Section 18. Centre County.
(a) Local Bridges
Local
State
(1) Snow Shoe Township, T-407, Pancake Road over North Fork of Beech Creek, Bridge Replacement, Bridge Key 44009, Project ID 95811
Project Allocation
1,082,000
(Base Project Allocation - $636,000)
(Land Allocation - $64,000)
(Design & Contingencies - $382,000)
(2) Snow Shoe Township, T-710, Kato Road over North Fork of Beech Creek, Bridge Replacement, Bridge Key 9837, Project ID 95386
Project Allocation
1,200,000
(Base Project Allocation - $600,000)
(Land Allocation - $150,000)
(Design & Contingencies - $450,000)
(3) Spring Township, T-384 over Branch of Logan Run, Bridge Replacement, Bridge Key 9838, Project ID 95387
Project Allocation
1,251,000
(Base Project Allocation - $625,000)
(Land Allocation - $157,000)
(Design & Contingencies - $469,000)
(4) Spring Township, T-423, Mann Road over Branch of Logan Run, Bridge Replacement, Bridge Key 41327, Project ID 95814
Project Allocation
1,082,000
(Base Project Allocation - $636,000)
(Land Allocation - $64,000)
(Design & Contingencies - $382,000)
(5) Spring Township, T-942, Coleville Road over Buffalo Run, Bridge Replacement, Bridge Key 9841, Project ID 95388
Project Allocation
1,200,000
(Base Project Allocation - $600,000)
(Land Allocation - $150,000)
(Design & Contingencies - $450,000)
(6) Walker Township, T-468, Rodgers Road over Roaring Run, Bridge Replacement, Bridge Key 9848, Project ID 95805
Project Allocation
1,082,000
(Base Project Allocation - $636,000)
(Land Allocation - $64,000)
(Design & Contingencies - $382,000)
(7) Worth Township, T-312, Shadydale Road over Laurel Run, Bridge Replacement, Bridge Key 9849, Project ID 95385
Project Allocation
1,200,000
(Base Project Allocation - $600,000)
(Land Allocation - $150,000)
(Design & Contingencies - $450,000)
(8) Snow Shoe Township, T-325, Gorton Road over Black Moshannon Creek, Bridge Replacement, Bridge Key 9835, Project ID 95802
Project Allocation
1,082,000
(Base Project Allocation - $636,000)
(Land Allocation - $64,000)
(Design & Contingencies - $382,000)
(9) Taylor Township, T-301, South Mountain Road over Big Fill Run, Bridge Replacement, Bridge Key 9842, Project ID 3185
Project Allocation
812,000
(Base Project Allocation - $266,000)
(Land Allocation - $14,000)
(Design & Contingencies - $532,000)
(10) Potter Township, T-609, Colyer Road over Sinking Creek, Bridge Replacement, Bridge Key 9833, Project ID 95804
Project Allocation
1,082,000
(Base Project Allocation - $636,000)
(Land Allocation - $64,000)
(Design & Contingencies - $382,000)
(11) Potter Township, T-537, Shunk Road over Sinking Creek, Bridge Replacement, Bridge Key 9832, Project ID 95803
Project Allocation
1,082,000
(Base Project Allocation - $636,000)
(Land Allocation - $64,000)
(Design & Contingencies - $382,000)
(12) Potter Township, T-536, Egg Hill Road over Sinking Creek, Bridge Replacement, Bridge Key 9831, Project ID 95389
Project Allocation
1,251,000
(Base Project Allocation - $625,000)
(Land Allocation - $157,000)
(Design & Contingencies - $469,000)
(13) Potter Township, T-518, Red Mill Road over Sinking Creek, Bridge Replacement, Bridge Key 9830, Project ID 95806
Project Allocation
1,082,000
(Base Project Allocation - $636,000)
(Land Allocation - $64,000)
(Design & Contingencies - $382,000)
(14) Penn Township, T-510 40 Feet from SR 2012 over Penns Creek, Bridge Replacement, Bridge Key 44336, Project ID 95816
Project Allocation
1,082,000
(Base Project Allocation - $636,000)
