Section 24. Crawford County.
(a) Local Bridges
Local
State
(1) Beaver Township, Palmer Road over Stone Run, Bridge Replacement
Project Allocation
900,000
(Base Project Allocation - $500,000)
(Land Allocation - $100,000)
(Design & Contingencies - $300,000)
(2) Summit Township, Agnew Road over Conneaut Creek, Bridge Replacement
Project Allocation
900,000
(Base Project Allocation - $500,000)
(Land Allocation - $100,000)
(Design & Contingencies - $300,000)
(3) City of Meadville, Arch Street over Mill Run, Bridge Replacement
Project Allocation
900,000
(Base Project Allocation - $500,000)
(Land Allocation - $100,000)
(Design & Contingencies - $300,000)
(4) Spring Township, Blue Falls Road over Tributary of Conneaut Creek, Bridge Replacement
Project Allocation
900,000
(Base Project Allocation - $500,000)
(Land Allocation - $100,000)
(Design & Contingencies - $300,000)
(5) Oil Creek Township, Bog Hollow Road over McLaughlin Creek, Bridge Replacement
Project Allocation
900,000
(Base Project Allocation - $500,000)
(Land Allocation - $100,000)
(Design & Contingencies - $300,000)
(6) Greenwood Township, Brown Hill Road over Outlet of Conneaut Creek, Bridge Replacement
Project Allocation
900,000
(Base Project Allocation - $500,000)
(Land Allocation - $100,000)
(Design & Contingencies - $300,000)
(7) Venango Township, Capp Road over Coulter Run, Bridge Replacement
Project Allocation
900,000
(Base Project Allocation - $500,000)
(Land Allocation - $100,000)
(Design & Contingencies - $300,000)
(8) Cussewago Township, Center Road over Cussewago Creek, Bridge Replacement
Project Allocation
900,000
(Base Project Allocation - $500,000)
(Land Allocation - $100,000)
(Design & Contingencies - $300,000)
(9) Cussewago Township, Center Road over Tributary of Cussewago Creek, Bridge Replacement
Project Allocation
1,000,000
(Base Project Allocation - $600,000)
(Land Allocation - $100,000)
(Design & Contingencies - $300,000)
(10) City of Meadville, Cherry Street over Mill Run, Bridge Replacement
Project Allocation
900,000
(Base Project Allocation - $500,000)
(Land Allocation - $100,000)
(Design & Contingencies - $300,000)
(11) City of Meadville, Chestnut Street over Mill Run, Bridge Replacement
Project Allocation
900,000
(Base Project Allocation - $500,000)
(Land Allocation - $100,000)
(Design & Contingencies - $300,000)
(12) Beaver Township, Cole Road over Tributary of Conneaut Creek, Bridge Replacement
Project Allocation
900,000
(Base Project Allocation - $500,000)
(Land Allocation - $100,000)
(Design & Contingencies - $300,000)
(13) Troy Township, Deeter Hill Road over Little Sugar Creek, Bridge Replacement
Project Allocation
900,000
(Base Project Allocation - $500,000)
(Land Allocation - $100,000)
(Design & Contingencies - $300,000)
(14) Oil Creek Township, Dotyville Road over Henderson Run, Bridge Replacement
Project Allocation
900,000
(Base Project Allocation - $500,000)
(Land Allocation - $100,000)
(Design & Contingencies - $300,000)
(15) Venango Township, Drakes Mill Road over Torry Run, Bridge Replacement
Project Allocation
900,000
(Base Project Allocation - $500,000)
(Land Allocation - $100,000)
(Design & Contingencies - $300,000)
(16) Oil Creek Township, Duncan Road over Caldwell Creek, Bridge Replacement
Project Allocation
1,100,000
(Base Project Allocation - $700,000)
(Land Allocation - $100,000)
(Design & Contingencies - $300,000)
(17) Woodcock Township, German Road over Tributary of Woodcock Creek, Bridge Replacement
Project Allocation
900,000
(Base Project Allocation - $500,000)
(Land Allocation - $100,000)
(Design & Contingencies - $300,000)
(18) Spring Township, Greene Road over Crazy Run, Bridge Replacement
Project Allocation
900,000
(Base Project Allocation - $500,000)
(Land Allocation - $100,000)
(Design & Contingencies - $300,000)
(19) East Mead Township, Hinkson Road over Branch of Little Sugar Creek, Bridge Replacement
Project Allocation
900,000
(Base Project Allocation - $500,000)
(Land Allocation - $100,000)
(Design & Contingencies - $300,000)
(20) Rockdale Township, Hogback West Road over Kelly Run, Bridge Replacement
Project Allocation
1,000,000
(Base Project Allocation - $600,000)
(Land Allocation - $100,000)
(Design & Contingencies - $300,000)
