Section 26. Dauphin County.
(a) Local Bridges
Local
State
(1) Lower Paxton Township, Catherine Street over Paxton Creek, Bridge Replacement
Project Allocation
50,000
(Base Project Allocation - $50,000)
(2) Middletown Borough, Ann Street over Amtrak Railroad, Bridge Transition and Wing Wall, Bridge Rehabilitation, Bridge Key 22740940005051
Project Allocation
250,000
(Base Project Allocation - $250,000)
(3) Middle Paxton Township, T-509, Potato Valley Road over Fishing Creek, Bridge Rehabilitation, MPMS No.33011902501570
Project Allocation
1,000,000
(Base Project Allocation - $950,000)
(Land Allocation - $50,000)
(4) Various Municipalities, Various Local Bridges over Various Spans, Bridge Preservation, Bridge Key 0, Project ID 0
Project Allocation
1,100,000
(Base Project Allocation - $1,000,000)
(Design & Contingencies - $100,000)
(b) State Bridges
(1) (Reserved).
(2) I-83 Southbound, Eisenhower Interchange over Norfolk Southern Railway, Swatara Township, Bridge Replacement, Bridge Key 14279, Project ID 92931
Project Allocation
24,000
(Base Project Allocation - $18,000)
(Land Allocation - $4,000)
(Design & Contingencies - $2,000)
(3) I-83 over TR 369 and Spring Creek, Lower Paxton Township, Bridge Replacement, Bridge Key 14280, Project ID 92931
Project Allocation
24,000
(Base Project Allocation - $18,000)
(Land Allocation - $4,000)
(Design & Contingencies - $2,000)
(4) I-83 over TR 369 and Spring Creek, Lower Paxton Township, Bridge Rehabilitation, Bridge Key 14280, Project ID 92145
Project Allocation
191,000
(Base Project Allocation - $131,000)
(Design & Contingencies - $60,000)
(5) PA 147 0.25 Mile South of Inglenook over Powells Creek, Reed Township, Bridge Replacement, Bridge Key 14291, Project ID 90771
Project Allocation
5,184,000
(Base Project Allocation - $5,184,000)
(6) PA 147, South River Road over Norfolk Southern Railway, Reed Township, Bridge Rehabilitation, Bridge Key 14293, Project ID 99865
Project Allocation
1,700,000
(Base Project Allocation - $1,700,000)
(7) I-83 Southbound, Eisenhower Interchange over Norfolk Southern Railway, Swatara Township, Bridge Rehabilitation, Bridge Key 14279, Project ID 92145
Project Allocation
381,000
(Base Project Allocation - $262,000)
(Design & Contingencies - $119,000)
(8) I-83 0.5 Mile East of Lawnton over SR 3001, Swatara Township, Bridge Rehabilitation, Bridge Key 14278, Project ID 92145
Project Allocation
543,000
(Base Project Allocation - $373,000)
(Design & Contingencies - $170,000)
(9) I-83 0.5 Mile East of Lawnton over SR 3001, Swatara Township, Bridge Replacement, Bridge Key 14278, Project ID 92931
Project Allocation
24,000
(Base Project Allocation - $18,000)
(Land Allocation - $4,000)
(Design & Contingencies - $2,000)
(10) I-83 0.5 Mile East of Lawnton over SR 3012, Swatara Township, Bridge Replacement, Bridge Key 14276, Project ID 92931
Project Allocation
24,000
(Base Project Allocation - $18,000)
(Land Allocation - $4,000)
(Design & Contingencies - $2,000)
(11) I-83 Southbound, Eisenhower Interchange over I-83, US 322 and SR 8030, Swatara Township, Bridge Rehabilitation, Bridge Key 14275, Project ID 92145
Project Allocation
706,000
(Base Project Allocation - $485,000)
(Design & Contingencies - $221,000)
(12) PA 147 1.5 Miles North of Halifax over Gurdy Run, Halifax Township, Bridge Replacement, Bridge Key 14296, Project ID 80697
Project Allocation
721,000
(Base Project Allocation - $520,000)
(Land Allocation - $64,000)
(Design & Contingencies - $137,000)
(13) PA 225 2.5 Miles North of Berrysburg over Tributary of Deep Creek, Mifflin Township, Bridge Replacement, Bridge Key 14322, Project ID 90773
Project Allocation
281,000
(Base Project Allocation - $281,000)
(14) I-83 Southbound, Eisenhower Interchange over I-83, US 322 and SR 8030, Swatara Township, Bridge Replacement, Bridge Key 14275, Project ID 92931
Project Allocation
24,000
(Base Project Allocation - $18,000)
(Land Allocation - $4,000)
(Design & Contingencies - $2,000)
(15) I-83 Northbound over Norfolk Southern Railway, Swatara Township, Bridge Rehabilitation, Bridge Key 14274, Project ID 92145
Project Allocation
435,000
(Base Project Allocation - $299,000)
(Design & Contingencies - $136,000)
(16) I-83 0.5 Mile East of Lawnton over SR 3012, Swatara Township, Bridge Rehabilitation, Bridge Key 14276, Project ID 92145
Project Allocation
543,000
(Base Project Allocation - $373,000)
(Design & Contingencies - $170,000)