(Land Allocation - $64,000)
(Design & Contingencies - $382,000)
(15) Liberty Township, T-867 over Bald Eagle Creek, Bridge Replacement, Bridge Key 9821, Project ID 95800
Project Allocation
1,082,000
(Base Project Allocation - $636,000)
(Land Allocation - $64,000)
(Design & Contingencies - $382,000)
(16) Harris Township, T-943 over Spring Creek, Bridge Replacement, Bridge Key 9817, Project ID 95808
Project Allocation
1,082,000
(Base Project Allocation - $636,000)
(Land Allocation - $64,000)
(Design & Contingencies - $382,000)
(17) Haines Township, T-520, Quarry Road over Fiedler Run, Bridge Replacement, Bridge Key 40837, Project ID 95809
Project Allocation
1,082,000
(Base Project Allocation - $636,000)
(Land Allocation - $64,000)
(Design & Contingencies - $382,000)
(18) Gregg Township, T-449, Beaver Dam Road over Penns Creek, Bridge Replacement, Bridge Key 9809, Project ID 95807
Project Allocation
1,082,000
(Base Project Allocation - $636,000)
(Land Allocation - $64,000)
(Design & Contingencies - $382,000)
(19) Ferguson Township, T-307, Gatesburg Road over Halfmoon Creek, Bridge Replacement, Bridge Key 40814, Project ID 95817
Project Allocation
1,082,000
(Base Project Allocation - $636,000)
(Land Allocation - $64,000)
(Design & Contingencies - $382,000)
(20) Gregg Township, T-419 over Muddy Creek, Bridge Replacement, Bridge Key 9808, Project ID 95799
Project Allocation
1,082,000
(Base Project Allocation - $636,000)
(Land Allocation - $64,000)
(Design & Contingencies - $382,000)
(21) Miles Township, T-523, Back Road over Elk Creek, Bridge Replacement
Project Allocation
1,878,000
(Base Project Allocation - $1,300,000)
(Land Allocation - $78,000)
(Design & Contingencies - $500,000)
(22) Liberty Township, T-867, Eagleville Road over Bald Eagle Creek, Bridge Replacement
Project Allocation
4,200,000
(Base Project Allocation - $3,600,000)
(Land Allocation - $50,000)
(Design & Contingencies - $550,000)
(23) Various Municipalities, Various Local Bridges over Various Spans, Bridge Preservation
Project Allocation
1,100,000
(Base Project Allocation - $1,000,000)
(Design & Contingencies - $100,000)
(b) State Bridges
(1) (Reserved).
(2) SR 1002, Marsh Creek Road at Schencks Grove Road over Marsh Creek, Liberty Township, Bridge Replacement, Bridge Key 9587, Project ID 91418
Project Allocation
350,000
(Base Project Allocation - $350,000)
(3) SR 1002, Little Marsh Creek Road at Circle Road over Branch of Little Marsh Creek, Boggs Township, Bridge Restoration, Bridge Key 9577, Project ID 90243
Project Allocation
320,000
(Base Project Allocation - $320,000)
(4) SR 0550 over Buffalo Run, Benner Township, Bridge Replacement, Bridge Key 9555, Project ID 88248
Project Allocation
1,352,000
(Base Project Allocation - $795,000)
(Land Allocation - $80,000)
(Design & Contingencies - $477,000)
(5) SR 0504 1.0 Mile Southwest of Wingate over Tributary of Bald Eagle Creek, Union Township, Bridge Replacement, Bridge Key 9456, Project ID 88337
Project Allocation
1,352,000
(Base Project Allocation - $795,000)
(Land Allocation - $80,000)
(Design & Contingencies - $477,000)
(6) SR 0322 over Abandoned Railroad, Patton Township, Bridge Rehabilitation, Bridge Key 9493, Project ID 92740
Project Allocation
200,000
(Base Project Allocation - $200,000)
(7) SR 0504 over Dewitt Run, Union Township, Bridge Rehabilitation, Bridge Key 9545, Project ID 94960
Project Allocation
400,000
(Base Project Allocation - $400,000)