(21) South Shenango Township, Hurlbert Road over Tributary of Pymatuning Creek, Bridge Replacement
Project Allocation
1,000,000
(Base Project Allocation - $600,000)
(Land Allocation - $100,000)
(Design & Contingencies - $300,000)
(22) Troy Township, Jay Road over East Branch of Sugar Creek, Bridge Replacement
Project Allocation
900,000
(Base Project Allocation - $500,000)
(Land Allocation - $100,000)
(Design & Contingencies - $300,000)
(23) Troy Township, Jay Road over Sugar Creek, Bridge Replacement
Project Allocation
900,000
(Base Project Allocation - $500,000)
(Land Allocation - $100,000)
(Design & Contingencies - $300,000)
(24) Union Township, Kennedy Hill Road over Unnamed Run, Bridge Replacement
Project Allocation
1,000,000
(Base Project Allocation - $600,000)
(Land Allocation - $100,000)
(Design & Contingencies - $300,000)
(25) Bloomfield Township, Lakeview Drive over East Shreve Run, Bridge Replacement
Project Allocation
900,000
(Base Project Allocation - $500,000)
(Land Allocation - $100,000)
(Design & Contingencies - $300,000)
(26) Bloomfield Township, Maple Drive over East Shreve Run, Bridge Replacement
Project Allocation
700,000
(Base Project Allocation - $400,000)
(Land Allocation - $100,000)
(Design & Contingencies - $200,000)
(27) City of Meadville, Mercer Street over French Creek, Bridge Replacement
Project Allocation
1,400,000
(Base Project Allocation - $1,000,000)
(Land Allocation - $100,000)
(Design & Contingencies - $300,000)
(28) Bloomfield Township, Mickle Hollow Road over Federal Run, Bridge Replacement
Project Allocation
700,000
(Base Project Allocation - $400,000)
(Land Allocation - $100,000)
(Design & Contingencies - $200,000)
(29) City of Meadville, Mulberry Street over Mill Run, Bridge Replacement
Project Allocation
900,000
(Base Project Allocation - $500,000)
(Land Allocation - $100,000)
(Design & Contingencies - $300,000)
(30) Beaver Township, Philadelphia Road over Middle Branch of Conneaut Creek, Bridge Replacement
Project Allocation
900,000
(Base Project Allocation - $500,000)
(Land Allocation - $100,000)
(Design & Contingencies - $300,000)
(31) Beaver Township, Philadelphia Road over Mud Run, Bridge Replacement
Project Allocation
900,000
(Base Project Allocation - $500,000)
(Land Allocation - $100,000)
(Design & Contingencies - $300,000)
(32) Venango Township, Racop Road over Torry Run, Bridge Replacement
Project Allocation
900,000
(Base Project Allocation - $500,000)
(Land Allocation - $100,000)
(Design & Contingencies - $300,000)
(33) Venango Township, Sherred Road over Coulter Run, Bridge Replacement
Project Allocation
900,000
(Base Project Allocation - $500,000)
(Land Allocation - $100,000)
(Design & Contingencies - $300,000)
(34) East Mead Township, Smith Road over Branch of Little Sugar Creek, Bridge Replacement
Project Allocation
900,000
(Base Project Allocation - $500,000)
(Land Allocation - $100,000)
(Design & Contingencies - $300,000)
(35) Rockdale Township, Swamp Road over Muddy Creek, Bridge Replacement
Project Allocation
1,100,000
(Base Project Allocation - $700,000)
(Land Allocation - $100,000)
(Design & Contingencies - $300,000)
(36) Summerhill Township, Townline Road over Fish Creek, Bridge Replacement
Project Allocation
900,000
(Base Project Allocation - $500,000)
(Land Allocation - $100,000)
(Design & Contingencies - $300,000)
(37) City of Meadville, Walnut and Cottage Streets over Mill Run, Bridge Replacement
Project Allocation
900,000
(Base Project Allocation - $500,000)
(Land Allocation - $100,000)
(Design & Contingencies - $300,000)
(38) Sparta Township, Welsh Hill Road over Patrick Run, Bridge Replacement
Project Allocation
900,000
(Base Project Allocation - $500,000)
(Land Allocation - $100,000)
(Design & Contingencies - $300,000)
(39) City of Meadville, West Center Street over Mill Run, Bridge Replacement
Project Allocation
900,000
(Base Project Allocation - $500,000)
(Land Allocation - $100,000)
(Design & Contingencies - $300,000)
(40) Various Municipalities, Various Local Bridges over Various Spans, Bridge Preservation, Bridge Key 0 and Project ID 0
Project Allocation
1,100,000
(Base Project Allocation - $1,000,000)
(Design & Contingencies - $100,000)
(b) State Bridges
(1) (Reserved).
