Act 127 of 2014, § 44, under HIGHWAY-RAILROAD AND HIGHWAY BRIDGE CAPITAL BUDGET SUPPLEMENTAL ACT FOR 2014-2015 - ENACTMENT.

Act 127 of 2014, § 44

Section 44. Luzerne County.

(a) Local Bridges

Local

State

(1) Various Municipalities, Various Local Bridges over Various Spans, Bridge Preservation, Bridge Key 0, Project ID 0

Project Allocation

1,100,000

(Base Project Allocation - $1,000,000)

(Design & Contingencies - $100,000)

(b) State Bridges

(1) I-80 Eastbound over County Road and Nescopeck Creek, Black Creek, Butler and Sugarloaf Townships, Bridge Rehabilitation, Bridge Key 23669, Project ID 91587

Project Allocation

1,850,000

(Base Project Allocation - $1,850,000)

(2) SR 2036 262 Feet East of SR 2039 over Mill Creek, Bear Creek Township, Bridge Replacement, Bridge Key 24126, Project ID 93033

Project Allocation

2,000

(Base Project Allocation - $1,000)

(Design & Contingencies - $1,000)

(3) SR 4026, Pritchard Road 0.2 Mile East of SR 4029 over Lewis Run, Hunlock Township, Bridge Replacement, Bridge Key 24349, Project ID 93044

Project Allocation

2,000

(Base Project Allocation - $1,000)

(Design & Contingencies - $1,000)

(4) SR 4015 Bethel Hill over Kitchen Creek, Fairmount Township, Bridge Preservation, Bridge Key 24309, Project ID 101387

Project Allocation

1,005,000

(Base Project Allocation - $315,000)

(Design & Contingencies - $690,000)

(5) SR 3006 300 Feet East of SR 3005 over Pond Creek, Conyngham Township, Bridge Replacement, Bridge Key 24186, Project ID 93035

Project Allocation

2,000

(Base Project Allocation - $1,000)

(Design & Contingencies - $1,000)

(6) SR 3010 Alberdeen Road 2.3 Miles East of SR 3007 over Branch of Wapwallopen Creek, Dorrance Township, Bridge Replacement, Bridge Key 24200, Project ID 93036

Project Allocation

2,000

(Base Project Allocation - $1,000)

(Design & Contingencies - $1,000)

(7) SR 3021 300 Feet South of SR 3040 over Nescopeck Creek, Butler Township, Bridge Rehabilitation, Bridge Key 24234, Project ID 93039

Project Allocation

2,000

(Base Project Allocation - $1,000)

(Design & Contingencies - $1,000)

(8) SR 3024 0.4 Mile South of SR 3020 over Black Creek, Sugarloaf Township, Bridge Rehabilitation, Bridge Key 24237, Project ID 102000

Project Allocation

290,000

(Base Project Allocation - $113,000)

(Land Allocation - $12,000)

(Design & Contingencies - $165,000)

(9) SR 3034, Main Street 0.3 Mile East of TR 93 over Branch of Little Nescopeck Creek, Conyngham Borough, Bridge Replacement, Bridge Key 24239, Project ID 93040

Project Allocation

3,000

(Base Project Allocation - $1,000)

(Land Allocation - $1,000)

(Design & Contingencies - $1,000)

(10) SR 2040, Buck River Road 1.3 Miles East of TR 115 over Kendall Creek, Buck Township, Bridge Replacement, Bridge Key 24134, Project ID 94303

Project Allocation

1,281,000

(Base Project Allocation - $463,000)

(Design & Contingencies - $818,000)

(11) SR 4016 0.2 Mile West of SR 4006 over Branch of Shickshinny Creek, Union Township, Bridge Replacement, Bridge Key 24314, Project ID 93041

Project Allocation

2,000

(Base Project Allocation - $1,000)

(Design & Contingencies - $1,000)

(12) SR 4020 0.5 Mile East of SR 4033 over Pine Creek, Fairmount Township, Bridge Replacement, Bridge Key 24332, Project ID 93019