(17) SR 0225, Armstrong Valley Road over Armstrong Creek, Halifax Borough, Bridge Rehabilitation, Bridge Key 14317, Project ID 100036
Project Allocation
460,000
(Base Project Allocation - $460,000)
(18) SR 0022 Westbound 0.5 Mile East of Duncannon over Susquehanna River and SR 0147, Reed Township, Bridge Rehabilitation, Bridge Key 14151, Project ID 93178
Project Allocation
1,864,000
(Base Project Allocation - $1,595,000)
(Design & Contingencies - $269,000)
(19) I-83 Northbound over Norfolk Southern Railway, Swatara Township, Bridge Replacement, Bridge Key 14274, Project ID 92931
Project Allocation
24,000
(Base Project Allocation - $18,000)
(Land Allocation - $4,000)
(Design & Contingencies - $2,000)
(20) PA 230 over Burd Run, Highspire Borough, Bridge Replacement, Bridge Key 14329, Project ID 100053
Project Allocation
2,000,000
(Base Project Allocation - $2,000,000)
(21) PA 230 over Buser Run, Highspire Borough, Bridge Replacement, Bridge Key 14328, Project ID 100050
Project Allocation
1,900,000
(Base Project Allocation - $1,900,000)
(22) PA 230 over Asylum Run, City of Harrisburg, Bridge Replacement, Bridge Key 14323, Project ID 87454
Project Allocation
127,000
(Base Project Allocation - $127,000)
(23) PA 225 1.5 Miles North of Fisherville over Tributary of Armstrong Creek, Jackson Township, Bridge Replacement, Bridge Key 14319, Project ID 93583
Project Allocation
1,000,000
(Base Project Allocation - $1,000,000)
(24) PA 225 1.0 Mile Northeast of Fisherville over Tributary of Armstrong Creek, Jackson Township, Bridge Replacement, Bridge Key 14318, Project ID 100268
Project Allocation
900,000
(Base Project Allocation - $900,000)
(25) PA 147 South of Millersburg over Mill Race, Upper Paxton Township, Bridge Replacement, Bridge Key 14298, Project ID 99887
Project Allocation
1,400,000
(Base Project Allocation - $1,400,000)
(26) US 209, Lykens Borough Line West over Wiconisco Creek, Lykens Borough, Bridge Rehabilitation, Bridge Key 14310, Project ID 99870
Project Allocation
840,000
(Base Project Allocation - $840,000)
(27) US 209 Loyalton over Wiconisco Creek, Washington Township, Bridge Rehabilitation, Bridge Key 14309, Project ID 99868
Project Allocation
900,000
(Base Project Allocation - $900,000)
(28) US 209 4.0 Miles West of Elizabethville over Tributary of Wiconisco Creek, Upper Paxton Township, Bridge Replacement, Bridge Key 14305, Project ID 100234
Project Allocation
1,100,000
(Base Project Allocation - $1,100,000)
(29) US 209 3.0 Miles East of Millersburg over Keefers Run, Upper Paxton Township, Bridge Replacement, Bridge Key 14304, Project ID 99882
Project Allocation
1,100,000
(Base Project Allocation - $1,100,000)
(30) US 209 over Little Wiconisco Creek, Upper Paxton Township, Bridge Replacement, Bridge Key 14303, Project ID 80681
Project Allocation
2,500,000
(Base Project Allocation - $2,500,000)
(31) PA 147 over Shippen Run, Millersburg Borough, Bridge Replacement, Bridge Key 14300, Project ID 90772
Project Allocation
420,000
(Base Project Allocation - $420,000)
(32) PA 225 1.0 Mile North of Elizabethville over Wiconisco Creek, Washington Township, Bridge Rehabilitation, Bridge Key 14320, Project ID 99875
Project Allocation
780,000
(Base Project Allocation - $780,000)
(33) US 22 Grantville over Bow Creek, East Hanover Township, Bridge Replacement, Bridge Key 14187, Project ID 99997
Project Allocation
3,200,000
(Base Project Allocation - $3,200,000)
(34) PA 230 0.5 Mile West of Middletown over Storm Channel, Lower Swatara Township, Bridge Replacement, Bridge Key 14331, Project ID 100247
Project Allocation
1,200,000
(Base Project Allocation - $1,200,000)
(35) PA 25 3.0 Miles East of Gratz over Tributary of Pine Creek, Lykens Township, Bridge Rehabilitation, Bridge Key 14194, Project ID 100024
Project Allocation
100,000
(Base Project Allocation - $100,000)
(36) SR 0011 near Amity Hall over Juniata River and Norfolk Southern Railway, Reed Township, Bridge Rehabilitation, Bridge Key 14142, Project ID 99848
Project Allocation
10,000,000
(Base Project Allocation - $10,000,000)
(37) US 22 Clarks Ferry over Susquehanna River, Reed Township, Bridge Rehabilitation, Bridge Key 14144, Project ID 93178
Project Allocation
1,779,000
(Base Project Allocation - $1,522,000)
(Design & Contingencies - $257,000)
(38) US 22/322 Eastbound, Clarks Ferry over Susquehanna River and SR 0147, Reed Township, Bridge Rehabilitation, Bridge Key 14146, Project ID 93178