(2) SR 1034, Spring Street over Tributary of Clear Lake, Sparta Township, Bridge Rehabilitation, Bridge Key 13216, Project ID 97068
Project Allocation
56,000
(Base Project Allocation - $46,000)
(Design & Contingencies - $10,000)
(3) SR 1034, Sunback Road over Spring Creek, Sparta Township, Bridge Rehabilitation, Bridge Key 13217, Project ID 97068
Project Allocation
56,000
(Base Project Allocation - $46,000)
(Design & Contingencies - $10,000)
(4) SR 1037 over Tributary of Federal Run, Athens Township, Bridge Replacement, Bridge Key 13222, Project ID 97086
Project Allocation
850,000
(Base Project Allocation - $595,000)
(Land Allocation - $17,000)
(Design & Contingencies - $238,000)
(5) SR 1039 over Dilley Run, Bloomfield Township, Bridge Replacement, Bridge Key 13224, Project ID 90027
Project Allocation
426,000
(Base Project Allocation - $232,000)
(Land Allocation - $16,000)
(Design & Contingencies - $178,000)
(6) SR 2007, Alden Street over Ellis Run, West Mead Township, Bridge Rehabilitation, Bridge Key 13238, Project ID 84934
Project Allocation
111,000
(Base Project Allocation - $92,000)
(Design & Contingencies - $19,000)
(7) SR 2015 over Woodcock Creek, Randolph Township, Bridge Replacement, Bridge Key 13251, Project ID 89110
Project Allocation
426,000
(Base Project Allocation - $232,000)
(Land Allocation - $16,000)
(Design & Contingencies - $178,000)
(8) SR 2034, Rogers Fry Road over Cussewago Creek, Hayfield Township, Bridge Rehabilitation, Bridge Key 13277, Project ID 88448
Project Allocation
200,000
(Base Project Allocation - $160,000)
(Land Allocation - $10,000)
(Design & Contingencies - $30,000)
(9) SR 1031, Game Farm Road over Jones Run, Rockdale Township, Bridge Rehabilitation, Bridge Key 13209, Project ID 90160
Project Allocation
400,000
(Base Project Allocation - $250,000)
(Land Allocation - $50,000)
(Design & Contingencies - $100,000)
(10) SR 1011, Mystic Park Road over Oil Creek, Steuben Township, Bridge Rehabilitation, Bridge Key 13162, Project ID 97091
Project Allocation
700,000
(Base Project Allocation - $525,000)
(Design & Contingencies - $175,000)
(11) SR 3004 over Crooked Creek, East Fallowfield Township, Bridge Rehabilitation, Bridge Key 13283, Project ID 97122
Project Allocation
1,951,000
(Base Project Allocation - $1,672,000)
(Land Allocation - $19,000)
(Design & Contingencies - $260,000)
(12) SR 2024 over Hammond Run, City of Titusville, Bridge Rehabilitation, Bridge Key 13268, Project ID 97069
Project Allocation
111,000
(Base Project Allocation - $92,000)
(Design & Contingencies - $19,000)
(13) SR 1022 over Muddy Creek, Athens Township, Bridge Rehabilitation, Bridge Key 13194, Project ID 97094
Project Allocation
461,000
(Base Project Allocation - $354,000)
(Land Allocation - $18,000)
(Design & Contingencies - $89,000)
(14) SR 1018 over Muddy Creek, Steuben Township, Bridge Rehabilitation, Bridge Key 13187, Project ID 97067
Project Allocation
111,000
(Base Project Allocation - $92,000)
(Design & Contingencies - $19,000)
(15) SR 1018 over Muddy Creek, Steuben Township, Bridge Rehabilitation, Bridge Key 13185, Project ID 97066
Project Allocation
111,000
(Base Project Allocation - $92,000)
(Design & Contingencies - $19,000)
(16) SR 1018 over Branch of Muddy Creek, Steuben Township, Bridge Rehabilitation, Bridge Key 13184, Project ID 97093
Project Allocation
461,000
(Base Project Allocation - $354,000)
(Land Allocation - $18,000)
(Design & Contingencies - $89,000)
(17) SR 1018 over Woodcock Creek, Randolph Township, Bridge Rehabilitation, Bridge Key 13183, Project ID 97092
Project Allocation
461,000
(Base Project Allocation - $354,000)
(Land Allocation - $18,000)
(Design & Contingencies - $89,000)
(18) SR 4013 over Carr Run, Spring Township, Bridge Rehabilitation, Bridge Key 13382, Project ID 97083
Project Allocation
111,000
(Base Project Allocation - $92,000)
(Design & Contingencies - $19,000)
(19) SR 1015, Fry Road over Tributary of French Creek, Cussewago Township, Bridge Rehabilitation, Bridge Key 13172, Project ID 97065
