Act 127 of 2014, § 21, under HIGHWAY-RAILROAD AND HIGHWAY BRIDGE CAPITAL BUDGET SUPPLEMENTAL ACT FOR 2014-2015 - ENACTMENT.

Act 127 of 2014, § 21

Section 21. Clearfield County.

(a) Local Bridges

Local

State

(1) Lawrence Township, T-209, Thompson Road over Lick Run, Bridge Replacement, Bridge Key 11934, Project ID 96014

Project Allocation

1,352,000

(Base Project Allocation - $795,000)

(Land Allocation - $80,000)

(Design & Contingencies - $477,000)

(2) Woodward Township, SR 7230 over Beaver Run, Bridge Replacement, Bridge Key 0, Project ID 95999

Project Allocation

850,000

(Base Project Allocation - $500,000)

(Land Allocation - $50,000)

(Design & Contingencies - $300,000)

(3) Union Township, T-899 150 Feet Southeast of SR 4013 over Branch of Laborde Creek, Bridge Replacement, Bridge Key 11956, Project ID 95991

Project Allocation

1,352,000

(Base Project Allocation - $795,000)

(Land Allocation - $80,000)

(Design & Contingencies - $477,000)

(4) Sandy Township, T-350, Larkeytown Road over Sandy Lick Creek, Bridge Replacement, Bridge Key 11948, Project ID 95998

Project Allocation

1,352,000

(Base Project Allocation - $795,000)

(Land Allocation - $80,000)

(Design & Contingencies - $477,000)

(5) Sandy Township, Murry Road, Luthersburg Bridge over Sandy Lick Creek, Bridge Replacement, Bridge Key 11953, Project ID 3429

Project Allocation

961,000

(Base Project Allocation - $437,000)

(Land Allocation - $25,000)

(Design & Contingencies - $499,000)

(6) Lawrence Township, T-389 Paradise School Road over Moose Creek, Bridge Replacement, Bridge Key 11935, Project ID 96012

Project Allocation

1,352,000

(Base Project Allocation - $795,000)

(Land Allocation - $80,000)

(Design & Contingencies - $477,000)

(7) Irvona Borough, Hopkins Street 1,000 Feet Southwest of SR 3005 over North Witmer Run, Bridge Replacement, Bridge Key 11971, Project ID 96016

Project Allocation

1,352,000

(Base Project Allocation - $795,000)

(Land Allocation - $80,000)

(Design & Contingencies - $477,000)

(8) Bradford Township, T-507 over Jake Run, Bridge Replacement, Bridge Key 11893, Project ID 96000

Project Allocation

1,352,000

(Base Project Allocation - $795,000)

(Land Allocation - $80,000)

(Design & Contingencies - $477,000)

(9) Knox Township, T-566, Kellytown Road 1.5 Miles East of SR 0453 over Clearfield Creek, Bridge Replacement, Bridge Key 11930, Project ID 95990

Project Allocation

1,352,000

(Base Project Allocation - $795,000)

(Land Allocation - $80,000)

(Design & Contingencies - $477,000)

(10) Lawrence Township, T-507 over Montgomery Creek, Bridge Replacement, Bridge Key 11936, Project ID 96015

Project Allocation

1,352,000

(Base Project Allocation - $795,000)

(Land Allocation - $80,000)

(Design & Contingencies - $477,000)

(11) Houtzdale Borough, Don Street 300 Feet Northwest of SR 0053 over Beaver Run, Bridge Replacement, Bridge Key 11969, Project ID 95995

Project Allocation

1,352,000

(Base Project Allocation - $795,000)

(Land Allocation - $80,000)

(Design & Contingencies - $477,000)

(12) Huston Township, T-527, Laurel Run Road 1.0 Mile East of SR 0153 over Laurel Run, Bridge Replacement, Bridge Key 11923, Project ID 96006

Project Allocation

1,352,000

(Base Project Allocation - $795,000)