Project Allocation
2,147,000
(Base Project Allocation - $1,837,000)
(Design & Contingencies - $310,000)
(39) US 22 Westbound, Clarks Ferry over Susquehanna River, Reed Township, Bridge Rehabilitation, Bridge Key 14148, Project ID 93178
Project Allocation
1,588,000
(Base Project Allocation - $1,359,000)
(Design & Contingencies - $229,000)
(40) SR 0022 2.0 Miles North of Dauphin over Clarks Run, Middle Paxton Township, Bridge Rehabilitation, Bridge Key 14157, Project ID 99852
Project Allocation
600,000
(Base Project Allocation - $600,000)
(41) US 22 Westbound, Rockville over Norfolk Southern Railway, Susquehanna Township, Bridge Rehabilitation, Bridge Key 14165, Project ID 99863
Project Allocation
3,600,000
(Base Project Allocation - $3,600,000)
(42) US 22/322 Westbound over T-509, Susquehanna Township, Bridge Rehabilitation, Bridge Key 14167, Project ID 99858
Project Allocation
700,000
(Base Project Allocation - $700,000)
(43) US 22 Eastbound over SR 0081 and SR 8003 Ramps A and B, Susquehanna Township, Bridge Rehabilitation, Bridge Key 14170, Project ID 80696
Project Allocation
5,256,000
(Base Project Allocation - $4,768,000)
(Design & Contingencies - $488,000)
(44) US 22 Westbound over I-81 and SR 8003 Ramps A and B, Susquehanna Township, Bridge Rehabilitation, Bridge Key 14172, Project ID 80696
Project Allocation
5,256,000
(Base Project Allocation - $4,768,000)
(Design & Contingencies - $488,000)
(45) US 22 Eastbound at I-81 Interchange over SR 8003 Ramp C, Susquehanna Township, Bridge Rehabilitation, Bridge Key 14173, Project ID 80696
Project Allocation
3,154,000
(Base Project Allocation - $2,861,000)
(Design & Contingencies - $293,000)
(46) SR 0022 Eastbound Rockville over Norfolk Southern Railway, Susquehanna Township, Bridge Rehabilitation, Bridge Key 14164, Project ID 99861
Project Allocation
3,600,000
(Base Project Allocation - $3,600,000)
(47) I-81 2.0 Miles Southwest of Linglestown over Tributary of Paxton Creek, Lower Paxton Township, Bridge Rehabilitation, Bridge Key 14234, Project ID 90204
Project Allocation
231,000
(Base Project Allocation - $177,000)
(Design & Contingencies - $54,000)
(48) I-83 Northbound, Eisenhower Interchange over US 322, I-283 Southbound and SR 3001, Swatara Township, Bridge Replacement, Bridge Key 14273, Project ID 92931
Project Allocation
24,000
(Base Project Allocation - $18,000)
(Land Allocation - $4,000)
(Design & Contingencies - $2,000)
(49) I-83, Eisenhower Interchange over Tributary of Spring Creek, Swatara Township, Bridge Rehabilitation, Bridge Key 14272, Project ID 92145
Project Allocation
109,000
(Base Project Allocation - $75,000)
(Design & Contingencies - $34,000)
(50) I-83, Eisenhower Interchange over Tributary of Spring Creek, Swatara Township, Bridge Replacement, Bridge Key 14272, Project ID 92931
Project Allocation
24,000
(Base Project Allocation - $18,000)
(Land Allocation - $4,000)
(Design & Contingencies - $2,000)
(51) 13th Street over SR 0083, City of Harrisburg, Bridge Rehabilitation, Bridge Key 14262, Project ID 92145
Project Allocation
408,000
(Base Project Allocation - $280,000)
(Design & Contingencies - $128,000)
(52) I-83 South Harrisburg over PA 230, Norfolk Southern Railway and Front Street, City of Harrisburg, Bridge Rehabilitation, Bridge Key 14258, Project ID 92145
Project Allocation
408,000
(Base Project Allocation - $280,000)
(Design & Contingencies - $128,000)
(53) US 22 Westbound at I-81 Interchange over SR 8003 Ramp C, Susquehanna Township, Bridge Rehabilitation, Bridge Key 14174, Project ID 80696
Project Allocation
3,154,000
(Base Project Allocation - $2,861,000)
(Design & Contingencies - $293,000)
(54) T-526 1.0 Mile West of Manada over I-81, West Hanover Township, Bridge Rehabilitation, Bridge Key 14244, Project ID 99917
Project Allocation
1,700,000
(Base Project Allocation - $1,700,000)
(55) US 22 1.0 Mile South of Manada over Tributary of Manada Creek, East Hanover Township, Bridge Replacement, Bridge Key 14186, Project ID 99988
Project Allocation
2,500,000
(Base Project Allocation - $2,500,000)
(56) I-81 2.5 Miles Southwest of Linglestown over Tributary of Paxton Creek, Lower Paxton Township, Bridge Rehabilitation, Bridge Key 14233, Project ID 90204
Project Allocation
231,000
(Base Project Allocation - $177,000)
(Design & Contingencies - $54,000)
(57) I-81 Northbound, SR 8007 1.0 Mile North of Progress over Tributary of Paxton Creek, Lower Paxton Township, Bridge Rehabilitation, Bridge Key 14230, Project ID 90204