Project Allocation
111,000
(Base Project Allocation - $92,000)
(Design & Contingencies - $19,000)
(20) SR 4001 over Tributary of Padan Creek, Conneaut Township, Bridge Rehabilitation, Bridge Key 13328, Project ID 97074
Project Allocation
111,000
(Base Project Allocation - $92,000)
(Design & Contingencies - $19,000)
(21) SR 1007 over Federal Run, Bloomfield Township, Bridge Rehabilitation, Bridge Key 13154, Project ID 97085
Project Allocation
111,000
(Base Project Allocation - $92,000)
(Design & Contingencies - $19,000)
(22) SR 1007 Cooley Hill over Tributary of Muddy Creek, Steuben Township, Bridge Rehabilitation, Bridge Key 13149, Project ID 90156
Project Allocation
400,000
(Base Project Allocation - $250,000)
(Land Allocation - $50,000)
(Design & Contingencies - $100,000)
(23) SR 1006 over Coulter Run, Cussewago Township, Bridge Rehabilitation, Bridge Key 13147, Project ID 97064
Project Allocation
111,000
(Base Project Allocation - $92,000)
(Design & Contingencies - $19,000)
(24) SR 1003, Shutz Road over Tributary of Woodcock Creek, Woodcock Township, Bridge Rehabilitation, Bridge Key 13145, Project ID 93169
Project Allocation
2,451,000
(Base Project Allocation - $2,168,000)
(Land Allocation - $19,000)
(Design & Contingencies - $264,000)
(25) SR 1002 over Branch of Gravel Run, Woodcock Township, Bridge Rehabilitation, Bridge Key 13141, Project ID 90038
Project Allocation
262,000
(Base Project Allocation - $163,000)
(Land Allocation - $17,000)
(Design & Contingencies - $82,000)
(26) SR 1016, Miller Station Road over Tributary of French Creek, Rockdale Township, Bridge Rehabilitation, Bridge Key 13174, Project ID 90044
Project Allocation
400,000
(Base Project Allocation - $300,000)
(Design & Contingencies - $100,000)
(27) SR 4006 over Turkey Track Run, Conneaut Township, Bridge Rehabilitation, Bridge Key 13348, Project ID 97077
Project Allocation
111,000
(Base Project Allocation - $92,000)
(Design & Contingencies - $19,000)
(28) SR 1002, Center Street over Tributary of Gravel Run, Woodcock Borough, Bridge Rehabilitation, Bridge Key 13139, Project ID 97116
Project Allocation
591,000
(Base Project Allocation - $405,000)
(Land Allocation - $17,000)
(Design & Contingencies - $169,000)
(29) SR 2034 over SR 0079, Hayfield Township, Bridge Rehabilitation, Bridge Key 13278, Project ID 97095
Project Allocation
1,761,000
(Base Project Allocation - $1,467,000)
(Land Allocation - $19,000)
(Design & Contingencies - $275,000)
(30) SR 4011 over Tributary of Wolf Run, Hayfield Township, Bridge Replacement, Bridge Key 13367, Project ID 97124
Project Allocation
441,000
(Base Project Allocation - $335,000)
(Land Allocation - $18,000)
(Design & Contingencies - $88,000)
(31) SR 4011, Grange Road over Tributary of Cussewago Creek, Cussewago Township, Bridge Replacement, Bridge Key 13369, Project ID 90158
Project Allocation
122,000
(Base Project Allocation - $86,000)
(Land Allocation - $18,000)
(Design & Contingencies - $18,000)
(32) SR 4011, Grange Road over Skelly Run, Cussewago Township, Bridge Replacement, Bridge Key 13371, Project ID 97087
Project Allocation
122,000
(Base Project Allocation - $86,000)
(Land Allocation - $18,000)
(Design & Contingencies - $18,000)
(33) SR 4011, Grange Road over Cussewago Creek, Cussewago Township, Bridge Replacement, Bridge Key 13372, Project ID 97081
Project Allocation
2,001,000
(Base Project Allocation - $1,637,000)
(Land Allocation - $91,000)
(Design & Contingencies - $273,000)
(34) SR 4012 over Branch of Conneaut Creek, Beaver Township, Bridge Rehabilitation, Bridge Key 13375, Project ID 97082
Project Allocation
111,000
(Base Project Allocation - $92,000)
(Design & Contingencies - $19,000)
(35) SR 4010, West Road over Cussewago Creek, Cussewago Township, Bridge Rehabilitation, Bridge Key 13366, Project ID 97079
Project Allocation
131,000
(Base Project Allocation - $112,000)
(Design & Contingencies - $19,000)
(36) SR 4010, Springboro Road over Carr Run, Spring Township, Bridge Replacement, Bridge Key 13365, Project ID 68678
