingencies - $100,000)
(E) Flood control project on Mill Creek
500,000
(Base Project Allocation - $400,000)
(Design and Contingencies - $100,000)
(F) Flood control project on Laurel Run
500,000
(Base Project Allocation - $400,000)
(Design and Contingencies - $100,000)
(G) Flood Control project for Toby Creek and tributaries. To include digging of channel, channel widening, gabion wall construction, riprap slope protection, reinforced concrete retaining structures and water impounding basins in Dallas Borough; Dallas Township and Kingston Township
5,000,000
(Base Project Allocation - $4,000,000)
(Design and Contingencies - $1,000,000)
(H) Reconstruction and replacement of the storm water system for flood control in Yatesville Borough
360,000
(Base Project Allocation - $300,000)
(Design and Contingencies - $60,000)
(I) Flood control project for Curry Street in Duryea Borough
216,000
(Base Project Allocation - $180,000)
(Design and Contingencies - $36,000)
(J) Reconstruction of the storm water system along Columbus Avenue in the City of Pittston
720,000
(Base Project Allocation - $600,000)
(Design and Contingencies - $120,000)
(K) Construction of a flood control project in the area of the Barnum site and New Street in the City of Pittston and Duryea Borough
900,000
(Base Project Allocation - $750,000)
(Design and Contingencies - $150,000)
(L) Storm water management project along the Pittston Bypass to a discharge point located in the City of Pittston
4,200,000
(Base Project Allocation - $3,500,000)
(Design and Contingencies - $700,000)
(M) Flood control project, Mill Creek, Plains Township
10,000,000
(Base Project Allocation - $9,000,000)
(Design and Contingencies - $1,000,000)
(N) Construction of a flood control project on Forge Creek, Nanticoke, Newport Township
1,120,000
(Base Project Allocation - $900,000)
(Design and Contingencies - $220,000)
(O) Stream bank stabilization project in Pittston Township
2,900,000
(Base Project Allocation - $2,900,000)
(P) Storm sewer extension project on Poplar Street
100,000
(Base Project Allocation - $100,000)
(Q) Abraham's Creek and Warsaw Street Projects
67,000
(Base Project Allocation - $67,000)
(R) Storm water system for Newport Township
936,000
(Base Project Allocation - $936,000)
(S) Susquehanna River flood control project
45,000,000
(Base Project Allocation - $45,000,000)
(T) Separation and reconstruction of storm water drainage system and sewage system along S.R.92 in West Pittston Borough
180,000
(Base Project Allocation - $148,000)
(Design and Contingencies - $32,000)
(U) Matching funds for EPA Sewage Project, Jackson Township
1,011,000
(Base Project Allocation - $1,011,000)
(cli) McKean County
(A) Flood protection, Port Allegheny Borough
6,670,000
(Base Project Allocation - $5,500,000)
(Design and Contingencies - $1,170,000)
(clii) Mercer County
(A) Flood control for Pymatuning Township
200,000
(Base Project Allocation - $150,000)
(Design and Contingencies - $50,000)
(cliii) Mifflin County
(A) Granville Township - establish water and sewer services for Strodes Mills area
1,500,000
(Base Project Allocation - $1,250,000)
(Design and Contingencies - $250,000)
(cliv) Monroe County
(A) Pocono Performing Arts Center
(I) Design and construction of a concert shell infrastructure for the Pennsylvania Center for the Performing Arts in the Delaware Water Gap National Recreational Area, Middle Smithfield Township
17,000,000
(Base Project Allocation - $17,000,000)
((A) amended July 11, 1989, P.L.320, No.54)
(clv) Montgomery County
(A) Township of Upper Moreland - Construction of a retention basin and storm drainage pipe in the Cortello Avenue area
184,000
(Base Project Allocation - $154,000)
(Design and Contingencies - $30,000)
(B) Construction of a storm sewer in Rockledge Borough, South Sylvania Avenue to Church Road
200,000
(Base Project Allocation - $150,000)
(Design and Contingencies - $50,000)
(C) Township of Abington - construction of Cumberland Road storm sewer, Horace Avenue to Susquehanna Road
150,000
(Base Project Allocation - $100,000)
(Design and Contingencies - $50,000)
(D) Township of Abington - construction of Govania Avenue storm sewer, Montgomery Avenue to Glendale Avenue
325,000
(Base Project Allocation - $275,000)
(Design and Contingencies - $50,000)
(E) Various road projects associated with the conversion of Norristown State Hospital Farm to a State park
10,200,000
(Base Project Allocation - $8,160,000)
(Design and Contingencies - $2,040,000)
(F) Channel improvements for Plymouth Creek in Conshohocken Borough
625,000
(Base Project Allocation - $500,000)
(Design and Contingencies - $125,000)
(clvi) Northampton County
(A) Construction of a fish passageway on the Lehigh River at the Easton Dam
2,300,000
(Base Project Allocation - $1,840,000)
(Design and Contingencies - $460,000)
(B) Construction of a fish passageway on the Lehigh River at the Chain Dam
1,000,000
(Base Project Allocation - $800,000)
(Design and Contingencies - $200,000)
(C) Renovation and repair of Illick's Mill Dam on Monocacy Creek in the City of Bethlehem
160,000
(Base Project Allocation - $160,000)
(clvii) Schuylkill County
(A) Construction of a mine acid treatment plant on the upper end of the Little Schuylkill River, north of Tamaqua
1,800,000
(Base Project Allocation - $1,500,000)
(Design and Contingencies - $300,000)