Project Allocation
231,000
(Base Project Allocation - $177,000)
(Design & Contingencies - $54,000)
(58) I-81 Northbound 1.0 Mile North of Progress over TR 432, Lower Paxton Township, Bridge Rehabilitation, Bridge Key 14229, Project ID 90204
Project Allocation
231,000
(Base Project Allocation - $177,000)
(Design & Contingencies - $54,000)
(59) I-81 Northbound at I-81 and I-83 Interchange over I-83 Northbound, SR 0083, Lower Paxton Township, Bridge Rehabilitation, Bridge Key 14228, Project ID 90204
Project Allocation
231,000
(Base Project Allocation - $177,000)
(Design & Contingencies - $54,000)
(60) PA 25 2.5 Miles East of Gratz over Tributary of Pine Creek, Lykens Township, Bridge Rehabilitation, Bridge Key 14193, Project ID 100008
Project Allocation
100,000
(Base Project Allocation - $100,000)
(61) I-83 Northbound, Eisenhower Interchange over US 322, I-283 Southbound and SR 3001, Swatara Township, Bridge Rehabilitation, Bridge Key 14273, Project ID 92145
Project Allocation
2,171,000
(Base Project Allocation - $1,492,000)
(Design & Contingencies - $679,000)
(62) I-83, John Harris Bridge over Susquehanna River, Railroad and Lowther Street, City of Harrisburg, Bridge Rehabilitation, Bridge Key 14257, Project ID 92145
Project Allocation
408,000
(Base Project Allocation - $280,000)
(Design & Contingencies - $128,000)
(63) SR 3007, 19th Street over Norfolk Southern Railway, City of Harrisburg, Bridge Replacement, Bridge Key 14514, Project ID 90837
Project Allocation
5,967,000
(Base Project Allocation - $5,967,000)
(64) SR 2010 1.0 Mile North of Hummelstown over Kellock Run, South Hanover Township, Bridge Replacement, Bridge Key 14474, Project ID 100090
Project Allocation
2,000,000
(Base Project Allocation - $2,000,000)
(65) SR 3014, State Street Bridge over SR 0230 and Railroad, City of Harrisburg, Bridge Rehabilitation, Bridge Key 14539, Project ID 100134
Project Allocation
52,000,000
(Base Project Allocation - $52,000,000)
(66) SR 3013, 29th Street over Norfolk Southern Railway, Paxtang Borough, Bridge Replacement, Bridge Key 14537, Project ID 90838
Project Allocation
5,145,000
(Base Project Allocation - $5,145,000)
(67) SR 3013, 29th Street over I-83, Swatara Township, Bridge Rehabilitation, Bridge Key 14536, Project ID 99968
Project Allocation
818,000
(Base Project Allocation - $818,000)
(68) SR 3012 East over Susquehanna River, City of Harrisburg, Bridge Rehabilitation, Bridge Key 14531, Project ID 93177
Project Allocation
6,026,000
(Base Project Allocation - $6,026,000)
(69) SR 3012 West over Susquehanna River, City of Harrisburg, Bridge Rehabilitation, Bridge Key 14529, Project ID 93176
Project Allocation
4,689,000
(Base Project Allocation - $4,689,000)
(70) SR 3010 Westbound over I-83, Swatara Township, Bridge Rehabilitation, Bridge Key 14528, Project ID 99962
Project Allocation
1,100,000
(Base Project Allocation - $1,100,000)
(71) SR 3010 over Spring Creek, Swatara Township, Bridge Replacement, Bridge Key 14526, Project ID 100109
Project Allocation
2,000,000
(Base Project Allocation - $2,000,000)
(72) SR 3009 1.0 Mile South of Dauphin over Fishing Creek, Middle Paxton Township, Bridge Replacement, Bridge Key 14525, Project ID 100108
Project Allocation
2,400,000
(Base Project Allocation - $2,400,000)
(73) SR 3026 over I-83, Lower Paxton Township, Bridge Rehabilitation, Bridge Key 14561, Project ID 99975
Project Allocation
1,060,000
(Base Project Allocation - $1,060,000)
(74) SR 3009 1.0 Mile North of Harrisburg over Tributary of Susquehanna River, Susquehanna Township, Bridge Replacement, Bridge Key 14522, Project ID 99879
Project Allocation
900,000
(Base Project Allocation - $900,000)
(75) SR 2040, Rosedale Avenue over SR 3032, Lower Swatara Township, Bridge Rehabilitation, Bridge Key 14563, Project ID 99920
Project Allocation
2,000,000
(Base Project Allocation - $2,000,000)
(76) SR 3005, 40th Street over Norfolk Southern Railway, Swatara Township, Bridge Preservation, Bridge Key 14510, Project ID 99957
Project Allocation
500,000
(Base Project Allocation - $500,000)
(77) SR 2023 2.5 Miles East of Middletown over PA 283 and SR 0300, Londonderry Township, Bridge Rehabilitation, Bridge Key 14500, Project ID 99939
Project Allocation
2,000,000
(Base Project Allocation - $2,000,000)