(8) SR 0504 over Dewitt Run, Union Township, Bridge Rehabilitation, Bridge Key 9545, Project ID 94974
Project Allocation
200,000
(Base Project Allocation - $200,000)
(9) SR 0445 over Branch of Elk Creek, Miles Township, Bridge Replacement, Bridge Key 9537, Project ID 88346
Project Allocation
1,352,000
(Base Project Allocation - $795,000)
(Land Allocation - $80,000)
(Design & Contingencies - $477,000)
(10) SR 0322 over Sinking Creek, Potter Township, Bridge Replacement, Bridge Key 9519, Project ID 88349
Project Allocation
1,352,000
(Base Project Allocation - $795,000)
(Land Allocation - $80,000)
(Design & Contingencies - $477,000)
(11) SR 0322 over Galbraith Gap Run, Harris Township, Bridge Replacement, Bridge Key 9514, Project ID 88188
Project Allocation
363,000
(Base Project Allocation - $101,000)
(Land Allocation - $201,000)
(Design & Contingencies - $61,000)
(12) SR 0322 over Galbraith Gap Run, Harris Township, Bridge Rehabilitation, Bridge Key 9514, Project ID 94959
Project Allocation
400,000
(Base Project Allocation - $400,000)
(13) SR 0550 over Buffalo Run, Patton Township, Bridge Replacement, Bridge Key 9553, Project ID 88367
Project Allocation
1,352,000
(Base Project Allocation - $795,000)
(Land Allocation - $80,000)
(Design & Contingencies - $477,000)
(14) SR 1002 over Marsh Creek, Liberty Township, Bridge Rehabilitation, Bridge Key 9588, Project ID 94974
Project Allocation
200,000
(Base Project Allocation - $200,000)
(15) SR 0504 Wingate over Tributary of Bald Eagle Creek, Union Township, Bridge Replacement, Bridge Key 9457, Project ID 88344
Project Allocation
946,000
(Base Project Allocation - $556,000)
(Land Allocation - $56,000)
(Design & Contingencies - $334,000)
(16) SR 1005 2.0 Miles North of Zion over Nittany Creek, Marion Township, Bridge Replacement, Bridge Key 9602, Project ID 91501
Project Allocation
801,000
(Base Project Allocation - $623,000)
(Land Allocation - $178,000)
(17) SR 0504 over Brower Hollow, Union Township, Bridge Rehabilitation, Bridge Key 9455, Project ID 3121
Project Allocation
181,000
(Base Project Allocation - $178,000)
(Design & Contingencies - $3,000)
(18) SR 0504 over Brower Hollow, Union Township, Bridge Replacement, Bridge Key 9455, Project ID 88345
Project Allocation
1,352,000
(Base Project Allocation - $795,000)
(Land Allocation - $80,000)
(Design & Contingencies - $477,000)
(19) SR 0504 Unionville Borough over Tributary of Bald Eagle Creek, Union Township, Bridge Replacement, Bridge Key 9452, Project ID 88250
Project Allocation
1,352,000
(Base Project Allocation - $795,000)
(Land Allocation - $80,000)
(Design & Contingencies - $477,000)
(20) SR 3040 over Dewitt Run, Unionville Borough, Bridge Replacement, Bridge Key 9451, Project ID 88199
Project Allocation
3,629,000
(Base Project Allocation - $2,314,000)
(Land Allocation - $247,000)
(Design & Contingencies - $1,068,000)
(21) SR 3040 over Tributary of Bald Eagle Creek, Huston Township, Bridge Replacement, Bridge Key 9448, Project ID 88336
Project Allocation
1,352,000
(Base Project Allocation - $795,000)
(Land Allocation - $80,000)
(Design & Contingencies - $477,000)
(22) SR 3040 over Laurel Run, Huston Township, Bridge Replacement, Bridge Key 9446, Project ID 88206
Project Allocation
3,319,000
(Base Project Allocation - $2,277,000)
(Land Allocation - $196,000)
(Design & Contingencies - $846,000)
(23) SR 3040 over Laurel Run, Huston Township, Bridge Rehabilitation, Bridge Key 9446, Project ID 94959
Project Allocation
400,000
(Base Project Allocation - $400,000)