(Land Allocation - $80,000)

(Design & Contingencies - $477,000)

(13) Brady Township, T-338, Kellar Road 600 Feet South of T-353 over East Branch of Mahoning Creek, Bridge Replacement, Bridge Key 11894, Project ID 3414

Project Allocation

1,001,000

(Base Project Allocation - $429,000)

(Land Allocation - $29,000)

(Design & Contingencies - $543,000)

(14) Brady Township, T-346, Haag Road 0.3 Mile South of SR 4003 over Stump Creek, Bridge Replacement, Bridge Key 11895, Project ID 95994

Project Allocation

1,352,000

(Base Project Allocation - $795,000)

(Land Allocation - $80,000)

(Design & Contingencies - $477,000)

(15) Covington Township, Red Wing Road, T-640 1,000 Feet North of SR 0879 over Sandy Creek, Bridge Replacement, Bridge Key 11906, Project ID 96018

Project Allocation

1,352,000

(Base Project Allocation - $795,000)

(Land Allocation - $80,000)

(Design & Contingencies - $477,000)

(16) Huston Township, Diamond Street, T-519 0.5 Mile North of SR 0255 over Mountain Run, Bridge Replacement, Bridge Key 11922, Project ID 96010

Project Allocation

1,051,000

(Base Project Allocation - $382,000)

(Land Allocation - $96,000)

(Design & Contingencies - $573,000)

(17) City of DuBois, 4th Street 500 Feet South of Maple Avenue over Reasinger Run, Bridge Replacement, Bridge Key 11958, Project ID 3644

Project Allocation

542,000

(Base Project Allocation - $46,000)

(Land Allocation - $7,000)

(Design & Contingencies - $489,000)

(18) City of DuBois, T-1207 over Pentz Run, Bridge Replacement

Project Allocation

759,000

(Base Project Allocation - $632,000)

(Design & Contingencies - $127,000)

(19) Lawrence Township, T-1224 over R.J. Corman Railroad, Bridge Replacement

Project Allocation

917,000

(Base Project Allocation - $764,000)

(Design & Contingencies - $153,000)

(20) Curwensville Borough, T-1805 over Anderson Creek, Bridge Replacement

Project Allocation

1,628,000

(Base Project Allocation - $1,356,000)

(Design & Contingencies - $272,000)

(21) City of DuBois, T-1912 over Sandy Lick Creek, Bridge Replacement

Project Allocation

917,000

(Base Project Allocation - $764,000)

(Design & Contingencies - $153,000)

(22) Bigler Township, T-203 over Bigler Run, Bridge Replacement

Project Allocation

624,000

(Base Project Allocation - $520,000)

(Design & Contingencies - $104,000)

(23) Pike Township, T-207 over Kratzer Run, Bridge Replacement

Project Allocation

647,000

(Base Project Allocation - $539,000)

(Design & Contingencies - $108,000)

(24) Curwensville Borough, T-213 over West Branch of Susquehanna River, Bridge Replacement

Project Allocation

3,737,000

(Base Project Allocation - $3,114,000)

(Design & Contingencies - $623,000)

(25) Curwensville Borough, T-215 over R.J. Corman Railroad, Bridge Replacement

Project Allocation

1,650,000

(Base Project Allocation - $1,375,000)

(Design & Contingencies - $275,000)

(26) City of DuBois, T-218 over McCracken Run, Bridge Replacement

Project Allocation

800,000

(Base Project Allocation - $666,000)

(Design & Contingencies - $134,000)

(27) City of DuBois, T-2305 over Pentz Run, Bridge Replacement

Project Allocation

632,000

(Base Project Allocation - $526,000)

(Design & Contingencies - $106,000)

(28) City of DuBois, T-2308 over Pentz Run, Bridge Replacement

Project Allocation

699,000

(Base Project Allocation - $582,000)

(Design & Contingencies - $117,000)