(78) SR 2019 Northwest of Hummelstown over Tributary of Beaver Creek, Lower Paxton Township, Bridge Replacement, Bridge Key 14497, Project ID 100105
Project Allocation
900,000
(Base Project Allocation - $900,000)
(79) SR 2019 1.5 Miles Northwest of Hummelstown over Beaver Creek, South Hanover Township, Bridge Rehabilitation, Bridge Key 14493, Project ID 99934
Project Allocation
1,400,000
(Base Project Allocation - $1,400,000)
(80) SR 2015 2.0 Miles Northeast of Shellsville over Tributary of Manada Creek, East Hanover Township, Bridge Replacement, Bridge Key 14486, Project ID 90783
Project Allocation
900,000
(Base Project Allocation - $900,000)
(81) SR 2015 1.0 Mile North of Hershey over Swatara Creek, South Hanover Township, Bridge Rehabilitation, Bridge Key 14483, Project ID 80971
Project Allocation
1,630,000
(Base Project Allocation - $1,630,000)
(82) SR 2013 1.0 Mile Northeast of Deodate over Hoffer Creek, Conewago Township, Bridge Replacement, Bridge Key 14482, Project ID 100098
Project Allocation
1,100,000
(Base Project Allocation - $1,100,000)
(83) SR 2011 Hershey over Spring Creek, Derry Township, Bridge Rehabilitation, Bridge Key 14480, Project ID 100095
Project Allocation
340,000
(Base Project Allocation - $340,000)
(84) SR 2011 1.0 Mile North of Bachmanville over Tributary of Spring Creek, Derry Township, Bridge Replacement, Bridge Key 14476, Project ID 100208
Project Allocation
900,000
(Base Project Allocation - $900,000)
(85) SR 3009 0.5 Mile South of Rockville over Overflow of Wildwood Lake, Susquehanna Township, Bridge Replacement, Bridge Key 14523, Project ID 100263
Project Allocation
1,700,000
(Base Project Allocation - $1,700,000)
(86) SR 4013 Enterline over Tributary of Powells Creek, Wayne Township, Bridge Replacement, Bridge Key 14594, Project ID 100129
Project Allocation
800,000
(Base Project Allocation - $800,000)
(87) PA 25 2.5 Miles Northeast of Killinger over Little Wiconisco Creek, Upper Paxton Township, Bridge Replacement, Bridge Key 14191, Project ID 100001
Project Allocation
1,300,000
(Base Project Allocation - $1,300,000)
(88) SR 8037 Northbound over US 11 and 15, Reed Township, Bridge Rehabilitation, Bridge Key 14782, Project ID 99984
Project Allocation
560,000
(Base Project Allocation - $560,000)
(89) SR 8004 Westbound Ramp A, Clarks Ferry Bridge over Susquehanna River, Reed Township, Bridge Rehabilitation, Bridge Key 14769, Project ID 93178
Project Allocation
488,000
(Base Project Allocation - $417,000)
(Design & Contingencies - $71,000)
(90) SR 8004 Eastbound Ramp B, Clarks Ferry Bridge over Susquehanna River, Reed Township, Bridge Rehabilitation, Bridge Key 14768, Project ID 93178
Project Allocation
821,000
(Base Project Allocation - $702,000)
(Design & Contingencies - $119,000)
(91) SR 8003 Ramp A Interchange of I-81 and US 22 over SR 8003 Ramp C, Susquehanna Township, Bridge Rehabilitation, Bridge Key 14767, Project ID 80696
Project Allocation
3,154,000
(Base Project Allocation - $2,861,000)
(Design & Contingencies - $293,000)
(92) SR 8003 Ramp A Interchange of I-81 and US 22 over I-81, Susquehanna Township, Bridge Rehabilitation, Bridge Key 14766, Project ID 80696
Project Allocation
3,154,000
(Base Project Allocation - $2,861,000)
(Design & Contingencies - $293,000)
(93) SR 8003 Ramp C Interchange of I-81 and US 22 over I-81 and SR 8003 Ramp B, Susquehanna Township, Bridge Rehabilitation, Bridge Key 14765, Project ID 80696
Project Allocation
5,256,000
(Base Project Allocation - $4,768,000)
(Design & Contingencies - $488,000)
(94) SR 8003 Ramp B Interchange of I-81 and US 22 over I-81, Susquehanna Township, Bridge Rehabilitation, Bridge Key 14764, Project ID 80696
Project Allocation
5,256,000
(Base Project Allocation - $4,768,000)
(Design & Contingencies - $488,000)
(95) SR 4013 over Rattling Creek, Lykens Borough, Bridge Rehabilitation, Bridge Key 14604, Project ID 99980
Project Allocation
650,000
(Base Project Allocation - $650,000)
(96) SR 3024 3.0 Miles South of Linglestown over Tributary of Beaver Creek, Lower Paxton Township, Bridge Rehabilitation, Bridge Key 14560, Project ID 100117
Project Allocation
230,000
(Base Project Allocation - $230,000)
(97) SR 4013 0.5 Mile West of Carsonville over Tributary of Powells Creek, Jefferson Township, Bridge Replacement, Bridge Key 14595, Project ID 100221
Project Allocation
1,000,000
(Base Project Allocation - $1,000,000)
(98) SR 4013 0.75 Mile South of Lykens over Rattling Creek, Jackson Township, Bridge Replacement, Bridge Key 14602, Project ID 90849