Project Allocation
229,000
(Base Project Allocation - $130,000)
(Land Allocation - $9,000)
(Design & Contingencies - $90,000)
(37) SR 4009 over Stebins Run, Cussewago Township, Bridge Rehabilitation, Bridge Key 13357 and Project ID 97053
Project Allocation
122,000
(Base Project Allocation - $86,000)
(Land Allocation - $18,000)
(Design & Contingencies - $18,000)
(38) SR 4009 over Hubert Run, Hayfield Township, Bridge Replacement, Bridge Key 13356, Project ID 90152
Project Allocation
841,000
(Base Project Allocation - $572,000)
(Land Allocation - $17,000)
(Design & Contingencies - $252,000)
(39) SR 3021 over Geneva Creek, Greenwood Township, Bridge Rehabilitation, Bridge Key 13320, Project ID 97073
Project Allocation
111,000
(Base Project Allocation - $92,000)
(Design & Contingencies - $19,000)
(40) SR 4007 over Watson Run, Vernon Township, Bridge Rehabilitation, Bridge Key 13350, Project ID 97078
Project Allocation
111,000
(Base Project Allocation - $92,000)
(Design & Contingencies - $19,000)
(41) SR 3004 over SR 0079, Greenwood Township, Bridge Rehabilitation, Bridge Key 13288, Project ID 97056
Project Allocation
1,061,000
(Base Project Allocation - $947,000)
(Land Allocation - $19,000)
(Design & Contingencies - $95,000)
(42) SR 4006 over Paden Creek, Conneaut Township, Bridge Rehabilitation, Bridge Key 13347, Project ID 97099
Project Allocation
262,000
(Base Project Allocation - $163,000)
(Land Allocation - $17,000)
(Design & Contingencies - $82,000)
(43) SR 4004, Center Road over Padan Run, Conneaut Township, Bridge Rehabilitation, Bridge Key 13340, Project ID 97123
Project Allocation
111,000
(Base Project Allocation - $92,000)
(Design & Contingencies - $19,000)
(44) SR 4001 over East Branch of Conneaut Creek, Beaver Township, Bridge Rehabilitation, Bridge Key 13335, Project ID 88461
Project Allocation
562,000
(Base Project Allocation - $452,000)
(Land Allocation - $19,000)
(Design & Contingencies - $91,000)
(45) SR 4001 over East Branch of Conneaut Creek, Beaver Township, Bridge Rehabilitation, Bridge Key 13333, Project ID 97076
Project Allocation
111,000
(Base Project Allocation - $92,000)
(Design & Contingencies - $19,000)
(46) SR 4001 over West Branch of Conneaut Creek, Beaver Township, Bridge Rehabilitation, Bridge Key 13332, Project ID 97075
Project Allocation
111,000
(Base Project Allocation - $92,000)
(Design & Contingencies - $19,000)
(47) SR 3025 over SR 0079, Vernon Township, Bridge Rehabilitation, Bridge Key 13325, Project ID 88434
Project Allocation
2,702,000
(Base Project Allocation - $2,328,000)
(Land Allocation - $187,000)
(Design & Contingencies - $187,000)
(48) SR 3016 over SR 0079, Vernon Township, Bridge Rehabilitation, Bridge Key 13315, Project ID 88440
Project Allocation
2,051,000
(Base Project Allocation - $1,771,000)
(Land Allocation - $19,000)
(Design & Contingencies - $261,000)
(49) SR 3016 over Watson Run, Vernon Township, Bridge Rehabilitation, Bridge Key 13314, Project ID 97098
Project Allocation
362,000
(Base Project Allocation - $258,000)
(Land Allocation - $18,000)
(Design & Contingencies - $86,000)
(50) SR 3015, Leach Road over McDowell Run, East Fallowfield Township, Bridge Rehabilitation, Bridge Key 13309, Project ID 97071
Project Allocation
111,000
(Base Project Allocation - $92,000)
(Design & Contingencies - $19,000)
(51) SR 3010 over Fenner Run, South Shenango Township, Bridge Rehabilitation, Bridge Key 13301, Project ID 97052
Project Allocation
111,000
(Base Project Allocation - $92,000)
(Design & Contingencies - $19,000)
(52) SR 3005 East Lake Road North of Unger Road over Tributary of Shenango River, South Shenango Township, Bridge Replacement, Bridge Key 13289, Project ID 90161
Project Allocation
400,000
(Base Project Allocation - $250,000)
(Land Allocation - $50,000)
(Design & Contingencies - $100,000)
(53) SR 4008, Fisher Road over Stone Run, Beaver Township, Bridge Rehabilitation, Bridge Key 13353, Project ID 97100
Project Allocation
251,000