(24) SR 3040 over Dix Run, Huston Township, Bridge Rehabilitation, Bridge Key 9445, Project ID 3121
Project Allocation
151,000
(Base Project Allocation - $149,000)
(Design & Contingencies - $2,000)
(25) SR 3040 over Dix Run, Huston Township, Bridge Replacement, Bridge Key 9445, Project ID 88225
Project Allocation
1,029,000
(Base Project Allocation - $532,000)
(Land Allocation - $142,000)
(Design & Contingencies - $355,000)
(26) SR 3040 4.0 Miles Northeast of Port Matilda over Mud Lick Run, Huston Township, Bridge Replacement, Bridge Key 9444, Project ID 88203
Project Allocation
954,000
(Base Project Allocation - $529,000)
(Land Allocation - $142,000)
(Design & Contingencies - $283,000)
(27) SR 0150 over Holt Hollow Run, Boggs Township, Bridge Replacement, Bridge Key 9466, Project ID 88222
Project Allocation
480,000
(Base Project Allocation - $198,000)
(Land Allocation - $180,000)
(Design & Contingencies - $102,000)
(28) SR 3011 1.0 Mile South of Lemont over Slab Cabin Run, College Township, Bridge Replacement, Bridge Key 9714, Project ID 88189
Project Allocation
317,000
(Base Project Allocation - $241,000)
(Land Allocation - $76,000)
(29) Panther Road 2,000 Feet North of T-710 over Wolf Run, Snow Shoe Township, Bridge Replacement, Bridge Key 9878, Project ID 3124
Project Allocation
604,000
(Base Project Allocation - $151,000)
(Land Allocation - $64,000)
(Design & Contingencies - $389,000)
(30) LR 864, Cassanova Road, Red Moshannon Bridge over Moshannon Creek, Rush Township, Bridge Restoration, Bridge Key 9790, Project ID 90243
Project Allocation
320,000
(Base Project Allocation - $320,000)
(31) SR 4005 Exit 147 Interchange over SR 0080, Snow Shoe Township, Bridge Replacement, Bridge Key 9789, Project ID 88127
Project Allocation
2,020,000
(Base Project Allocation - $1,590,000)
(Land Allocation - $239,000)
(Design & Contingencies - $191,000)
(32) SR 4004 1.5 Miles Southwest of Runville over Tributary of Wallace Run, Union Township, Bridge Rehabilitation, Bridge Key 9787, Project ID 3123
Project Allocation
58,000
(Base Project Allocation - $49,000)
(Land Allocation - $3,000)
(Design & Contingencies - $6,000)
(33) SR 4004 1.5 Miles Southwest of Runville over Tributary of Wallace Run, Union Township, Bridge Replacement, Bridge Key 9787, Project ID 91503
Project Allocation
956,000
(Base Project Allocation - $553,000)
(Land Allocation - $87,000)
(Design & Contingencies - $316,000)
(34) SR 4004 3.0 Miles West of Plum Grove over Tributary of Bush Hollow, Union Township, Bridge Replacement, Bridge Key 9782, Project ID 97596
Project Allocation
935,000
(Base Project Allocation - $560,000)
(Land Allocation - $120,000)
(Design & Contingencies - $255,000)
(35) SR 4002 Clarence over Little Sandy Run, Snow Shoe Township, Bridge Replacement, Bridge Key 9778, Project ID 91413
Project Allocation
2,484,000
(Base Project Allocation - $1,412,000)
(Land Allocation - $201,000)
(Design & Contingencies - $871,000)
(36) SR 3025 Hannah over Bell Hollow, Taylor Township, Bridge Replacement, Bridge Key 9749, Project ID 93254
Project Allocation
877,000
(Base Project Allocation - $419,000)
(Land Allocation - $167,000)
(Design & Contingencies - $291,000)
(37) SR 3021 3.0 Miles North of Martha Furnace over Williams Run, Huston Township, Bridge Replacement, Bridge Key 9740, Project ID 101495
Project Allocation
1,162,000
(Base Project Allocation - $611,000)
(Land Allocation - $184,000)
(Design & Contingencies - $367,000)