Project Allocation

2,000

(Base Project Allocation - $1,000)

(Design & Contingencies - $1,000)

(13) SR 4024, Talcott Road 144 Feet East of SR 4015 over Huntington Creek, Fairmount Township, Bridge Rehabilitation, Bridge Key 24333, Project ID 93043

Project Allocation

2,000

(Base Project Allocation - $1,000)

(Design & Contingencies - $1,000)

(14) SR 4026 Junction with SR 4029 over Roaring Brook, Hunlock Township, Bridge Replacement, Bridge Key 24348, Project ID 89914

Project Allocation

1,049,000

(Base Project Allocation - $285,000)

(Design & Contingencies - $764,000)

(15) SR 4037, Stone Church Road 0.6 Mile West of TR 11 over Stone Church Hollow Creek, Salem Township, Bridge Replacement, Bridge Key 24362, Project ID 93045

Project Allocation

2,000

(Base Project Allocation - $1,000)

(Design & Contingencies - $1,000)

(16) SR 8005 Ramp over I-80 Westbound, Butler Township, Bridge Replacement, Bridge Key 24493, Project ID 97506

Project Allocation

2,103,000

(Base Project Allocation - $1,001,000)

(Design & Contingencies - $1,102,000)

(17) I-80 Westbound over Nescopeck Creek, Black Creek, Butler and Sugarloaf Townships, Bridge Rehabilitation, Bridge Key 23646, Project ID 91587

Project Allocation

1,850,000

(Base Project Allocation - $1,850,000)

(18) SR 2035, Suscon Road 1.1 Miles North of SR 2036 over Branch of Bear Creek, Jenkins Township, Bridge Replacement, Bridge Key 24122, Project ID 93032

Project Allocation

2,000

(Base Project Allocation - $1,000)

(Design & Contingencies - $1,000)

(19) SR 4025 0.7 Mile North of SR 4026 over Roaring Brook, Hunlock Township, Bridge Replacement, Bridge Key 24346, Project ID 89913

Project Allocation

1,129,000

(Base Project Allocation - $345,000)

(Design & Contingencies - $784,000)

(20) I-81 Southbound over SR 8011 Ramp A, Hanover Township, Bridge Rehabilitation, Bridge Key 23731, Project ID 87799

Project Allocation

1,304,000

(Base Project Allocation - $1,070,000)

(Design & Contingencies - $234,000)

(21) SR 0118 over Branch of Harveys Creek, Lehman Township, Bridge Replacement, Bridge Key 23823, Project ID 93001

Project Allocation

2,475,000

(Base Project Allocation - $1,680,000)

(Design & Contingencies - $795,000)

(22) SR 0092 153 Feet North of SR 1040 over Lewis Creek, Exeter Township, Bridge Replacement, Bridge Key 23779, Project ID 100496

Project Allocation

1,097,000

(Base Project Allocation - $321,000)

(Design & Contingencies - $776,000)

(23) I-81 Southbound over SR 2007, East Northampton Street, Wilkes-Barre Township, Bridge Rehabilitation, Bridge Key 23743, Project ID 87801

Project Allocation

1,839,000

(Base Project Allocation - $1,544,000)

(Design & Contingencies - $295,000)

(24) I-81 Northbound over SR 2007, Northampton Street, Wilkes-Barre Township, Bridge Rehabilitation, Bridge Key 23741, Project ID 87801

Project Allocation

1,839,000

(Base Project Allocation - $1,544,000)

(Design & Contingencies - $295,000)

(25) I-81 Southbound over Johnson Street and Branch of Solomon Creek, Wilkes-Barre Township, Bridge Rehabilitation, Bridge Key 23740, Project ID 87801

Project Allocation

1,839,000

(Base Project Allocation - $1,544,000)

(Design & Contingencies - $295,000)

(26) SR 2035, Suscon Road 346 Feet North of SR 2038 over Meadow Run, Bear Creek Township, Bridge Rehabilitation, Bridge Key 24119, Project ID 93027