Project Allocation
1,888,000
(Base Project Allocation - $1,888,000)
(99) SR 4010 3.0 Miles Northeast of Killinger over Tributary of Wiconisco Creek, Upper Paxton Township, Bridge Replacement, Bridge Key 14592, Project ID 100233
Project Allocation
1,000,000
(Base Project Allocation - $1,000,000)
(100) SR 4010 2.0 Miles East of Killinger over Little Wiconisco Creek, Upper Paxton Township, Bridge Replacement, Bridge Key 14591, Project ID 100123
Project Allocation
900,000
(Base Project Allocation - $900,000)
(101) SR 4006 0.5 Mile South of Fisherville over Armstrong Creek, Jackson Township, Bridge Replacement, Bridge Key 14585, Project ID 99885
Project Allocation
1,200,000
(Base Project Allocation - $1,200,000)
(102) SR 4006, Tourist Park Road over Gurdy Run, Halifax Township, Bridge Replacement, Bridge Key 14583, Project ID 90846
Project Allocation
445,000
(Base Project Allocation - $445,000)
(103) SR 4004 0.5 Mile North of Enders over Tributary of Armstrong Creek, Jackson Township, Bridge Rehabilitation, Bridge Key 14582, Project ID 100121
Project Allocation
200,000
(Base Project Allocation - $200,000)
(104) SR 4004 2.0 Miles West of Enders over Armstrong Creek, Jackson Township, Bridge Replacement, Bridge Key 14578, Project ID 87457
Project Allocation
111,000
(Base Project Allocation - $111,000)
(105) SR 4002 1.0 Mile South of Pillow over Tributary of Deep Creek, Lykens Township, Bridge Rehabilitation, Bridge Key 14575, Project ID 100119
Project Allocation
240,000
(Base Project Allocation - $240,000)
(106) SR 4002 1.0 Mile Northeast of Millersburg over Shippens Run, Upper Paxton Township, Bridge Replacement, Bridge Key 14572, Project ID 90844
Project Allocation
378,000
(Base Project Allocation - $378,000)
(107) SR 2042, TR 337 1.5 Miles North of Highspire over SR 3032, Lower Swatara Township, Bridge Rehabilitation, Bridge Key 14566, Project ID 99945
Project Allocation
2,000,000
(Base Project Allocation - $2,000,000)
(108) SR 4013 5.0 Miles Southwest of Lykens over North Fork of Powells Creek, Jefferson Township, Bridge Replacement, Bridge Key 14597, Project ID 100115
Project Allocation
900,000
(Base Project Allocation - $900,000)
(109) PA 283 Eastbound, SR 0300 over Conewago Creek, Conewago Township, Bridge Rehabilitation, Bridge Key 14364, Project ID 99880
Project Allocation
1,560,000
(Base Project Allocation - $1,560,000)
(110) PA 441 2.0 Miles Northeast of Highspire over SR 8020 Ramp A, Lower Swatara Township, Bridge Rehabilitation, Bridge Key 14391, Project ID 99900
Project Allocation
1,800,000
(Base Project Allocation - $1,800,000)
(111) PA 441 over Tributary of Susquehanna River, Royalton Borough, Bridge Replacement, Bridge Key 14388, Project ID 87456
Project Allocation
123,000
(Base Project Allocation - $123,000)
(112) US 422 Hershey over Spring Creek, Derry Township, Bridge Rehabilitation, Bridge Key 14386, Project ID 99899
Project Allocation
7,000,000
(Base Project Allocation - $7,000,000)
(113) US 422 1.0 Mile East of Hummelstown over US 322, Derry Township, Bridge Rehabilitation, Bridge Key 14384, Project ID 99895
Project Allocation
2,400,000
(Base Project Allocation - $2,400,000)
(114) PA 341 0.5 Mile East of Deodate over Hoffer Creek, Conewago Township, Bridge Replacement, Bridge Key 14382, Project ID 100272
Project Allocation
900,000
(Base Project Allocation - $900,000)
(115) US 322 1.0 Mile Southeast of Hershey over Spring Creek, Derry Township, Bridge Replacement, Bridge Key 14374, Project ID 87458
Project Allocation
481,000
(Land Allocation - $47,000)
(Design & Contingencies - $434,000)
(116) US 322 Westbound, Chambers Hill over SR 3030 and Abandoned Railroad, Swatara Township, Bridge Rehabilitation, Bridge Key 14370, Project ID 99892
Project Allocation
1,900,000
(Base Project Allocation - $1,900,000)
(117) US 322 Westbound, Eisenhower Interchange over SR 3001, Swatara Township, Bridge Replacement, Bridge Key 14368, Project ID 92931
Project Allocation
24,000
(Base Project Allocation - $18,000)
(Land Allocation - $4,000)
(Design & Contingencies - $2,000)
(118) PA 283 Westbound, SR 0300 over Conewago Creek, Conewago Township, Bridge Rehabilitation, Bridge Key 14366, Project ID 99884
Project Allocation
1,560,000
(Base Project Allocation - $1,560,000)
(119) PA 443 1.0 Mile East of Dauphin over SR 0022 Ramp P, Middle Paxton Township, Bridge Rehabilitation, Bridge Key 14396, Project ID 80977