(38) SR 3014 over Slab Cabin Run, State College Borough, Bridge Replacement, Bridge Key 9730, Project ID 88235
Project Allocation
4,423,000
(Base Project Allocation - $3,653,000)
(Land Allocation - $145,000)
(Design & Contingencies - $625,000)
(39) SR 3014 over Slab Cabin Run, State College Borough, Bridge Rehabilitation, Bridge Key 9730, Project ID 94960
Project Allocation
1,001,000
(Base Project Allocation - $1,001,000)
(40) SR 1005 1.0 Mile North of Zion over Nittany Creek, Walker Township, Bridge Replacement, Bridge Key 9599, Project ID 101516
Project Allocation
1,089,000
(Base Project Allocation - $415,000)
(Land Allocation - $156,000)
(Design & Contingencies - $518,000)
(41) SR 3011, Houserville Road over Spring Creek, College Township, Bridge Restoration, Bridge Key 9718, Project ID 90244
Project Allocation
400,000
(Base Project Allocation - $400,000)
(42) SR 1005 Zion Road over Tributary of Nittany Creek, Walker Township, Bridge Replacement, Bridge Key 9597, Project ID 88568
Project Allocation
1,151,000
(Base Project Allocation - $885,000)
(Land Allocation - $177,000)
(Design & Contingencies - $89,000)
(43) SR 3010 Lemont over Spring Creek, College Township, Bridge Replacement, Bridge Key 9710, Project ID 88211
Project Allocation
483,000
(Base Project Allocation - $200,000)
(Land Allocation - $177,000)
(Design & Contingencies - $89,000)
(44) SR 2010 2.0 Miles North of Potters Mills over Branch of Muddy Run, Potter Township, Bridge Replacement, Bridge Key 9639, Project ID 93332
Project Allocation
912,000
(Base Project Allocation - $570,000)
(Land Allocation - $82,000)
(Design & Contingencies - $260,000)
(45) SR 2007 Penn Hall over Branch of Spruce Creek, Gregg Township, Bridge Rehabilitation, Bridge Key 9633, Project ID 3121
Project Allocation
283,000
(Base Project Allocation - $279,000)
(Design & Contingencies - $4,000)
(46) SR 2007 Penn Hall over Branch of Spruce Creek, Gregg Township, Bridge Replacement, Bridge Key 9633, Project ID 91502
Project Allocation
765,000
(Base Project Allocation - $646,000)
(Land Allocation - $119,000)
(47) SR 2007, Brush Mountain Road North of PA 45 over Branch of Spruce Creek, Gregg Township, Bridge Restoration, Bridge Key 9631, Project ID 90243
Project Allocation
320,000
(Base Project Allocation - $320,000)
(48) SR 2006 over Hayes Run, Harris Township, Bridge Replacement, Bridge Key 9630, Project ID 93268
Project Allocation
500,000
(Design & Contingencies - $500,000)
(49) SR 2005 Spring Mills over Sinking Creek, Gregg Township, Bridge Replacement, Bridge Key 9625, Project ID 91500
Project Allocation
4,654,000
(Base Project Allocation - $3,508,000)
(Land Allocation - $215,000)
(Design & Contingencies - $931,000)
(50) SR 1006 Milesburg over Tributary of Bald Eagle Creek, Boggs Township, Bridge Replacement, Bridge Key 9604, Project ID 91416
Project Allocation
515,000
(Base Project Allocation - $172,000)
(Design & Contingencies - $343,000)
(51) SR 1006 1.0 Mile East of Milesburg over Nittany Creek, Boggs Township, Bridge Replacement, Bridge Key 9605, Project ID 91414
Project Allocation
600,000
(Base Project Allocation - $600,000)
(52) SR 1005, Forest Avenue at Betty Lane over Nittany Creek, Walker Township, Bridge Replacement, Bridge Key 9600, Project ID 92422
Project Allocation
620,000
(Base Project Allocation - $600,000)
(Design & Contingencies - $20,000)
(53) SR 3040 3.0 Miles North of Port Matilda over Williams Run, Huston Township, Bridge Rehabilitation, Bridge Key 9443, Project ID 88343