(Base Project Allocation - $167,000)
(Design & Contingencies - $84,000)
(54) SR 0027, State Street over Mill Run, City of Meadville, Bridge Rehabilitation, Bridge Key 12945, Project ID 97057
Project Allocation
111,000
(Base Project Allocation - $92,000)
(Design & Contingencies - $19,000)
(55) SR 0079 Southbound over Cussewago Creek, Vernon Township, Bridge Rehabilitation, Bridge Key 13005, Project ID 97112
Project Allocation
1,101,000
(Base Project Allocation - $917,000)
(Land Allocation - $19,000)
(Design & Contingencies - $165,000)
(56) SR 0079 Northbound over Cussewago Creek, Vernon Township, Bridge Rehabilitation, Bridge Key 13004, Project ID 97111
Project Allocation
1,101,000
(Base Project Allocation - $917,000)
(Land Allocation - $19,000)
(Design & Contingencies - $165,000)
(57) SR 0079 Southbound over SR 0102, Vernon Township, Bridge Rehabilitation, Bridge Key 13003, Project ID 97110
Project Allocation
1,711,000
(Base Project Allocation - $1,504,000)
(Land Allocation - $19,000)
(Design & Contingencies - $188,000)
(58) SR 0079 Northbound over SR 0102, Vernon Township, Bridge Rehabilitation, Bridge Key 13001, Project ID 97109
Project Allocation
1,711,000
(Base Project Allocation - $1,504,000)
(Land Allocation - $19,000)
(Design & Contingencies - $188,000)
(59) SR 0077 over Tributary of Woodcock Creek, Blooming Valley Borough, Bridge Rehabilitation, Bridge Key 12964, Project ID 97108
Project Allocation
251,000
(Base Project Allocation - $167,000)
(Design & Contingencies - $84,000)
(60) SR 0077 over Tributary of Woodcock Creek, East Mead Township, Bridge Rehabilitation, Bridge Key 12963, Project ID 97089
Project Allocation
251,000
(Base Project Allocation - $167,000)
(Design & Contingencies - $84,000)
(61) SR 0027 over Church Run, City of Titusville, Bridge Rehabilitation, Bridge Key 12960, Project ID 97054
Project Allocation
111,000
(Base Project Allocation - $92,000)
(Design & Contingencies - $19,000)
(62) SR 0027 over Oil Creek, City of Titusville, Bridge Rehabilitation, Bridge Key 12959, Project ID 97119
Project Allocation
1,192,000
(Base Project Allocation - $989,000)
(Land Allocation - $19,000)
(Design & Contingencies - $184,000)
(63) SR 0027 over Sugar Creek, Troy Township, Bridge Rehabilitation, Bridge Key 12955, Project ID 97106
Project Allocation
131,000
(Base Project Allocation - $112,000)
(Design & Contingencies - $19,000)
(64) SR 0079 Northbound over T-611, Matt Road, Hayfield Township, Bridge Rehabilitation, Bridge Key 13006, Project ID 97113
Project Allocation
900,000
(Base Project Allocation - $720,000)
(Land Allocation - $18,000)
(Design & Contingencies - $162,000)
(65) SR 0027 over Little Sugar Creek, East Mead Township, Bridge Rehabilitation, Bridge Key 12948, Project ID 97101
Project Allocation
111,000
(Base Project Allocation - $92,000)
(Design & Contingencies - $19,000)
(66) SR 0027 over West Branch of Sugar Creek, Troy Township, Bridge Rehabilitation, Bridge Key 12954, Project ID 97104
Project Allocation
111,000
(Base Project Allocation - $92,000)
(Design & Contingencies - $19,000)
(67) SR 0018 over Tributary of Conneaut Creek, Summerhill Township, Bridge Rehabilitation, Bridge Key 12931, Project ID 97107
Project Allocation
1,001,000
(Base Project Allocation - $667,000)
(Land Allocation - $84,000)
(Design & Contingencies - $250,000)
(68) SR 0006 over Tributary of French Creek, Cambridge Township, Bridge Rehabilitation, Bridge Key 12902, Project ID 90155
Project Allocation
122,000
(Base Project Allocation - $86,000)
(Land Allocation - $18,000)
(Design & Contingencies - $18,000)
(69) SR 0006 over Tributary of French Creek, Cambridge Township, Bridge Replacement, Bridge Key 12900, Project ID 89125
Project Allocation
562,000
(Base Project Allocation - $312,000)
(Land Allocation - $16,000)
(Design & Contingencies - $234,000)
(70) SR 2101, Terrace Street over SR 0006, West Mead Township, Bridge Rehabilitation, Bridge Key 12889, Project ID 97096
Project Allocation
1,262,000
(Base Project Allocation - $1,146,000)