(29) Burnside Township, T-306 over Branch of Beaver Run, Bridge Replacement

Project Allocation

641,000

(Base Project Allocation - $534,000)

(Design & Contingencies - $107,000)

(30) Burnside Township, T-315 over West Branch of Susquehanna River, Bridge Replacement

Project Allocation

2,460,000

(Base Project Allocation - $2,050,000)

(Design & Contingencies - $410,000)

(31) Bell Township, T-322 over West Branch of Susquehanna River, Bridge Replacement

Project Allocation

1,080,000

(Base Project Allocation - $900,000)

(Design & Contingencies - $180,000)

(32) Burnside Township, T-331 over Beaver Run, Bridge Replacement

Project Allocation

576,000

(Base Project Allocation - $480,000)

(Design & Contingencies - $96,000)

(33) Burnside Township, T-331 over Beaver Run, Bridge Replacement

Project Allocation

632,000

(Base Project Allocation - $526,000)

(Design & Contingencies - $106,000)

(34) Bell Township, T-332 over Curry Run, Bridge Replacement

Project Allocation

606,000

(Base Project Allocation - $505,000)

(Design & Contingencies - $101,000)

(35) Burnside Township, T-333 over Beaver Run, Bridge Replacement

Project Allocation

645,000

(Base Project Allocation - $537,000)

(Design & Contingencies - $108,000)

(36) Penn Township, T-335 over Curry Run, Bridge Replacement

Project Allocation

692,000

(Base Project Allocation - $576,000)

(Design & Contingencies - $116,000)

(37) (Reserved).

(38) Curwensville Borough, T-419 over Beaver Run, Bridge Replacement

Project Allocation

764,000

(Base Project Allocation - $636,000)

(Design & Contingencies - $128,000)

(39) Jordan Township, T-430 over Green Run, Bridge Replacement

Project Allocation

522,000

(Base Project Allocation - $435,000)

(Design & Contingencies - $87,000)

(40) Penn Township, T-463 over Bell Run, Bridge Replacement

Project Allocation

635,000

(Base Project Allocation - $529,000)

(Design & Contingencies - $106,000)

(41) Penn Township, T-483 over Kratzer Run, Bridge Replacement

Project Allocation

755,000

(Base Project Allocation - $629,000)

(Design & Contingencies - $126,000)

(42) Sandy Township, T-525 over Anderson Creek, Bridge Replacement

Project Allocation

773,000

(Base Project Allocation - $644,000)

(Design & Contingencies - $129,000)

(43) Knox Township, T-565 over Potts Run, Bridge Replacement

Project Allocation

593,000

(Base Project Allocation - $494,000)

(Design & Contingencies - $99,000)

(44) Knox Township, T-566 over Potts Run, Bridge Replacement

Project Allocation

660,000

(Base Project Allocation - $550,000)

(Design & Contingencies - $110,000)

(45) Lawrence Township, T-599 over Lick Run, Bridge Replacement

Project Allocation

641,000

(Base Project Allocation - $534,000)

(Design & Contingencies - $107,000)

(46) City of DuBois, T-614 over Pentz Run, Bridge Replacement

Project Allocation

606,000

(Base Project Allocation - $505,000)

(Design & Contingencies - $101,000)

(47) Covington Township, T-637 over Deer Creek, Bridge Replacement

Project Allocation

710,000

(Base Project Allocation - $591,000)

(Design & Contingencies - $119,000)

(48) Curwensville Borough, T-704 over Beaver Run, Bridge Replacement

Project Allocation

723,000

(Base Project Allocation - $602,000)

(Design & Contingencies - $121,000)

(49) Covington Township, T-729 over Sandy Creek, Bridge Replacement

Project Allocation

630,000

(Base Project Allocation - $525,000)

(Design & Contingencies - $105,000)

(50) Cooper Township, T-733 over Moshannon Creek, Bridge Replacement

Project Allocation

1,206,000

(Base Project Allocation - $1,005,000)