(B) Tamaqua Borough Flood Protection Project, Commonwealth portion of non-Federal cost-share of the Federal flood control project as authorized by the Water Resources Development Act of 1974
2,800,000
(Base Project Allocation - $2,520,000)
(Design and Contingencies - $280,000)
((B) amended July 11, 1989, P.L.320, No.54)
(C) Construction of new water lines for residential water services and fire protection in Coaldale Borough
135,000
(Base Project Allocation - $135,000)
(clviii) Snyder County
(A) Construction of recreational facilities for Walker Lake/Middle Creek Watershed - flood control project
1,800,000
(Base Project Allocation - $1,500,000)
(Design and Contingencies - $300,000)
(clix) Westmoreland County
(A) Flood protection projects DGS 180-35 and 180-36, tributary Jack's Run, road sections 1 and 2: Route 119 to Greensburg High School in City of Greensburg and Hempfield Township, additional appropriation
500,000
(B) ((B) repealed Oct. 10, 1997, P.L.392, No.47)
(C) ((C) repealed Oct. 10, 1997, P.L.392, No.47)
(D) Additional funds for the closing of Greensburg landfill
200,000
(Base Project Allocation - $200,000)
(E) Unity Run culvert extension in Latrobe Borough
150,000
(Base Project Allocation - $125,000)
(Design and Contingencies - $25,000)
(clx) Wyoming County
(A) Lazybrook Acres flood control project in Tunkhannock Township
3,000,000
(Base Project Allocation - $2,500,000)
(Design and Contingencies - $500,000)
(clxi) York County
(A) Channel improvements to Little Conewago Creek in Dover and West Manchester Townships
120,000
(Base Project Allocation - $120,000)
(clxii) Departmental Statewide projects
(A) Equipment to maintain flood control projects
5,500,000
(Base Project Allocation - $5,000,000)
(Design and Contingencies - $500,000)
(B) State Forest Bridge Rehabilitation Program
2,200,000
(Base Project Allocation - $2,000,000)
(Design and Contingencies - $200,000)
(6) Department of General Services
$83,992,000
(i) Capitol Complex
(A) Upgrade elevators in Health and Welfare Building
1,188,000
(Base Project Allocation - $990,000)
(Design and Contingencies - $198,000)
(B) Upgrade lighting systems in Health and Welfare and Labor and Industry Buildings
1,267,000
(Base Project Allocation - $1,056,000)
(Design and Contingencies - $211,000)
(C) Upgrade elevators, replace windows and roof and repoint North Office Building
3,360,000
(Base Project Allocation - $2,800,000)
(Design and Contingencies - $560,000)
(D) Additional funds for Project No. DGS 948-26; renovation and waterproofing of underground garage
3,600,000
(Additional Base Allocation - $3,000,000)
(Additional Design and Contingencies - $600,000)
(ii) Harrisburg Area
(A) Commonwealth Computer Facility
6,328,000
(Base Project Allocation - $5,219,000)
(Design and Contingencies - $1,109,000)
(B) Additional funds for DGS 948-22; Market Street State Office Building
14,232,000
(Base Project Allocation - $14,232,000)
(C) Environmental Resources Laboratory and Regional Office Building
24,850,000
(Base Project Allocation - $20,500,000)
(Design and Contingencies - $4,350,000)
(iii) David L. Lawrence Convention Center
(A) Funding for preliminary study, planning, property acquisition and expansion of the David L. Lawrence Convention Center
7,000,000
(Base Project Allocation - $7,000,000)
(iv) Erie Civic Center
(A) Construction of addition to the center
3,000,000
(Base Project Allocation - $2,500,000)
(Design and Contingencies - $500,000)
(B) Renovation of existing Erie Civic Center
100,000
(Base Project Allocation - $100,000)
(C) Replacement of HVAC systems and repair facade for Warner Theatre
228,000
(Base Project Allocation - $190,000)
(Design and Contingencies - $38,000)
(D) Renovation and repairs to Louis J. Tullio Convention Center
127,000
(Base Project Allocation - $106,000)
(Design and Contingencies - $21,000)
(E) Replacement of HVAC system for Sears Building
344,000
(Base Project Allocation - $287,000)
(Design and Contingencies - $57,000)
(v) Philadelphia State Office Building
(A) Upgrade chillers, replace windows and lobby flooring, repair exterior tiles and seal and repoint exterior concrete surface
4,488,000
(Base Project Allocation - $3,740,000)
(Design and Contingencies - $748,000)
(vi) Philadelphia Zoo
(A) Proposing acquisition and construction of the Environmental Education Building and amphitheatre at the Philadelphia Zoo to be known as the Frank J. Palumbo Building
5,380,000
(Base Project Allocation - $4,580,000)
(Design and Contingencies - $800,000)
(vii) Summer Facility
(A) Acquisition and development of land in Bedford, Pennsylvania, for multiuse public park with amphitheater suitable for concerts and other cultural events
8,500,000
(Base Project Allocation - $8,500,000)
(7) Department of Health
$6,500,000
(i) Diagnostic and Rehabilitation Center
(A) Additional funds for DGS 522.1 for acquisition of adjacent facility and renovations of existing facility
3,500,000
(Base Project Allocation - $3,000,000)
(Design and Contingencies - $500,000)
(ii) Addictive Diseases Center
(A) Additional funds for completion of DGS 510-28
3,000,000
(Base Project Allocation - $2,750,000)
(Design and Contingencies - $250,000)
(8) Historical and Museum Commission
$49,186,000
(Amount amended July 11, 1989, P.L.320, No.54)
(i) Cornwall Furnace
(A) Restoration, Phase II
825,000
(Base Project Allocation - $750,000)
(Design and Contingencies - $75,000)
(B) Fire and security system