(Land Allocation - $20,000)
(Design & Contingencies - $96,000)
(71) SR 0006 over Tributary of Conneaut Lake Outlet, Vernon Township, Bridge Replacement, Bridge Key 12879, Project ID 97120
Project Allocation
1,800,000
(Base Project Allocation - $1,440,000)
(Land Allocation - $90,000)
(Design & Contingencies - $270,000)
(72) SR 0006 over Tributary of Shenango River, Sadsbury Township, Bridge Replacement, Bridge Key 12874, Project ID 90022
Project Allocation
292,000
(Base Project Allocation - $153,000)
(Land Allocation - $16,000)
(Design & Contingencies - $123,000)
(73) SR 0006, Erie Street over Tributary of Shenango River, Pine Township, Bridge Rehabilitation, Bridge Key 12872, Project ID 97088
Project Allocation
211,000
(Base Project Allocation - $191,000)
(Design & Contingencies - $20,000)
(74) SR 1001 over Mill Run, City of Meadville, Bridge Rehabilitation, Bridge Key 13134, Project ID 97063
Project Allocation
171,000
(Base Project Allocation - $152,000)
(Design & Contingencies - $19,000)
(75) SR 3004 over Tributary of McMichael Run, Greenwood Township, Bridge Rehabilitation, Bridge Key 13286, Project ID 97070
Project Allocation
111,000
(Base Project Allocation - $92,000)
(Design & Contingencies - $19,000)
(76) SR 0027 over Tributary of Lake Creek, Randolph Township, Bridge Replacement, Bridge Key 12953, Project ID 89105
Project Allocation
1,752,000
(Base Project Allocation - $1,167,000)
(Land Allocation - $84,000)
(Design & Contingencies - $501,000)
(77) SR 0285 over Tributary of Conneaut Creek, Fairfield Township, Bridge Replacement, Bridge Key 13094, Project ID 90045
Project Allocation
1,752,000
(Base Project Allocation - $1,167,000)
(Land Allocation - $84,000)
(Design & Contingencies - $501,000)
(78) SR 0618 North of Ellis Road over Tributary of Conneaut Lake, Sadsbury Township, Bridge Replacement, Bridge Key 13132, Project ID 90153
Project Allocation
400,000
(Base Project Allocation - $250,000)
(Land Allocation - $50,000)
(Design & Contingencies - $100,000)
(79) SR 0618 over Tributary of Conneaut Lake, Sadsbury Township, Bridge Replacement, Bridge Key 13130, Project ID 89106
Project Allocation
292,000
(Base Project Allocation - $153,000)
(Land Allocation - $16,000)
(Design & Contingencies - $123,000)
(80) SR 0408, Thompson Street over Thompson Creek, Hydetown Borough, Bridge Replacement, Bridge Key 13128, Project ID 97118
Project Allocation
4,251,000
(Base Project Allocation - $3,778,000)
(Land Allocation - $95,000)
(Design & Contingencies - $378,000)
(81) SR 0027 over Little Sugar Creek, East Mead Township, Bridge Rehabilitation, Bridge Key 12949, Project ID 97103
Project Allocation
111,000
(Base Project Allocation - $92,000)
(Design & Contingencies - $19,000)
(82) SR 0079 Southbound over T-611, Matt Road, Hayfield Township, Bridge Rehabilitation, Bridge Key 13007, Project ID 97114
Project Allocation
900,000
(Base Project Allocation - $720,000)
(Land Allocation - $18,000)
(Design & Contingencies - $162,000)
(83) SR 0408, Church Street over East Branch of Sugar Creek, Troy Township, Bridge Replacement, Bridge Key 13125, Project ID 97051
Project Allocation
400,000
(Base Project Allocation - $240,000)
(Land Allocation - $16,000)
(Design & Contingencies - $144,000)
(84) SR 0408, Church Street over Temple Run, Richmond Township, Bridge Replacement, Bridge Key 13122, Project ID 97117
Project Allocation
1,852,000
(Base Project Allocation - $1,410,000)
(Land Allocation - $89,000)
(Design & Contingencies - $353,000)
(85) US 322, 28th Division Highway over Little Sugar Creek, Wayne Township, Bridge Rehabilitation, Bridge Key 13113, Project ID 88901
Project Allocation
850,000
(Base Project Allocation - $800,000)
(Land Allocation - $10,000)
(Design & Contingencies - $40,000)
(86) SR 0285 West of Marsh Road over Ward Run, Fairfield Township, Bridge Rehabilitation, Bridge Key 13096, Project ID 90035
Project Allocation
70,000
(Base Project Allocation - $50,000)
(Design & Contingencies - $20,000)