Project Allocation
200,000
(Base Project Allocation - $200,000)
(54) SR 3014 over SR 0099, Patton Township, Bridge Replacement, Bridge Key 9722, Project ID 88353
Project Allocation
1,000,000
(Base Project Allocation - $1,000,000)
(55) SR 0045 over Roaring Run, Harris Township, Bridge Replacement, Bridge Key 9238, Project ID 88360
Project Allocation
1,352,000
(Base Project Allocation - $795,000)
(Land Allocation - $80,000)
(Design & Contingencies - $477,000)
(56) SR 0144 over Gap Run, Spring Township, Bridge Replacement, Bridge Key 9345, Project ID 88354
Project Allocation
1,352,000
(Base Project Allocation - $795,000)
(Land Allocation - $80,000)
(Design & Contingencies - $477,000)
(57) SR 0144 over Gap Run, Spring Township, Bridge Rehabilitation, Bridge Key 9345, Project ID 94960
Project Allocation
250,000
(Base Project Allocation - $250,000)
(58) SR 0144 over Branch of Gap Run, Spring Township, Bridge Replacement, Bridge Key 9342, Project ID 88242
Project Allocation
951,000
(Base Project Allocation - $475,000)
(Land Allocation - $159,000)
(Design & Contingencies - $317,000)
(59) SR 0144 over Branch of Gap Run, Spring Township, Bridge Replacement, Bridge Key 9339, Project ID 88238
Project Allocation
850,000
(Base Project Allocation - $340,000)
(Land Allocation - $170,000)
(Design & Contingencies - $340,000)
(60) I-80 Westbound over PA 26, Marion Township, Bridge Restoration, Bridge Key 9317, Project ID 90240
Project Allocation
806,000
(Base Project Allocation - $806,000)
(61) I-80 Eastbound over PA 26, Marion Township, Bridge Restoration, Bridge Key 9316, Project ID 90240
Project Allocation
714,000
(Base Project Allocation - $714,000)
(62) SR 0064 Lamar over Little Fishing Creek, Walker Township, Bridge Rehabilitation, Bridge Key 9284, Project ID 94972
Project Allocation
443,000
(Base Project Allocation - $177,000)
(Design & Contingencies - $266,000)
(63) SR 0064 Hubersburg over Little Fishing Creek, Walker Township, Bridge Rehabilitation, Bridge Key 9276, Project ID 3123
Project Allocation
166,000
(Base Project Allocation - $141,000)
(Land Allocation - $8,000)
(Design & Contingencies - $17,000)
(64) SR 0144 over Branch of Logan Creek, Spring Township, Bridge Replacement, Bridge Key 9347, Project ID 88253
Project Allocation
946,000
(Base Project Allocation - $556,000)
(Land Allocation - $56,000)
(Design & Contingencies - $334,000)
(65) SR 0045 over Elk Creek, Millheim Borough, Bridge Rehabilitation, Bridge Key 9258, Project ID 94957
Project Allocation
200,000
(Base Project Allocation - $200,000)
(66) SR 0045 over Pine Creek, Haines Township, Bridge Replacement, Bridge Key 9265, Project ID 88201
Project Allocation
2,666,000
(Base Project Allocation - $1,874,000)
(Land Allocation - $149,000)
(Design & Contingencies - $643,000)
(67) SR 0026 over Bald Eagle Creek, Howard Township, Bridge Replacement, Bridge Key 9233, Project ID 93262
Project Allocation
192,000
(Base Project Allocation - $176,000)
(Land Allocation - $8,000)
(Design & Contingencies - $8,000)
(68) SR 0026 over Nittany and Bald Eagle Railroad, Howard Borough, Bridge Replacement, Bridge Key 9232, Project ID 88169
Project Allocation
1,625,000
(Base Project Allocation - $1,219,000)
(Land Allocation - $92,000)
(Design & Contingencies - $314,000)
(69) SR 0026 over Nittany and Bald Eagle Railroad, Howard Borough, Bridge Rehabilitation, Bridge Key 9232, Project ID 94960
Project Allocation
497,000
(Base Project Allocation - $497,000)