Project Allocation

2,000

(Base Project Allocation - $1,000)

(Design & Contingencies - $1,000)

(27) I-81 Northbound over Luzerne County Rail Authority, Ashley Borough, Hanover and Wilkes- Barre Townships, Bridge Rehabilitation, Bridge Key 23738, Project ID 87800

Project Allocation

2,402,000

(Base Project Allocation - $2,030,000)

(Design & Contingencies - $372,000)

(28) I-80 Westbound over SR 0093 Exit 253, Black Creek, Butler and Sugarloaf Townships, Bridge Rehabilitation, Bridge Key 23651, Project ID 91587

Project Allocation

1,850,000

(Base Project Allocation - $1,850,000)

(29) SR 0239 over Tributary of Pine Creek, Huntington Township, Bridge Replacement, Bridge Key 23844, Project ID 93002

Project Allocation

396,000

(Base Project Allocation - $336,000)

(Design & Contingencies - $60,000)

(30) I-81 Northbound over SR 6309, Ashley Borough, Hanover and Wilkes-Barre Townships, Bridge Rehabilitation, Bridge Key 23735, Project ID 87800

Project Allocation

2,402,000

(Base Project Allocation - $2,030,000)

(Design & Contingencies - $372,000)

(31) I-81 Northbound over Johnson Street and Branch of Solomon Creek, Wilkes-Barre Township, Bridge Rehabilitation, Bridge Key 23739, Project ID 87801

Project Allocation

1,839,000

(Base Project Allocation - $1,544,000)

(Design & Contingencies - $295,000)

(32) I-81 Northbound over SR 8011, Hanover Township, Bridge Rehabilitation, Bridge Key 23729, Project ID 87799

Project Allocation

1,304,000

(Base Project Allocation - $1,070,000)

(Design & Contingencies - $234,000)

(33) I-80 Westbound over County Road and Nescopeck Creek, Black Creek, Butler and Sugarloaf Townships, Bridge Rehabilitation, Bridge Key 23670, Project ID 91587

Project Allocation

1,850,000

(Base Project Allocation - $1,850,000)

(34) (Reserved).

(35) I-80 Westbound over SR 0309, Black Creek, Butler and Sugarloaf Townships, Bridge Rehabilitation, Bridge Key 23667, Project ID 91587

Project Allocation

1,850,000

(Base Project Allocation - $1,850,000)

(36) I-80 Eastbound over SR 0309, Black Creek, Butler and Sugarloaf Townships, Bridge Rehabilitation, Bridge Key 23666, Project ID 91587

Project Allocation

1,850,000

(Base Project Allocation - $1,850,000)

(37) I-80 Eastbound over I-81 Exit 151A, Black Creek, Butler and Sugarloaf Townships, Bridge Rehabilitation, Bridge Key 23658, Project ID 91587

Project Allocation

1,850,000

(Base Project Allocation - $1,850,000)

(38) I-80 Eastbound over SR 0093 Exit 256, Black Creek, Butler and Sugarloaf Townships, Bridge Rehabilitation, Bridge Key 23650, Project ID 91587

Project Allocation

1,850,000

(Base Project Allocation - $1,850,000)

(39) I-80 Eastbound over Nescopeck Creek, Black Creek, Butler and Sugarloaf Townships, Bridge Rehabilitation, Bridge Key 23645, Project ID 91587

Project Allocation

1,850,000

(Base Project Allocation - $1,850,000)

(40) SR 0029 1.0 Mile South of TR 118 over Pikes Creek, Lehman Township, Bridge Rehabilitation, Bridge Key 23636, Project ID 101386

Project Allocation

909,000

(Base Project Allocation - $186,000)

(Design & Contingencies - $723,000)

(41) I-81 Southbound over SR 2003, Hazelton Street, Ashley Borough and Hanover and Wilkes-Barre Townships, Bridge Rehabilitation, Bridge Key 23736, Project ID 87800