Project Allocation
2,481,000
(Base Project Allocation - $1,677,000)
(Land Allocation - $35,000)
(Design & Contingencies - $769,000)
(120) PA 230 4.0 Miles Southeast of Middletown over Lynch Run, Londonderry Township, Bridge Replacement, Bridge Key 14336, Project ID 99888
Project Allocation
1,400,000
(Base Project Allocation - $1,400,000)
(121) US 322 Eastbound, Chambers Hill over SR 3030 and Abandoned Railroad, Swatara Township, Bridge Rehabilitation, Bridge Key 14369, Project ID 99890
Project Allocation
1,900,000
(Base Project Allocation - $1,900,000)
(122) PA 283 Westbound, SR 0300 5.0 Miles East of Middletown over TR 564, Conewago Township, Bridge Replacement, Bridge Key 14362, Project ID 90778
Project Allocation
5,544,000
(Base Project Allocation - $5,544,000)
(123) T-494/Schoolhouse Road 3.0 Miles East of Middletown over PA 283 and SR 0300, Londonderry Township, Bridge Rehabilitation, Bridge Key 14359, Project ID 99844
Project Allocation
2,200,000
(Base Project Allocation - $2,200,000)
(124) PA 283, SR 0300 Westbound 2.0 Miles East of Middletown over PA 341, Londonderry Township, Bridge Rehabilitation, Bridge Key 14358, Project ID 99889
Project Allocation
1,200,000
(Base Project Allocation - $1,200,000)
(125) PA 283, SR 0300 2.0 Miles East of Middletown over PA 341, Londonderry Township, Bridge Rehabilitation, Bridge Key 14357, Project ID 99886
Project Allocation
1,200,000
(Base Project Allocation - $1,200,000)
(126) I-283 Southbound over US 322 Westbound and SR 8030 Ramp E, Swatara Township, Bridge Replacement, Bridge Key 14345, Project ID 92931
Project Allocation
24,000
(Base Project Allocation - $18,000)
(Land Allocation - $4,000)
(Design & Contingencies - $2,000)
(127) I-283 Southbound over SR 8027 Ramp A, Swatara Township, Bridge Replacement, Bridge Key 14344, Project ID 92931
Project Allocation
24,000
(Base Project Allocation - $18,000)
(Land Allocation - $4,000)
(Design & Contingencies - $2,000)
(128) I-283 Northbound over SR 0322 Westbound Ramp K, Swatara Township, Bridge Replacement, Bridge Key 14343, Project ID 92931
Project Allocation
24,000
(Base Project Allocation - $18,000)
(Land Allocation - $4,000)
(Design & Contingencies - $2,000)
(129) PA 230 over Mill Race, Middletown Borough, Bridge Replacement, Bridge Key 14332, Project ID 99891
Project Allocation
2,200,000
(Base Project Allocation - $2,200,000)
(130) SR 8003 Ramp D Interchange of I-81 and US 22 over I-81 and US 22/322 Ramps A, B and C, City of Harrisburg, Bridge Rehabilitation, Bridge Key 14763, Project ID 80696
Project Allocation
8,410,000
(Base Project Allocation - $7,629,000)
(Design & Contingencies - $781,000)
(131) PA 283 Westbound, SR 0300 6.0 Miles East of Middletown over TR 602, Conewago Township, Bridge Rehabilitation, Bridge Key 14365, Project ID 100056
Project Allocation
1,400,000
(Base Project Allocation - $1,400,000)
(132) SR 2003 0.5 Mile South of Hummelstown over SR 0322, Derry Township, Bridge Rehabilitation, Bridge Key 14457, Project ID 99915
Project Allocation
1,700,000
(Base Project Allocation - $1,700,000)
(133) SR 2007 4.0 Miles East of Middletown over SR 0300, Londonderry Township, Bridge Rehabilitation, Bridge Key 14471, Project ID 99925
Project Allocation
1,650,000
(Base Project Allocation - $1,650,000)
(134) SR 2007 5.0 Miles Southeast of Middletown over Conewago Creek, Londonderry Township, Bridge Rehabilitation, Bridge Key 14468, Project ID 99922
Project Allocation
1,001,000
(Base Project Allocation - $1,001,000)
(135) US 322, Eisenhower Interchange over SR 3001 and I-283, Swatara Township, Bridge Replacement, Bridge Key 14367, Project ID 92931
Project Allocation
24,000
(Base Project Allocation - $18,000)
(Land Allocation - $4,000)
(Design & Contingencies - $2,000)
(136) SR 2005 1.5 Miles East of Middletown over Iron Mine Run, Londonderry Township, Bridge Replacement, Bridge Key 14462, Project ID 90781
Project Allocation
525,000
(Base Project Allocation - $525,000)
(137) PA 443, Fort Hunter over Norfolk Southern Railway, Middle Paxton Township, Bridge Rehabilitation, Bridge Key 14397, Project ID 80978
Project Allocation
3,000,000
(Base Project Allocation - $3,000,000)
(138) SR 1023 2.0 Miles Northwest of Carsonville over Tributary of Armstrong Creek, Jackson Township, Bridge Replacement, Bridge Key 14447, Project ID 100258
Project Allocation
1,200,000
(Base Project Allocation - $1,200,000)