(70) SR 0026 over Lick Run, Marion Township, Bridge Replacement, Bridge Key 9231, Project ID 99872
Project Allocation
770,000
(Base Project Allocation - $342,000)
(Land Allocation - $86,000)
(Design & Contingencies - $342,000)
(71) SR 0026 over Branch of Lick Run, Marion Township, Bridge Replacement, Bridge Key 9229, Project ID 88364
Project Allocation
1,352,000
(Base Project Allocation - $795,000)
(Land Allocation - $80,000)
(Design & Contingencies - $477,000)
(72) PA 26 over Tributary of Slab Cabin Run, College Township, Bridge Restoration, Bridge Key 9201, Project ID 90242
Project Allocation
530,000
(Base Project Allocation - $530,000)
(73) SR 3040 1.0 Mile East of Martha Furnace over Steel Hollow Run, Huston Township, Bridge Replacement, Bridge Key 9442, Project ID 88356
Project Allocation
457,000
(Base Project Allocation - $167,000)
(Land Allocation - $167,000)
(Design & Contingencies - $123,000)
(74) SR 2005 Spring Mills over Sinking Creek, Gregg Township, Bridge Rehabilitation, Bridge Key 9625, Project ID 3121
Project Allocation
739,000
(Base Project Allocation - $729,000)
(Design & Contingencies - $10,000)
(75) SR 0045 over Branch of Pine Creek, Haines Township, Bridge Replacement, Bridge Key 9262, Project ID 88333
Project Allocation
946,000
(Base Project Allocation - $556,000)
(Land Allocation - $56,000)
(Design & Contingencies - $334,000)
(76) SR 0150 over Prison Road, Benner Township, Bridge Replacement, Bridge Key 9376, Project ID 88233
Project Allocation
1,026,000
(Base Project Allocation - $532,000)
(Land Allocation - $152,000)
(Design & Contingencies - $342,000)
(77) SR 0220 over Reese Hollow, Worth Township, Bridge Rehabilitation, Bridge Key 9428, Project ID 88179
Project Allocation
345,000
(Base Project Allocation - $162,000)
(Land Allocation - $135,000)
(Design & Contingencies - $48,000)
(78) SR 0220 over Branch of Bald Eagle Creek, Worth Township, Bridge Replacement, Bridge Key 9429, Project ID 88228
Project Allocation
850,000
(Base Project Allocation - $340,000)
(Land Allocation - $170,000)
(Design & Contingencies - $340,000)
(79) SR 0045 over Elk Creek, Millheim Borough, Bridge Replacement, Bridge Key 9258, Project ID 88193
Project Allocation
675,000
(Base Project Allocation - $301,000)
(Land Allocation - $241,000)
(Design & Contingencies - $133,000)
(80) SR 0144 over Irish Hollow, Spring Township, Bridge Rehabilitation, Bridge Key 9356, Project ID 94960
Project Allocation
200,000
(Base Project Allocation - $200,000)
(81) SR 0220 over Branch of Bald Eagle Creek, Taylor Township, Bridge Replacement, Bridge Key 9426, Project ID 88368
Project Allocation
1,352,000
(Base Project Allocation - $795,000)
(Land Allocation - $80,000)
(Design & Contingencies - $477,000)
(82) SR 0220 over Sparrow Run, Taylor Township, Bridge Replacement, Bridge Key 9425, Project ID 88187
Project Allocation
425,000
(Base Project Allocation - $111,000)
(Land Allocation - $232,000)
(Design & Contingencies - $82,000)
(83) SR 0220 over Vaughns Run, Taylor Township, Bridge Rehabilitation, Bridge Key 9424, Project ID 88179
Project Allocation
345,000
(Base Project Allocation - $162,000)
(Land Allocation - $135,000)
(Design & Contingencies - $48,000)
(84) SR 0150 over Branch of Logan Creek, Bellefonte Borough, Bridge Replacement, Bridge Key 9379, Project ID 88362
Project Allocation
1,352,000
(Base Project Allocation - $795,000)
(Land Allocation - $80,000)
(Design & Contingencies - $477,000)