Project Allocation

2,402,000

(Base Project Allocation - $2,030,000)

(Design & Contingencies - $372,000)

(42) SR 2008, Middle Road over SR 0029, TR 29, Hanover Township, Bridge Replacement, Bridge Key 24080, Project ID 93021

Project Allocation

17,800,000

(Base Project Allocation - $17,000,000)

(Design & Contingencies - $800,000)

(43) SR 2019, Oak Street over SR 0081, I-81, Pittston Township, Bridge Replacement, Bridge Key 24100, Project ID 69001

Project Allocation

24,674,000

(Base Project Allocation - $23,363,000)

(Land Allocation - $89,000)

(Design & Contingencies - $1,222,000)

(44) SR 2017 over SR 2021, Jenkins Township, Bridge Replacement, Bridge Key 24099, Project ID 93025

Project Allocation

2,000

(Base Project Allocation - $1,000)

(Design & Contingencies - $1,000)

(45) SR 2015 286 Feet North of SR 2026 over Gardner Creek, Laflin Borough, Bridge Replacement, Bridge Key 24097, Project ID 93022

Project Allocation

2,000

(Base Project Allocation - $1,000)

(Design & Contingencies - $1,000)

(46) I-81 Southbound over Luzerne County Rail Authority, Ashley Borough and Hanover and Wilkes-Barre Townships, Bridge Rehabilitation, Bridge Key 23737, Project ID 87800

Project Allocation

2,402,000

(Base Project Allocation - $2,030,000)

(Design & Contingencies - $372,000)

(47) SR 2010, Main Street 0.1 Mile East of SR 2003 over Pocono Northeast Railroad, Ashley Borough, Bridge Rehabilitation, Bridge Key 24093, Project ID 102000

Project Allocation

675,000

(Base Project Allocation - $263,000)

(Land Allocation - $28,000)

(Design & Contingencies - $384,000)

(48) SR 0309, TR 309 over Nescopeck Creek, Butler Township, Bridge Replacement, Bridge Key 23851, Project ID 93006

Project Allocation

13,900,000

(Base Project Allocation - $13,300,000)

(Design & Contingencies - $600,000)

(49) SR 1044 1.0 Mile East of SR 1029 over Abraham's Creek, Kingston Township, Bridge Replacement, Bridge Key 24026, Project ID 96722

Project Allocation

1,326,000

(Base Project Allocation - $729,000)

(Land Allocation - $67,000)

(Design & Contingencies - $530,000)

(50) SR 1036, Carverton Road 0.1 Mile West of SR 1021 over Abraham's Creek, Kingston Township, Bridge Rehabilitation, Bridge Key 24019, Project ID 101388

Project Allocation

1,004,000

(Base Project Allocation - $253,000)

(Design & Contingencies - $751,000)

(51) SR 1036, Carverton Road Junction with TR 309 over Toby Creek, Kingston Township, Bridge Rehabilitation, Bridge Key 24015, Project ID 102000

Project Allocation

503,000

(Base Project Allocation - $196,000)

(Land Allocation - $21,000)

(Design & Contingencies - $286,000)

(52) SR 1006, Rutter Avenue over SR 0309, TR 309, Kingston Borough, Bridge Rehabilitation, Bridge Key 23964, Project ID 92882

Project Allocation

3,000

(Base Project Allocation - $1,000)

(Land Allocation - $1,000)

(Design & Contingencies - $1,000)

(53) SR 1005, Huntsville Road 0.1 Mile North of SR 1012 over Beckers Creek, Jackson Township, Bridge Replacement, Bridge Key 23962, Project ID 100508

Project Allocation

921,000

(Base Project Allocation - $194,000)

(Design & Contingencies - $727,000)

(54) SR 0309 0.2 Mile North of SR 1015 over Luzerne County Rail Authority, Luzerne Borough, Bridge Rehabilitation, Bridge Key 23885, Project ID 92883