144,000
(Base Project Allocation - $120,000)
(Design and Contingencies - $24,000)
(C) Restoration and stabilization
600,000
(Base Project Allocation - $500,000)
(Design and Contingencies - $100,000)
(ii) Bushy Run Battlefield
(A) Fire and security system
120,000
(Base Project Allocation - $100,000)
(Design and Contingencies - $20,000)
(iii) Commonwealth Conservation Center
(A) Original equipment
1,800,000
(Base Project Allocation - $1,500,000)
(Design and Contingencies - $300,000)
(iv) Ephrata Cloister
(A) Fire suppression system
600,000
(Base Project Allocation - $500,000)
(Design and Contingencies - $100,000)
(v) Flagship Niagara
(A) Additional funds for DGS 974-5, restoration of Flagship Niagara
1,500,000
(Base Project Allocation - $1,500,000)
(B) Construction of a maritime museum and permanent berthing facility for the Flagship Niagara
5,000,000
(Base Project Allocation - $5,000,000)
(vi) Old Economy Village
(A) Restoration of Granary
550,000
(Base Project Allocation - $500,000)
(Design and Contingencies - $50,000)
(B) Restoration and preservation of Feast Hall
600,000
(Base Project Allocation - $500,000)
(Design and Contingencies - $100,000)
(C) Additional funds for restoration and preservation of select miners' houses - Phase II
2,400,000
(Base Project Allocation - $2,000,000)
(Design and Contingencies - $400,000)
(D) Restoration of outbuildings associated with building
180,000
(Base Project Allocation - $150,000)
(Design and Contingencies - $30,000)
(E) Restoration of Robertson House
216,000
(Base Project Allocation - $180,000)
(Design and Contingencies - $36,000)
(vii) Daniel Boone Homestead
(A) Construction of an orientation exhibition gallery for the visitors center
110,000
(Base Project Allocation - $100,000)
(Design and Contingencies - $10,000)
(B) Restoration and preservation of Betolet Log Cabin
150,000
(Base Project Allocation - $125,000)
(Design and Contingencies - $25,000)
(C) Restoration of Bertoil Log Cabin
122,000
(Base Project Allocation - $102,000)
(Design and Contingencies - $20,000)
(viii) Eckley Miners Village
(A) Renovation and rehabilitation of buildings
750,000
(Base Project Allocation - $625,000)
(Design and Contingencies - $125,000)
(B) Acquisition of antique furnishings and equipment
144,000
(Base Project Allocation - $120,000)
(Design and Contingencies - $24,000)
(C) Permanent exhibits and period rooms in mine owners house
100,000
(Base Project Allocation - $83,000)
(Design and Contingencies - $17,000)
(D) Additional funds for restoration
120,000
(Base Project Allocation - $100,000)
(Design and Contingencies - $20,000)
(E) Adoption of coal breaker as visitors center
900,000
(Base Project Allocation - $750,000)
(Design and Contingencies - $150,000)
(ix) Altoona
(A) Conversion of the former Pennsylvania Railroad office building located on Ninth Avenue in the City of Altoona. Conversion to include display area; food service area; storage area; and general office space
4,500,000
(Base Project Allocation - $3,600,000)
(Design and Contingencies - $900,000)
(x) Lackawanna County Anthracite Museum
(A) Additional funds for the Lackawanna County Anthracite Museum at McDade Park
550,000
(Base Project Allocation - $500,000)
(Design and Contingencies - $50,000)
(xi) Landis Valley Museum
(A) Original equipment regional storage facility - Phase II
1,200,000
(Base Project Allocation - $1,000,000)
(Design and Contingencies - $200,000)
(xii) Erie Art Museum
(A) For expansion of the Erie Art Museum to include the Ashby Building as part of the facility, including a physical link between structures
625,000
(Base Project Allocation - $500,000)
(Design and Contingencies - $125,000)
(xiii) Somerset Historical Center
(A) Additional funds for DGS 990-2; construction of an addition to the center and improvements for parking and entrance areas
500,000
(Base Project Allocation - $425,000)
(Design and Contingencies - $75,000)
(xiv) Canal Museum in Easton
(A) For expansion and reconstruction of the Canal Museum in Easton
1,584,000
(Base Project Allocation - $1,440,000)
(Design and Contingencies - $144,000)
(xv) Burnside Farm
(A) Reconstruction and renovation of the historic Burnside Farm in Lehigh County
836,000
(Base Project Allocation - $500,000)
(Land Allocation - $197,000)
(Design and Contingencies - $139,000)
(xvi) Railroad Museum of Pennsylvania
(A) Construction of an addition to Rolling Stock Hall
2,160,000
(Base Project Allocation - $1,800,000)
(Design and Contingencies - $360,000)
(B) Facility expansion
2,400,000
(Base Project Allocation - $2,000,000)
(Design and Contingencies - $400,000)
(C) Fire and security system
120,000
(Base Project Allocation - $100,000)
(Design and Contingencies - $20,000)
(xvii) Anthracite Museum Complex
(A) Reseal and resurface driveways and parking areas
352,000
(Base Project Allocation - $293,000)
(Design and Contingencies - $59,000)
(xviii) Brandywine Battlefield
(A) Restoration and preservation of Lafayette's Headquarters
600,000
(Base Project Allocation - $500,000)
(Design and Contingencies - $100,000)
(xix) Curtin Village
(A) Restoration of village - Phase I
660,000
(Base Project Allocation - $550,000)
(Design and Contingencies - $110,000)
(xx) Graeme Park
(A) Restoration and preservation of Keith House
420,000
(Base Project Allocation - $350,000)
(Design and Contingencies - $70,000)
(xxi) Hope Lodge/Mather Mill