(Design & Contingencies - $201,000)

(51) Woodward Township, T-785 over Beaver Run, Bridge Replacement

Project Allocation

611,000

(Base Project Allocation - $509,000)

(Design & Contingencies - $102,000)

(52) Sandy Township, T-854 over Narrows Creek, Bridge Replacement

Project Allocation

606,000

(Base Project Allocation - $505,000)

(Design & Contingencies - $101,000)

(53) Various Municipalities, Various Local Bridges over Various Spans, Bridge Preservation, Bridge Key 0, Project ID 0

Project Allocation

1,100,000

(Base Project Allocation - $1,000,000)

(Design & Contingencies - $100,000)

(b) State Bridges

(1) SR 0255 2.0 Miles Southwest of Penfield over Branch of Bennett Creek, Huston Township, Bridge Rehabilitation, Bridge Key 11454, Project ID 3439

Project Allocation

79,000

(Base Project Allocation - $42,000)

(Land Allocation - $3,000)

(Design & Contingencies - $34,000)

(2) SR 0729 over West Branch of Susquehanna River, Ferguson Township, Bridge Rehabilitation, Bridge Key 11530, Project ID 83040

Project Allocation

1,552,000

(Base Project Allocation - $739,000)

(Land Allocation - $148,000)

(Design & Contingencies - $665,000)

(3) SR 0729 over Campbell Run, Ferguson Township, Bridge Rehabilitation, Bridge Key 11528, Project ID 3439

Project Allocation

45,000

(Base Project Allocation - $24,000)

(Land Allocation - $2,000)

(Design & Contingencies - $19,000)

(4) SR 0729 over Clearfield Creek, Glen Hope Borough, Bridge Rehabilitation, Bridge Key 11525, Project ID 3439

Project Allocation

9,000

(Base Project Allocation - $4,000)

(Land Allocation - $1,000)

(Design & Contingencies - $4,000)

(5) SR 0322 Philipsburg over Laurel Run, Decatur Township, Bridge Rehabilitation, Bridge Key 11494, Project ID 88173

Project Allocation

418,000

(Base Project Allocation - $418,000)

(6) Diamond Street, T-519 0.5 Mile North of SR 0255 over Mountain Run, Huston Township, Bridge Replacement, Bridge Key 11922, Project ID 95986

Project Allocation

800,000

(Base Project Allocation - $800,000)

(7) SR 0879 Clearfield over R. J. Corman Railroad and West Branch of Susquehanna River, Lawrence Township, Bridge Replacement, Bridge Key 11567, Project ID 3659

Project Allocation

112,000

(Base Project Allocation - $104,000)

(Land Allocation - $1,000)

(Design & Contingencies - $7,000)

(8) Lost Run Road 1.0 Mile Northwest of Caledonia Park over Gifford Run, Girard Township, Bridge Replacement, Bridge Key 11982, Project ID 3607

Project Allocation

679,000

(Base Project Allocation - $205,000)

(Land Allocation - $66,000)

(Design & Contingencies - $408,000)

(9) SR 1011 over R. J. Corman Railroad and West Branch of Susquehanna River, Cooper Township, Bridge Replacement, Bridge Key 11667, Project ID 91174

Project Allocation

6,240,000

(Base Project Allocation - $6,240,000)

(10) SR 0255 2.0 Miles Southwest of Penfield over Branch of Bennett Creek, Huston Township, Bridge Replacement, Bridge Key 11454, Project ID 93372

Project Allocation

2,802,000

(Base Project Allocation - $1,556,000)

(Land Allocation - $234,000)

(Design & Contingencies - $1,012,000)

(11) SR 0255 3.0 Miles Southwest of Penfield over Heath Run, Huston Township, Bridge Rehabilitation, Bridge Key 11452, Project ID 3439

Project Allocation

102,000

(Base Project Allocation - $55,000)

(Land Allocation - $4,000)

(Design & Contingencies - $43,000)