(87) SR 0285 over Turkey Run, Greenwood Township, Bridge Rehabilitation, Bridge Key 13092, Project ID 97060
Project Allocation
651,000
(Base Project Allocation - $558,000)
(Design & Contingencies - $93,000)
(88) SR 0285, Licking Street over Bennett Run, North Shenango Township, Bridge Replacement, Bridge Key 13084, Project ID 97121
Project Allocation
1,800,000
(Base Project Allocation - $1,440,000)
(Land Allocation - $90,000)
(Design & Contingencies - $270,000)
(89) SR 0198 over Woodcock Creek, Woodcock Township, Bridge Rehabilitation, Bridge Key 13080, Project ID 88444
Project Allocation
2,311,000
(Base Project Allocation - $2,100,000)
(Land Allocation - $20,000)
(Design & Contingencies - $191,000)
(90) SR 0098, Cussewago Road over Tributary of Cussewago Creek, Hayfield Township, Bridge Rehabilitation, Bridge Key 13042, Project ID 97090
Project Allocation
1,202,000
(Base Project Allocation - $858,000)
(Land Allocation - $172,000)
(Design & Contingencies - $172,000)
(91) SR 0079 Northbound over Tributary of Cussewago Creek, Hayfield Township, Bridge Rehabilitation, Bridge Key 13008, Project ID 97055
Project Allocation
450,000
(Base Project Allocation - $360,000)
(Design & Contingencies - $90,000)
(92) SR 0886 over Gravel Run, Woodcock Borough, Bridge Replacement, Bridge Key 13027, Project ID 89176
Project Allocation
3,701,000
(Base Project Allocation - $3,145,000)
(Land Allocation - $93,000)
(Design & Contingencies - $463,000)
(93) SR 0089 over Church Run, City of Titusville, Bridge Rehabilitation, Bridge Key 13030, Project ID 97058
Project Allocation
111,000
(Base Project Allocation - $92,000)
(Design & Contingencies - $19,000)
(94) SR 0322 over Tributary of Conneaut Creek, Sadsbury Township, Bridge Rehabilitation, Bridge Key 13107, Project ID 97115
Project Allocation
251,000
(Base Project Allocation - $167,000)
(Design & Contingencies - $84,000)
(95) SR 0089 over Church Run, City of Titusville, Bridge Rehabilitation, Bridge Key 13032, Project ID 97059
Project Allocation
111,000
(Base Project Allocation - $92,000)
(Design & Contingencies - $19,000)
(96) SR 0099, Forest Street over Torry Run, Venango Township, Bridge Rehabilitation, Bridge Key 13056, Project ID 97061
Project Allocation
111,000
(Base Project Allocation - $92,000)
(Design & Contingencies - $19,000)
(97) SR 0099, Forest Street over Branch of Torry Run, Venango Township, Bridge Rehabilitation, Bridge Key 13058, Project ID 97062
Project Allocation
311,000
(Base Project Allocation - $291,000)
(Design & Contingencies - $20,000)
(98) SR 0198, Licking Street over Palmer Run, Spring Township, Bridge Rehabilitation, Bridge Key 13065, Project ID 97084
Project Allocation
122,000
(Base Project Allocation - $86,000)
(Land Allocation - $18,000)
(Design & Contingencies - $18,000)
(99) SR 0198, Licking Street over Palmer Run, Spring Township, Bridge Replacement, Bridge Key 13065, Project ID 90162
Project Allocation
400,000
(Base Project Allocation - $250,000)
(Land Allocation - $50,000)
(Design & Contingencies - $100,000)
(100) SR 0198, Foster Road over Tributary of Cussewago Creek, Summerhill Township, Bridge Replacement, Bridge Key 13068, Project ID 90030
Project Allocation
612,000
(Base Project Allocation - $454,000)
(Land Allocation - $18,000)
(Design & Contingencies - $140,000)
(101) SR 0198, Foster Road over Tributary of Cussewago Creek, Summerhill Township, Bridge Replacement, Bridge Key 13069, Project ID 90034
Project Allocation
412,000
(Base Project Allocation - $263,000)
(Land Allocation - $17,000)
(Design & Contingencies - $132,000)
(102) SR 1016, Miller Station Road over Kelly Run, Rockdale Township, Bridge Rehabilitation, Bridge Key 42020, Project ID 88452
Project Allocation
120,000
(Base Project Allocation - $80,000)
(Land Allocation - $10,000)
(Design & Contingencies - $30,000)
(103) Various State-Owned Bridges over Various Spans, Various Municipalities, Bridge Preservation, Bridge Key 0, Project ID 0
Project Allocation
1,100,000
(Base Project Allocation - $1,000,000)
(Design & Contingencies - $100,000)