(A) Restoration and preservation of Manor House and kitchen wing - Phase II
240,000
(Base Project Allocation - $200,000)
(Design and Contingencies - $40,000)
(B) Restoration of period gardens
240,000
(Base Project Allocation - $200,000)
(Design and Contingencies - $40,000)
(xxii) Joseph Priestley House
(A) Restoration and preservation
480,000
(Base Project Allocation - $400,000)
(Design and Contingencies - $80,000)
(xxiii) Old Custom House/Cashiers House
(A) Structural repairs and restoration
120,000
(Base Project Allocation - $100,000)
(Design and Contingencies - $20,000)
(B) Restoration and preservation of Great House
540,000
(Base Project Allocation - $450,000)
(Design and Contingencies - $90,000)
(xxiv) Old Mill Village
(A) Survey and structural repairs
240,000
(Base Project Allocation - $200,000)
(Design and Contingencies - $40,000)
(xxv) State Museum of Pennsylvania
(A) Planetarium renovations
480,000
(Base Project Allocation - $400,000)
(Design and Contingencies - $80,000)
(xxvi) Washington Crossing Historic Park
(A) Resurface and reseal roads and parking areas
240,000
(Base Project Allocation - $200,000)
(Design and Contingencies - $40,000)
(B) Restoration and preservation of buildings at Taylorsville - Phase I
240,000
(Base Project Allocation - $200,000)
(Design and Contingencies - $40,000)
(C) Restoration Taylorsville Houses - Phase II
240,000
(Base Project Allocation - $200,000)
(Design and Contingencies - $40,000)
(D) Fire and security system
240,000
(Base Project Allocation - $200,000)
(Design and Contingencies - $40,000)
(xxvii) Conrad Weiser Homestead
(A) Fire and security system
120,000
(Base Project Allocation - $100,000)
(Design and Contingencies - $20,000)
(xxviii) Graeme Park
(A) Remodel Barn as visitor center
480,000
(Base Project Allocation - $400,000)
(Design and Contingencies - $80,000)
(xxix) Hope Lodge/Mather Mill
(A) Conversion of barn to visitor center
1,080,000
(Base Project Allocation - $900,000)
(Design and Contingencies - $180,000)
(xxx) Pennsbury Manor
(A) Expansion and renovation of visitor center
720,000
(Base Project Allocation - $600,000)
(Design and Contingencies - $120,000)
(xxxi) Washington Crossing Historic Park
(A) Upgrade visitor center
252,000
(Base Project Allocation - $210,000)
(Design and Contingencies - $42,000)
(xxxii) Ephrata Cloister
(A) Fire Suppression System, Phase II
496,000
(Base Project Allocation - $413,000)
(Design and Contingencies - $83,000)
(xxxiii) Pennsbury Manor
(A) Construction of a visitor center
3,000,000
(Base Project Allocation - $3,000,000)
(xxxiv) Johnstown Flood Museum
(A) Development of the Cambria Iron Works Building in conjunction with the National Park Service Industrial Heritage Project
1,200,000
(Base Project Allocation - 1,200,000)
(xxxv) Graeme Park and Keith Mansion, Montgomery County
(A) Restoration and maintenance of the park and mansion
600,000
(Base Project Allocation - $500,000)
(Design and Contingencies - $100,000)
(xxxvi) Fort Pitt Museum, Point State Park
(A) Replace and reconstruct roofing system and restore interior finishes
500,000
(Base Project Allocation - $500,000)
(xxxvii) New Freedom Theatre, Philadelphia
(A) Renovations to the New Freedom Theatre. No funds from this authorization shall be expended until such time that legislation authorizing the acquisition of the New Freedom Theatre in Philadelphia by the Commonwealth has been enacted by the General Assembly
4,000,000
(Base Project Allocation - $3,333,000)
(Design and Contingencies - $667,000)
((xxxvii) added July 11, 1989, P.L.320, No.54)
(9) Department of Military Affairs
$26,558,000
(i) Dixmont State Hospital
(A) Restoration and renovation of the former Dixmont State Hospital for use as a veterans' nursing home
6,000,000
(Base Project Allocation - $5,000,000)
(Design and Contingencies - $1,000,000)
(ii) South Mountain Restoration Center
(A) Conversion and restoration of vacant facilities at the South Mountain Restoration Center for use as a veterans' nursing home
6,000,000
(Base Project Allocation - $5,000,000)
(Design and Contingencies - $1,000,000)
(iii) Hollidaysburg Veterans' Home
(A) Construction of a chapel
110,000
(Base Project Allocation - $100,000)
(Design and Contingencies - $10,000)
(B) Additional funds for renovation of Sommer Hall
1,237,000
(Base Project Allocation - $1,031,000)
(Design and Contingencies - $206,000)
(iv) Pennhurst Veterans' Home
(A) Additional funds for DGS 960-50; Renovation and Conversion of Pennhurst Center to a veterans' home
422,000
(Base Project Allocation - $352,000)
(Design and Contingencies - $70,000)
(v) Pennsylvania Soldiers' and Sailors' Home
(A) Conversion of personal care beds (27) to nursing care beds (27)
972,000
(Base Project Allocation - $810,000)
(Design and Contingencies - $162,000)
(vi) Cumberland County, North Middleton Twp., HQ and HQ Bty., 108th Field Artillery
(A) Drill floor addition to Armory, 130 feet x 60 feet x 40 feet
400,000
(Base Project Allocation - $400,000)
(vii) Fort Indiantown Gap
(A) Acquisition of land for weapons training
149,000
(Base Project Allocation - $135,000)
(Design and Contingencies - $14,000)
(viii) Spring City Armory
(A) Convert building at former Pennhurst Center to an armory
198,000
(Base Project Allocation - $165,000)
(Design and Contingencies - $33,000)
(ix) Soldiers' and Sailors' Home - Erie
(A) Vehicle and maintenance facility
380,000