(12) SR 0253 Allemans over Little Muddy Run, Gulich Township, Bridge Rehabilitation, Bridge Key 11432, Project ID 3439

Project Allocation

55,000

(Base Project Allocation - $29,000)

(Land Allocation - $3,000)

(Design & Contingencies - $23,000)

(13) SR 0219 Grampian over Kratzer Run, Penn Township, Bridge Rehabilitation, Bridge Key 11409, Project ID 69455

Project Allocation

214,000

(Base Project Allocation - $168,000)

(Land Allocation - $8,000)

(Design & Contingencies - $38,000)

(14) SR 0219 Grampian over Kratzer Run, Penn Township, Bridge Rehabilitation, Bridge Key 11408, Project ID 69455

Project Allocation

208,000

(Base Project Allocation - $163,000)

(Land Allocation - $8,000)

(Design & Contingencies - $37,000)

(15) SR 0255 2.0 Miles Southwest of Penfield over Branch of Bennett Creek, Huston Township, Bridge Replacement, Bridge Key 11455, Project ID 69475

Project Allocation

1,504,000

(Base Project Allocation - $1,074,000)

(Land Allocation - $179,000)

(Design & Contingencies - $251,000)

(16) SR 0879 Shawville over Trout Run, Goshen Township, Bridge Replacement, Bridge Key 11574, Project ID 0

Project Allocation

205,000

(Base Project Allocation - $192,000)

(Land Allocation - $3,000)

(Design & Contingencies - $10,000)

(17) SR 1006 2.0 Miles North of Clearfield over Lick Run, Goshen Township, Bridge Replacement, Bridge Key 11653, Project ID 93939

Project Allocation

620,000

(Base Project Allocation - $248,000)

(Design & Contingencies - $372,000)

(18) SR 1011 over Rolling Stone Run, Cooper Township, Bridge Replacement, Bridge Key 11666, Project ID 95780

Project Allocation

831,000

(Base Project Allocation - $470,000)

(Land Allocation - $79,000)

(Design & Contingencies - $282,000)

(19) TR 300 1.0 Mile West of Houtzdale over Beaver Run, Woodward Township, Bridge Rehabilitation, Bridge Key 11710, Project ID 96558

Project Allocation

52,000

(Base Project Allocation - $50,000)

(Design & Contingencies - $2,000)

(20) SR 2013 over Beaver Run, Woodward Township, Bridge Rehabilitation, Bridge Key 11710, Project ID 69455

Project Allocation

260,000

(Base Project Allocation - $204,000)

(Land Allocation - $10,000)

(Design & Contingencies - $46,000)

(21) (Reserved).

(22) SR 0219 Bells Landing over Bell Run, Greenwood Township, Bridge Replacement, Bridge Key 11404, Project ID 93323

Project Allocation

3,671,000

(Base Project Allocation - $2,538,000)

(Land Allocation - $213,000)

(Design & Contingencies - $920,000)

(23) SR 2030 over Alder Run, Graham Township, Bridge Replacement, Bridge Key 11754, Project ID 88208

Project Allocation

750,000

(Base Project Allocation - $300,000)

(Land Allocation - $150,000)

(Design & Contingencies - $300,000)

(24) SR 2041 over Baileys Run, Lawrence Township, Bridge Replacement, Bridge Key 11771, Project ID 88650

Project Allocation

400,000

(Base Project Allocation - $300,000)

(Design & Contingencies - $100,000)

(25) SR 3007 2.0 Miles Northwest of Olanta over Big Run, Pike Township, Bridge Replacement, Bridge Key 11801, Project ID 98081

Project Allocation

460,000

(Base Project Allocation - $250,000)

(Land Allocation - $46,000)

(Design & Contingencies - $164,000)

(26) SR 3009 over East Branch of Mahoning Creek, Brady Township, Bridge Restoration, Bridge Key 11807, Project ID 90252