(85) SR 0144 over South Fork of Beech Creek, Snow Shoe Township, Bridge Replacement, Bridge Key 9374, Project ID 88170
Project Allocation
2,880,000
(Base Project Allocation - $2,200,000)
(Land Allocation - $100,000)
(Design & Contingencies - $580,000)
(86) SR 0144 over Tributary of Wallace Run, Boggs Township, Bridge Replacement, Bridge Key 9372, Project ID 98881
Project Allocation
1,480,000
(Base Project Allocation - $800,000)
(Land Allocation - $100,000)
(Design & Contingencies - $580,000)
(87) SR 0144 over Yocum Run, Spring Township, Bridge Replacement, Bridge Key 9360, Project ID 88155
Project Allocation
3,787,000
(Base Project Allocation - $2,445,000)
(Land Allocation - $252,000)
(Design & Contingencies - $1,090,000)
(88) SR 0144 3.0 Miles South of Bellefonte over Irish Hollow, Spring Township, Bridge Rehabilitation, Bridge Key 9356, Project ID 94957
Project Allocation
200,000
(Base Project Allocation - $200,000)
(89) SR 0144 over Irish Hollow, Spring Township, Bridge Replacement, Bridge Key 9356, Project ID 88196
Project Allocation
852,000
(Base Project Allocation - $464,000)
(Land Allocation - $78,000)
(Design & Contingencies - $310,000)
(90) SR 0220 over Vaughns Run, Taylor Township, Bridge Replacement, Bridge Key 9424, Project ID 88184
Project Allocation
477,000
(Base Project Allocation - $147,000)
(Land Allocation - $244,000)
(Design & Contingencies - $86,000)
(91) PA 144 over Yocum Run, Spring Township, Bridge Replacement, Bridge Key 9360, Project ID 90243
Project Allocation
630,000
(Base Project Allocation - $430,000)
(Land Allocation - $150,000)
(Design & Contingencies - $50,000)
(92) SR 3040 over Ardery Run, Huston Township, Bridge Rehabilitation, Bridge Key 9440, Project ID 94972
Project Allocation
443,000
(Base Project Allocation - $177,000)
(Design & Contingencies - $266,000)
(93) SR 0144 over Yocum Run, Spring Township, Bridge Replacement, Bridge Key 9360, Project ID 86921
Project Allocation
295,000
(Base Project Allocation - $259,000)
(Design & Contingencies - $36,000)
(94) SR 0144 over Bald Eagle Creek, Milesburg Borough, Bridge Rehabilitation, Bridge Key 9361, Project ID 69434
Project Allocation
447,000
(Base Project Allocation - $387,000)
(Land Allocation - $60,000)
(95) SR 0144, PA 144 Northbound over SEDACOG Joint Rail Authority and Nittany and Bald Eagle Railroad, Boggs Township, Bridge Replacement, Bridge Key 9362, Project ID 99914
Project Allocation
306,000
(Base Project Allocation - $306,000)
(96) SR 0144, PA 144 Southbound over SEDACOG Joint Rail Authority and Nittany and Bald Eagle Railroad, Boggs Township, Bridge Replacement, Bridge Key 9364, Project ID 99914
Project Allocation
306,000
(Base Project Allocation - $306,000)
(97) SR 0144 over Tributary of Wallace Run, Boggs Township, Bridge Replacement, Bridge Key 9367, Project ID 88338
Project Allocation
1,352,000
(Base Project Allocation - $795,000)
(Land Allocation - $80,000)
(Design & Contingencies - $477,000)
(98) SR 0099 over Blue Springs Hollow Road, Taylor Township, Bridge Rehabilitation, Bridge Key 43988, Project ID 91586
Project Allocation
100,000
(Base Project Allocation - $100,000)
(99) SR 0144 over Beech Creek, Milesburg Borough, Bridge Replacement
Project Allocation
446,000
(Base Project Allocation - $386,000)
(Land Allocation - $60,000)
(100) Various State-Owned Bridges over Various Spans, Various Municipalities, Bridge Preservation, Bridge Key 0, Project ID 0
Project Allocation
1,100,000
(Base Project Allocation - $1,000,000)
(Design & Contingencies - $100,000)