(Base Project Allocation - $317,000)
(Design and Contingencies - $63,000)
(x) Washington County Airport
(A) Air National Guard site improvements
2,500,000
(Base Project Allocation - $2,500,000)
(xi) Northeastern Pennsylvania Veterans' Home
(A) State share of the construction of a veterans' home on the site of the Scranton State General Hospital, including necessary demolition of the existing hospital
8,190,000
(Base Project Allocation - $6,825,000)
(Design and Contingencies - $1,365,000)
(10) Department of Public Welfare
$64,639,000
(i) Clarks Summit State Hospital
(A) Sewage treatment plant holding tank and reflushing digester
540,000
(Base Project Allocation - $450,000)
(Design and Contingencies - $90,000)
(B) Install baseboard or wall radiation - also additional area thermostat
1,350,000
(Base Project Allocation - $1,125,000)
(Design and Contingencies - $225,000)
(C) Air condition geriatric building, 6 Hilltop West
1,780,000
(Base Project Allocation - $1,400,000)
(Design and Contingencies - $380,000)
(D) Construct offices and treatment rooms in Newton Hall
960,000
(Base Project Allocation - $800,000)
(Design and Contingencies - $160,000)
(E) Air conditioning in Newton Building and renovate main kitchen
2,880,000
(Base Project Allocation - $2,400,000)
(Design and Contingencies - $480,000)
(F) Air conditioning in Hill Top East and Abington Hall
1,800,000
(Base Project Allocation - $1,500,000)
(Design and Contingencies - $300,000)
(ii) Farview State Hospital
(A) Renovation of sewage treatment system
1,500,000
(Base Project Allocation - $1,250,000)
(Design and Contingencies - $250,000)
(iii) Harrisburg State Hospital
(A) Upgrade electrical substation and switchgear
1,980,000
(Base Project Allocation - $1,650,000)
(Design and Contingencies - $330,000)
(B) Fire alarm system
648,000
(Base Project Allocation - $540,000)
(Design and Contingencies - $108,000)
(iv) Haverford State Hospital
(A) Secondary water supply system
180,000
(Base Project Allocation - $150,000)
(Design and Contingencies - $30,000)
(v) Norristown State Hospital
(A) Air Condition Patient Building No. 11
969,000
(Base Project Allocation - $774,000)
(Design and Contingencies - $195,000)
(B) Air Condition Patient Building No. 12
1,215,000
(Base Project Allocation - $972,000)
(Design and Contingencies - $243,000)
(vi) Torrance State Hospital
(A) Reservoir cover
211,000
(Base Project Allocation - $176,000)
(Design and Contingencies - $35,000)
(vii) Wernersville State Hospital
(A) Air condition Building No. 34
1,728,000
(Base Project Allocation - $1,440,000)
(Design and Contingencies - $288,000)
(B) Replace heating system in Building No. 30
462,000
(Base Project Allocation - $385,000)
(Design and Contingencies - $77,000)
(C) Air condition Building No. 35
1,582,000
(Base Project Allocation - $1,320,000)
(Design and Contingencies - $262,000)
(D) Air condition Building No. 37
1,020,000
(Base Project Allocation - $850,000)
(Design and Contingencies - $170,000)
((D) amended July 11, 1989, P.L.320, No.54)
(viii) Phillipsburg State General Hospital
(A) Renovations and capital improvements
5,000,000
(Base Project Allocation - $4,200,000)
(Design and Contingencies - $800,000)
(B) Renovations, including relocation and remodeling, and air conditioning in main hospital building
9,025,000
(Base Project Allocation - $7,525,000)
(Design and Contingencies - $1,500,000)
(ix) Scranton State General Hospital
(A) Renovations to existing structure
3,300,000
(Base Project Allocation - $3,000,000)
(Design and Contingencies - $300,000)
(x) Ebensburg State Center
(A) Upgrade electrical system and install air conditioning in Unit IV
620,000
(Base Project Allocation - $517,000)
(Design and Contingencies - $103,000)
(xi) Embreeville Center
(A) Upgrade heating system and install air conditioning in Towerview Building
858,000
(Base Project Allocation - $715,000)
(Design and Contingencies - $143,000)
(xii) Hamburg Center
(A) Install central chilled air conditioning and heating units in Pine Hall
368,000
(Base Project Allocation - $225,000)
(Design and Contingencies - $143,000)
(xiii) Laurelton Center
(A) Water filtration system
660,000
(Base Project Allocation - $550,000)
(Design and Contingencies - $110,000)
(B) Air condition the hospital building
977,000
(Base Project Allocation - $814,000)
(Design and Contingencies - $163,000)
(C) Construction of a therapeutic swimming pool
835,000
(Base Project Allocation - $685,000)
(Design and Contingencies - $150,000)
(xiv) Polk Center
(A) Air condition the Meadowside Building
1,380,000
(Base Project Allocation - $1,150,000)
(Design and Contingencies - $230,000)
(xv) Selinsgrove Center
(A) Installation of elevators in central building
300,000
(Base Project Allocation - $250,000)
(Design and Contingencies - $50,000)
(B) Install new baths in central building
852,000
(Base Project Allocation - $710,000)
(Design and Contingencies - $142,000)
(xvi) Warren State Hospital
(A) Exterior renovation/improvement to Israel Building
2,160,000
(Base Project Allocation - $1,800,000)
(Design and Contingencies - $360,000)
(xvii) Western Center
(A) Demolition of Building No. 40
132,000
(Base Project Allocation - $110,000)
(Design and Contingencies - $22,000)
(xviii) Western Pennsylvania Childrens' Intensive Treatment Unit
(A) Construction of three living units
375,000
(Base Project Allocation - $337,500)
(Design and Contingencies - $37,500)