Project Allocation

363,000

(Base Project Allocation - $363,000)

(27) SR 3009 over Beaver Run, Brady Township, Bridge Replacement, Bridge Key 11808, Project ID 91504

Project Allocation

500,000

(Base Project Allocation - $500,000)

(28) SR 3016 2.0 Miles Southwest of Kerrmoor over Campbell Run, Ferguson Township, Bridge Replacement, Bridge Key 11830, Project ID 91509

Project Allocation

1,000,000

(Base Project Allocation - $1,000,000)

(29) SR 4010 2.0 Miles West of Chestnut Grove over Little Anderson Creek, Brady Township, Bridge Replacement, Bridge Key 11861, Project ID 91505

Project Allocation

821,000

(Base Project Allocation - $611,000)

(Land Allocation - $35,000)

(Design & Contingencies - $175,000)

(30) SR 1009 over Hawk Run, Morris Township, Bridge Replacement, Bridge Key 11658, Project ID 89978

Project Allocation

1,326,000

(Base Project Allocation - $617,000)

(Land Allocation - $133,000)

(Design & Contingencies - $576,000)

(31) SR 0053 over Beaver Run, Houtzdale Borough, Bridge Replacement, Bridge Key 11231, Project ID 88627

Project Allocation

655,000

(Base Project Allocation - $246,000)

(Design & Contingencies - $409,000)

(32) US 219 over Curry Run, Greenwood Township, Bridge Restoration, Bridge Key 11399, Project ID 90252

Project Allocation

363,000

(Base Project Allocation - $363,000)

(33) SR 0036 over North Camp Run, Chest Township, Bridge Replacement, Bridge Key 11194, Project ID 71990

Project Allocation

443,000

(Base Project Allocation - $177,000)

(Design & Contingencies - $266,000)

(34) SR 0053 Madera over Jopling Run, Bigler Township, Bridge Rehabilitation, Bridge Key 11227, Project ID 69455

Project Allocation

104,000

(Base Project Allocation - $81,000)

(Land Allocation - $4,000)

(Design & Contingencies - $19,000)

(35) SR 0255 Hollywood over Mine Cave-in, Huston Township, Bridge Replacement, Bridge Key 11461, Project ID 88626

Project Allocation

805,000

(Base Project Allocation - $480,000)

(Land Allocation - $61,000)

(Design & Contingencies - $264,000)

(36) SR 0080 2.0 Miles East of Exit 120 over Abes Run, Bradford Township, Bridge Rehabilitation, Bridge Key 11306, Project ID 87694

Project Allocation

33,000

(Base Project Allocation - $19,000)

(Design & Contingencies - $14,000)

(37) SR 0080 Ramps at Exit 123 over Sulphur Run, Bradford Township, Bridge Rehabilitation, Bridge Key 11306, Project ID 87694

Project Allocation

33,000

(Base Project Allocation - $19,000)

(Design & Contingencies - $14,000)

(38) SR 0080 Exit 123, Woodland Interchange over SR 0970, Bradford Township, Bridge Replacement, Bridge Key 11309, Project ID 87729

Project Allocation

1,429,000

(Base Project Allocation - $1,374,000)

(Design & Contingencies - $55,000)

(39) SR 0080 Exit 123, Woodland Interchange over SR 0970, Bradford Township, Bridge Replacement, Bridge Key 11310, Project ID 87729

Project Allocation

1,429,000

(Base Project Allocation - $1,374,000)

(Design & Contingencies - $55,000)

(40) SR 0080 1.0 Mile East of Exit 123 over Valley Fork Run, Bradford Township, Bridge Rehabilitation, Bridge Key 11311, Project ID 87694

Project Allocation

33,000

(Base Project Allocation - $19,000)

(Design & Contingencies - $14,000)

(41) SR 0153 0.8 Mile South of Parker Dam Road over Tributary of Wise Run, Huston Township, Bridge Replacement, Bridge Key 11367, Project ID 88302