(139) SR 1021 1.5 Miles Northwest of Elizabethville over Tributary of Wiconisco Creek, Washington Township, Bridge Replacement, Bridge Key 14445, Project ID 100253
Project Allocation
1,200,000
(Base Project Allocation - $1,200,000)
(140) SR 1020 1.5 Miles Northwest of Gratz over Tributary of Deep Creek, Lykens Township, Bridge Replacement, Bridge Key 14443, Project ID 99876
Project Allocation
900,000
(Base Project Allocation - $900,000)
(141) SR 1018 3.0 Miles North of Gratz over Deep Creek, Lykens Township, Bridge Replacement, Bridge Key 14441, Project ID 100078
Project Allocation
1,100,000
(Base Project Allocation - $1,100,000)
(142) SR 1017 3.0 Miles East of Gratz over Tributary of Pine Creek, Lykens Township, Bridge Replacement, Bridge Key 14440, Project ID 87459
Project Allocation
111,000
(Base Project Allocation - $111,000)
(143) SR 1017 3.0 Miles East of Gratz Borough over Tributary of Pine Creek, Lykens Township, Bridge Replacement, Bridge Key 14438, Project ID 100074
Project Allocation
900,000
(Base Project Allocation - $900,000)
(144) SR 1003 1.5 Miles South of Elizabethville over North Branch of Armstrong Creek, Jackson Township, Bridge Replacement, Bridge Key 14422, Project ID 87653
Project Allocation
51,000
(Base Project Allocation - $51,000)
(145) SR 2005 1.5 Miles East of Middletown over Iron Mine Run, Londonderry Township, Bridge Rehabilitation, Bridge Key 14463, Project ID 100083
Project Allocation
154,000
(Base Project Allocation - $154,000)
(146) SR 1016 1.5 Miles Northwest of Gratz over Tributary of Deep Creek, Lykens Township, Bridge Replacement, Bridge Key 14437, Project ID 100241
Project Allocation
1,100,000
(Base Project Allocation - $1,100,000)
(147) PA 743 Hershey over Spring Creek, Derry Township, Bridge Replacement, Bridge Key 14415, Project ID 87455
Project Allocation
486,000
(Base Project Allocation - $326,000)
(Design & Contingencies - $160,000)
(148) SR 1003 3.5 Miles South of Elizabethville over Tributary of Armstrong Creek, Jackson Township, Bridge Rehabilitation, Bridge Key 14421, Project ID 100063
Project Allocation
140,000
(Base Project Allocation - $140,000)
(149) SR 1005 over Wiconisco Creek, Williams Township, Bridge Rehabilitation, Bridge Key 14424, Project ID 100068
Project Allocation
460,000
(Base Project Allocation - $460,000)
(150) SR 1007 1.5 Miles Northwest of Elizabethville over Wiconisco Creek, Washington Township, Bridge Rehabilitation, Bridge Key 14426, Project ID 99912
Project Allocation
1,500,000
(Base Project Allocation - $1,500,000)
(151) SR 1013 3.0 Miles Northeast of Gratz over Pine Creek, Lykens Township, Bridge Rehabilitation, Bridge Key 14431, Project ID 99913
Project Allocation
980,000
(Base Project Allocation - $980,000)
(152) SR 1014 Southwest of Gratz over Tributary of Wiconisco Creek, Lykens Township, Bridge Rehabilitation, Bridge Key 14434, Project ID 87651
Project Allocation
1,209,000
(Base Project Allocation - $854,000)
(Design & Contingencies - $355,000)
(153) PA 743 Hershey over Tributary of Spring Creek, Derry Township, Bridge Replacement, Bridge Key 14413, Project ID 100059
Project Allocation
1,500,000
(Base Project Allocation - $1,500,000)
(154) SR 1002 over Bear Creek, Wiconisco Township, Bridge Rehabilitation, Bridge Key 14419, Project ID 100060
Project Allocation
300,000
(Base Project Allocation - $300,000)
(155) SR 0039 over Swatara Creek, Derry Township, Bridge Replacement, Bridge No.22003903300000
Project Allocation
7,260,000
(Base Project Allocation - $5,500,000)
(Land Allocation - $500,000)
(Design & Contingencies - $1,260,000)
(156) Norfolk Southern Railway Bridge over Ridge Road, Derry Township, Bridge Replacement
Project Allocation
28,900,000
(Base Project Allocation - $20,400,000)
(Land Allocation - $4,000,000)
(Design & Contingencies - $4,500,000)
(157) SR 2018, West Main Street over Swatara Creek, Hummelstown Borough, Bridge Replacement
Project Allocation
7,150,000
(Base Project Allocation - $6,435,000)
(Design & Contingencies - $715,000)
(158) SR 2003, North Hanover Street over Swatara Creek, Hummelstown Borough, Bridge Replacement
Project Allocation
7,500,000
(Base Project Allocation - $6,750,000)
(Design & Contingencies - $750,000)
(159) Various State-Owned Bridges over Various Spans, Various Municipalities, Bridge Preservation, Bridge Key 0, Project ID 0
Project Allocation
1,100,000
(Base Project Allocation - $1,000,000)
(Design & Contingencies - $100,000)