(B) Renovation of eight garages into classrooms
50,000
(Base Project Allocation - $45,000)
(Design and Contingencies - $5,000)
(C) Renovation of two-story administrative structure
22,000
(Base Project Allocation - $20,000)
(Design and Contingencies - $2,000)
(D) Renovation of recreational facility, including supervisor's office and recreational office
50,000
(Base Project Allocation - $45,000)
(Design and Contingencies - $5,000)
(xix) Western Psychiatric Institute and Clinic
(A) Construction of a children and youth center
12,000,000
(Base Project Allocation - $10,000,000)
(Design and Contingencies - $2,000,000)
(B) Infrastructure improvements of Western Center
1,950,000
(Base Project Allocation - $1,950,000)
(xx) Adult Vocational Rehabilitation Center
(A) Design and construction of an adult vocational rehabilitation center in Indiana County
400,000
(Base Project Allocation - $400,000)
(xxi) New Castle Youth Development Center
(A) Education Building
1,320,000
(Base Project Allocation - $1,100,000)
(Design and Contingencies - $220,000)
(B) Construction of new educational facility
1,200,000
(Base Project Allocation - $1,000,000)
(Design and Contingencies - $200,000)
(11) State Police
$8,364,000
(i) State Police Academy
(A) Renovation
5,527,000
(Base Project Allocation - $4,556,000)
(Design and Contingencies - $971,000)
(ii) Bethlehem Headquarters
Additional funds for Project No. DGS 206-3; Renovation and Expansion of Troop "M" Headquarters Building
502,000
(Base Project Allocation - $419,000)
(Design and Contingencies - $83,000)
(iii) Hollidaysburg Barracks
(A) Additional funds for DGS 201-3; renovation and expansion of headquarters building
307,000
(Base Project Allocation - $307,000)
(iv) Lancaster County Station
(A) Renovation and Addition
2,028,000
(Base Project Allocation - $1,690,000)
(Design and Contingencies - $338,000)
(12) State System of Higher Education
$162,052,000
(i) Bloomsburg State University
(A) Automatic fire detection/alarm system
307,000
(Base Project Allocation - $256,000)
(Design and Contingencies - $51,000)
(B) Steam line improvements
1,258,000
(Base Project Allocation - $1,048,000)
(Design and Contingencies - $210,000)
(C) Construction of a new library
11,400,000
(Base Project Allocation - $9,500,000)
(Design and Contingencies - $1,900,000)
(ii) California State University
(A) Automatic fire detection/alarm system
275,000
(Base Project Allocation - $229,000)
(Design and Contingencies - $46,000)
(B) Renovations to Hamer Gymnasium
4,128,000
(Base Project Allocation - $3,440,000)
(Design and Contingencies - $688,000)
(C) Construction of Science and Technology/Math and Earth Science Building
13,718,000
(Base Project Allocation - $11,157,000)
(Land Allocation - $300,000)
(Design and Contingencies - $2,261,000)
(D) Addition of funds to DGS 402-46 to include installation of boilers to permit summer shutdown
550,000
(Base Project Allocation - $500,000)
(Design and Contingencies - $50,000)
(iii) Cheyney State University
(A) Renovation of Biddle Hall
1,625,000
(Base Project Allocation - $1,354,000)
(Design and Contingencies - $271,000)
(B) Additional funds for DGS 403-57; renovation of Armstrong House
220,000
(Base Project Allocation - $200,000)
(Design and Contingencies - $20,000)
(C) Air conditioning of buildings
1,000,000
(Base Project Allocation - $900,000)
(Design and Contingencies - $100,000)
(D) Construction of multipurpose center
11,400,000
(Base Project Allocation - $9,500,000)
(Design and Contingencies - $1,900,000)
(E) Renovation of dining area
650,000
(Base Project Allocation - $585,000)
(Design and Contingencies - $65,000)
(F) Elevator replacements
1,000,000
(Base Project Allocation - $900,000)
(Design and Contingencies - $100,000)
(G) Complete landscaping of campus
500,000
(Base Project Allocation - $450,000)
(Design and Contingencies - $50,000)
(H) Renovation of building for hospitality center
300,000
(Base Project Allocation - $270,000)
(Design and Contingencies - $30,000)
(I) Additional funds for DGS 403-54; Renovations to Tubman Hall, Robinson Hall, Yarnall Hall, King Hall and Truth Hall
3,200,000
(Base Project Allocation - $2,667,000)
(Design and Contingencies - $533,000)
(J) Addition of funds to DGS 403-54 to complete renovations of five dorms as part of the Commonwealth Enhancement Plan
3,960,000
(Base Project Allocation - $3,300,000)
(Design and Contingencies - $660,000)
(iv) Clarion State University
(A) Renovation of Founders Hall
2,189,000
(Base Project Allocation - $1,824,000)
(Design and Contingencies - $365,000)
(B) Upgrade building system in Carlson, Tippen, Marwick-Boyd and Frame Halls
1,560,000
(Base Project Allocation - $1,300,000)
(Design and Contingencies - $260,000)
(C) Renovation of Harvey Hall
840,000
(Base Project Allocation - $700,000)
(Design and Contingencies - $140,000)
(v) East Stroudsburg State University
(A) Renovation of Gessner Science Center
1,758,000
(Base Project Allocation - $1,465,000)
(Design and Contingencies - $293,000)
(vi) Edinboro State University
(A) Automatic fire detection/alarm system
479,000
(Base Project Allocation - $399,000)
(Design and Contingencies - $80,000)
(B) Renovation of Loveland Hall
300,000
(Base Project Allocation - $250,000)
(Design and Contingencies - $50,000)
(C) Upgrade entire electrical system
2,220,000
(Base Project Allocation - $1,850,000)
(Design and Contingencies - $370,000)