Project Allocation

218,000

(Base Project Allocation - $165,000)

(Land Allocation - $3,000)

(Design & Contingencies - $50,000)

(42) SR 0053 2.0 Miles South of Coalport over Turner Run, Beccaria Township, Bridge Rehabilitation, Bridge Key 11211, Project ID 69455

Project Allocation

167,000

(Base Project Allocation - $130,000)

(Land Allocation - $7,000)

(Design & Contingencies - $30,000)

(43) SR 0080 5.0 Miles West of Exit 133 over Moravian Run, Graham Township, Bridge Rehabilitation, Bridge Key 11320, Project ID 87694

Project Allocation

33,000

(Base Project Allocation - $19,000)

(Design & Contingencies - $14,000)

(44) SR 0219 McGees Mills over Whiskey Run, Bell Township, Bridge Replacement, Bridge Key 11390, Project ID 91508

Project Allocation

1,525,000

(Base Project Allocation - $990,000)

(Land Allocation - $101,000)

(Design & Contingencies - $434,000)

(45) SR 0219 1.0 Mile Northeast of Mahaffey over Laurel Run, Bell Township, Bridge Replacement, Bridge Key 11397, Project ID 88655

Project Allocation

2,158,000

(Base Project Allocation - $1,404,000)

(Land Allocation - $52,000)

(Design & Contingencies - $702,000)

(46) SR 0153 2.0 Miles North of Anderson Creek over Wise Run, Huston Township, Bridge Replacement, Bridge Key 11366, Project ID 88302

Project Allocation

403,000

(Base Project Allocation - $305,000)

(Land Allocation - $5,000)

(Design & Contingencies - $93,000)

(47) SR 0153 Anderson Creek Road over Anderson Creek, Pine Township, Bridge Replacement, Bridge Key 11365, Project ID 88302

Project Allocation

403,000

(Base Project Allocation - $305,000)

(Land Allocation - $5,000)

(Design & Contingencies - $93,000)

(48) SR 0153 over Beaver Run, Houtzdale Borough, Bridge Replacement, Bridge Key 11344, Project ID 0

Project Allocation

306,000

(Base Project Allocation - $287,000)

(Land Allocation - $4,000)

(Design & Contingencies - $15,000)

(49) SR 0153 2.0 Miles South of Houtzdale over Whiteside Run, Woodward Township, Bridge Rehabilitation, Bridge Key 11341, Project ID 3439

Project Allocation

132,000

(Base Project Allocation - $71,000)

(Land Allocation - $5,000)

(Design & Contingencies - $56,000)

(50) SR 0080 5.0 Miles East of Exit 133 over Brown Run, Cooper Township, Bridge Rehabilitation, Bridge Key 11336, Project ID 87694

Project Allocation

33,000

(Base Project Allocation - $19,000)

(Design & Contingencies - $14,000)

(51) SR 0080 2.0 Miles West of Exit 133 over Alder Run, Graham Township, Bridge Rehabilitation, Bridge Key 11322, Project ID 87694

Project Allocation

33,000

(Base Project Allocation - $19,000)

(Design & Contingencies - $14,000)

(52) SR 0080 2.0 Miles West of Exit 133 over Alder Run, Graham Township, Bridge Rehabilitation, Bridge Key 11321, Project ID 87694

Project Allocation

33,000

(Base Project Allocation - $19,000)

(Design & Contingencies - $14,000)

(53) SR 1001, Wolf Run Road over Wolf Run, Lawrence Township, Bridge Rehabilitation, Bridge Key 39958, Project ID 92420

Project Allocation

116,000

(Base Project Allocation - $99,000)

(Design & Contingencies - $17,000)

(54) Various State-Owned Bridges over Various Spans, Various Municipalities, Bridge Preservation, Bridge Key 0, Project ID 0

Project Allocation

1,100,000

(Base Project Allocation - $1,000,000)

(Design & Contingencies - $100,000)