(D) Construction of disabled student service facility
6,222,000
(Base Project Allocation - $5,185,000)
(Design and Contingencies - $1,037,000)
(E) Replacement of PCB Transformers
396,000
(Base Project Allocation - $330,000)
(Design and Contingencies - $66,000)
(vii) Indiana State University
(A) Automatic fire detection/alarm system
594,000
(Base Project Allocation - $495,000)
(Design and Contingencies - $99,000)
(B) Phase II renovation of Weyandt Hall
4,800,000
(Base Project Allocation - $4,000,000)
(Design and Contingencies - $800,000)
(C) Construction of College of Business classroom building
10,371,000
(Base Project Allocation - $8,988,000)
(Design and Contingencies - $1,383,000)
(viii) Kutztown State University
(A) Automatic fire detection/alarm system
350,000
(Base Project Allocation - $292,000)
(Design and Contingencies - $58,000)
(B) Upgrade electrical distribution system
924,000
(Base Project Allocation - $770,000)
(Design and Contingencies - $154,000)
(C) Phase II renovation of Old Main
4,500,000
(Base Project Allocation - $3,750,000)
(Design and Contingencies - $750,000)
(D) Addition to the library
7,745,000
(Base Project Allocation - $7,745,000)
(E) Renovation of the learning center
2,100,000
(Base Project Allocation - $2,100,000)
(F) Addition to de Francesco Building
1,870,000
(Base Project Allocation - $1,870,000)
(G) Upgrading of athletic facility
2,800,000
(Base Project Allocation - $2,800,000)
(ix) Lock Haven State University
(A) Automatic fire detection/alarm system
179,000
(Base Project Allocation - $149,000)
(Design and Contingencies - $30,000)
(B) Phase III renovation to Jack Stadium and related facilities
723,000
(Base Project Allocation - $602,000)
(Design and Contingencies - $121,000)
(C) Renovation of Ulmer Hall
2,420,000
(Base Project Allocation - $2,016,000)
(Design and Contingencies - $404,000)
(D) Acquisition and construction of new parking facilities
1,550,000
(Base Project Allocation - $1,300,000)
(Design and Contingencies - $250,000)
(x) Mansfield State University
(A) Automatic fire detection/alarm system
158,000
(Base Project Allocation - $132,000)
(Design and Contingencies - $26,000)
(B) Renovate Allen Hall
2,880,000
(Base Project Allocation - $2,400,000)
(Design and Contingencies - $480,000)
(C) Renovation of Straughn Auditorium
2,066,000
(Base Project Allocation - $1,722,000)
(Design and Contingencies - $344,000)
(xi) Millersville State University
(A) Automatic fire detection/alarm system
551,000
(Base Project Allocation - $459,000)
(Design and Contingencies - $92,000)
(B) Intersection improvements and new traffic light
120,000
(Base Project Allocation - $100,000)
(Design and Contingencies - $20,000)
(C) Rehabilitation of Myers Hall
1,600,000
(Base Project Allocation - $1,280,000)
(Design and Contingencies - $320,000)
(D) Addition to Roddy Science Center, Phase II
11,955,000
(Base Project Allocation - $9,962,000)
(Design and Contingencies - $1,993,000)
(xii) Shippensburg State University
(A) Automatic fire detection/alarm system
298,000
(Base Project Allocation - $248,000)
(Design and Contingencies - $50,000)
(B) Upgrade of electrical distribution system
1,069,000
(Base Project Allocation - $891,000)
(Design and Contingencies - $178,000)
(C) Construction of a computer addition to the Dauphin Humanities Center
4,500,000
(Base Project Allocation - $3,750,000)
(Design and Contingencies - $750,000)
(D) Completion of Old Main renovation
1,200,000
(Base Project Allocation - $1,200,000)
(xiii) Slippery Rock State University
(A) Renovation of the East-West instructional complex
2,395,000
(Base Project Allocation - $1,996,000)
(Design and Contingencies - $399,000)
(xiv) West Chester State University
(A) Automatic fire detection/alarm system
883,000
(Base Project Allocation - $736,000)
(Design and Contingencies - $147,000)
(B) Construction of an addition to the science center
9,996,000
(Base Project Allocation - $8,330,000)
(Design and Contingencies - $1,666,000)
(xv) State System of Higher Education
(A) Asbestos abatement program on all 14 campuses of the State system
10,000,000
(Base Project Allocation - $8,333,000)
(Design and Contingencies - $1,667,000)
(13) Department of Transportation
$161,276,00
(Amount amended July 11, 1989, P.L.320, No.54)
(i) Centre County
(A) Mid-State Airport - General improvements to airport facilities
600,000
(Base Project Allocation - $500,000)
(Design and Contingencies - $100,000)
(ii) Harrisburg Area
(A) New testing laboratory
3,600,000
(Base Project Allocation - $3,000,000)
(Design and Contingencies - $600,000)
(iii) Adams County
(A) New welcome center
2,580,000
(Base Project Allocation - $2,000,000)
(Design and Contingencies - $430,000)
(Land Allocation - $150,000)
(iv) ((iv) deleted by amendment July 11, 1989, P.L.320, No.54)
(v) Clinton County
(A) Replacement and relocation of Maintenance District 2-3 Facility to Bald Eagle Township
3,000,000
(Base Project Allocation - $3,000,000)
(B) New welcome center - For the construction of a welcome center serving both east and westbound traffic on Interstate 80 in Clinton County between Exits 24 and 25, including a 2,400 sq. ft. building, parking areas with connecting ramps, utilities, site lighting and landscaping
3,400,000
(Base Project Allocation - $3,000,000)
(Design and Contingencies - $400,000)
(vi) Columbia County
(A) Maintenance building
2,016,000
(Base Project Allocation - $1,680,000)
(Design and Contingencies - $336,000)
(vii) Erie County
(A) New welcome center
2,297,000
(Base Project Allocation - $1,841,000)
(Land Allocation - $80,000)
(Design and Contingencies - $376,000)
(viii) Elk County
(A) New county maintenance facility, District 2-8
3,600,000
(Base Project Allocation - $3,000,000)
(Design and Contingencies - $600,000)
(ix) Fayette County
(A) Bullskin Township - Relocate road due to flood control project being constructed by U.S. Soil Conservation Service
600,000
(Base Project Allocation - $500,000)
(Design and Contingencies - $100,000)
(x) Greene County
(A) Rest area and welcome center on Interstate 79, Site "D"
1,570,000
(Base Project Allocation - $1,300,000)
(Land Allocation - $10,000)
(Design and Contingencies - $260,000)
(xi) Lawrence County
(A) New Castle Airport Authority - Improvements to airport facilities
120,000
(Base Project Allocation - $100,000)
(Design and Contingencies - $20,000)
(xii) Monroe County
(A) Welcome center
720,000
(Base Project Allocation - $600,000)
(Design and Contingencies - $120,000)
(xiii) Montour County
(A) Satellite maintenance building
600,000
(Base Project Allocation - $500,000)
(Design and Contingencies - $100,000)
(B) For construction of transportation maintenance shed in the county
500,000
(Base Project Allocation - $500,000)
(xiv) Northampton County
(A) New welcome center
2,092,000
(Base Project Allocation - $1,674,000)
(Land Allocation - $75,000)
(Design and Contingencies - $343,000)
(xv) Northumberland County
(A) New county maintenance facility, District 3-4
3,600,000
(Base Project Allocation - $3,000,000)
(Design and Contingencies - $600,000)
(xvi) Perry County
(A) Addition and alterations to garage
515,000
(Base Project Allocation - $429,000)
(Design and Contingencies - $86,000)
(B) New county maintenance facility, District 8-9
3,600,000
(Base Project Allocation - $3,000,000)
(Design and Contingencies - $600,000)
(xvii) Pike County
(A) New welcome center
2,640,000
(Base Project Allocation - $2,000,000)
(Land Allocation - $200,000)
(Design and Contingencies - $440,000)
(xviii) Susquehanna County
(A) New welcome center
4,160,000
(Base Project Allocation - $3,360,000)
(Design and Contingencies - $800,000)
(B) New welcome center
4,800,000
(Base Project Allocation - $4,000,000)
(Design and Contingencies - $800,000)
(xix) Union County
(A) Construction of a welcome center at intersection of Interstate 80 and U.S. 15
2,400,000
(Base Project Allocation - $2,000,000)
(Design and Contingencies - $400,000)
(xx) Washington County
(A) New welcome center
2,298,000
(Base Project Allocation - $1,900,000)
(Land Allocation - $15,000)
(Design and Contingencies - $383,000)
(xxi) Port of Philadelphia
(A) Construct or purchase new paper warehouse at adjacent Piers 78-80
11,100,000
(Base Project Allocation - $11,100,000)
(B) Expansion of Tioga Fruit Shed
6,900,000
(Base Project Allocation - $6,900,000)
(C) Rehabilitation and replacement of container cranes
9,275,000
(Base Project Allocation - $8,439,000)
(Design and Contingencies - $836,000)
(D) Packer Avenue Marine Terminal improvements
3,741,000
(Base Project Allocation - $3,015,000)
(Design and Contingencies - $726,000)
(E) Dredging for Port of Philadelphia
550,000
(Base Project Allocation - $500,000)
(Design and Contingencies - $50,000)
(F) Expansion and improvement of the fruit shed on Piers 82-84
6,430,000
(Base Project Allocation - $4,993,000)
(Design and Contingencies - $1,437,000)
(G) Tioga Marine Terminal general improvements
2,118,000
(Base Project Allocation - $1,626,000)
(Design and Contingencies - $492,000)
(H) Improvements to Piers 96 and 98 Annex
2,412,000
(Base Project Allocation - $2,171,000)
(Design and Contingencies - $241,000)
(I) Piers 78-80 general improvements
7,682,000
(Base Project Allocation - $5,734,000)
(Design and Contingencies - $1,948,000)
(J) Construct or purchase new shed for cocoa beans
4,605,000
(Base Project Allocation - $3,744,000)
(Design and Contingencies - $861,000)
(K) Development of facilities necessary to handle passenger cruise ships
633,000
(Base Project Allocation - $500,000)
(Design and Contingencies - $133,000)
(L) Piers 38-40 general improvements
1,972,000
(Base Project Allocation - $1,360,000)
(Design and Contingencies - $612,000)
(M) Philadelphia central riverfront district on Delaware Avenue from Reed Street to Spring Garden Street for construction of street improvements for movement of vehicles and pedestrians, including a river walk
17,000,000
(Base Project Allocation - $17,000,000)
(xxii) Port of Erie
(A) Improvements to the Port of Erie
5,400,000
(Base Project Allocation - $5,400,000)
(xxiii) Allegheny County
(A) Road improvements on L.R.02247, including curbing, sidewalks, handicapped access cuts and guide rails to be performed by Verona Borough
150,000
(Base Project Allocation - $135,000)
(Design and Contingencies - $15,000)
(xxiv) Delaware County Port Corporation
(A) Dredging and other improvements
25,000,000
(Base Project Allocation - $25,000,000)
(xxv) Philadelphia County
(A) Installation of sound barriers on the west side of Interstate 95 between Catherine Street and Porter Street
5,000,000
(Base Project Allocation - $5,000,000)
Compiler's Note: The Department of Public Welfare, referred to in this section, was redesignated as the Department of Human Services by Act 132 of 2014.