Project Allocation

6,014,000

(Base Project Allocation - $5,241,000)

(Land Allocation - $47,000)

(Design & Contingencies - $726,000)

(55) SR 0437, TR 437 3.5 Miles North of SR 2048 over Tributary of Creasy Creek, Dennison Township, Bridge Replacement, Bridge Key 23936, Project ID 93018

Project Allocation

949,000

(Base Project Allocation - $1,000)

(Land Allocation - $56,000)

(Design & Contingencies - $892,000)

(56) TR 309, Cross Valley over Toby Creek, Courtdale Borough, Bridge Rehabilitation, Bridge Key 23893, Project ID 97943

Project Allocation

3,850,000

(Base Project Allocation - $3,500,000)

(Design & Contingencies - $350,000)

(57) TR 309, Cross Valley over Toby Creek, Kingston Township, Bridge Replacement, Bridge Key 23892, Project ID 97942

Project Allocation

6,850,000

(Base Project Allocation - $6,500,000)

(Design & Contingencies - $350,000)

(58) SR 0309, TR 309 over SR 8039 Ramp A, Luzerne Borough, Bridge Rehabilitation, Bridge Key 23891, Project ID 97941

Project Allocation

3,595,000

(Base Project Allocation - $2,543,000)

(Design & Contingencies - $1,052,000)

(59) SR 0309 over SR 1013, Pringle and Luzerne Boroughs, Bridge Preservation, Bridge Key 23887, Project ID 92884

Project Allocation

3,808,000

(Base Project Allocation - $3,808,000)

(60) SR 0309 Northbound and Southbound over Vaughn Street and Abandoned Railroad, Luzerne Borough, Bridge Rehabilitation, Bridge Key 23886, Project ID 92883

Project Allocation

3,000

(Base Project Allocation - $1,000)

(Land Allocation - $1,000)

(Design & Contingencies - $1,000)

(61) SR 0309 over TR 11, Wyoming Avenue, Luzerne Borough, Bridge Preservation, Bridge Key 23882, Project ID 102065

Project Allocation

2,274,000

(Base Project Allocation - $1,584,000)

(Design & Contingencies - $690,000)

(62) SR 0309 over SR 2004, L&S Railroad and Susquehanna River, Plains Township, Bridge Rehabilitation, Bridge Key 23880, Project ID 89012

Project Allocation

5,637,000

(Base Project Allocation - $5,637,000)

(63) SR 0437 0.1 Mile East of TR 309 over Reading, Blue Mountain and Northern Railroads, Fairview Township, Bridge Rehabilitation, Bridge Key 23944, Project ID 101927

Project Allocation

1,257,000

(Base Project Allocation - $444,000)

(Design & Contingencies - $813,000)

(64) SR 2042 over Branch of Little Wapwallopen Creek, Dorrance Township, Bridge Replacement, Bridge Key 47081, Project ID 96724

Project Allocation

955,000

(Base Project Allocation - $358,000)

(Land Allocation - $120,000)

(Design & Contingencies - $477,000)

(65) SR 1021 over Sutton Creek, Franklin Township, Bridge Replacement, Bridge Key 44212, Project ID 93020

Project Allocation

2,000

(Base Project Allocation - $1,000)

(Design & Contingencies - $1,000)

(66) SR 1025 Schooley 1.0 Mile South of SR 1031 over Hicks Creek, Exeter Township, Bridge Replacement, Bridge Key 40281, Project ID 89712

Project Allocation

875,000

(Base Project Allocation - $423,000)

(Design & Contingencies - $452,000)

(67) SR 1012, Chase Road over Tributary of Harvey's Creek, Jackson Township, Bridge Replacement, Bridge Key 42230, Project ID 96721

Project Allocation

1,161,000

(Base Project Allocation - $523,000)

(Land Allocation - $128,000)

(Design & Contingencies - $510,000)

(68) Rodgers Avenue over Solomon Creek, Ashley Borough, Bridge Rehabilitation

Project Allocation

82,000

(Base Project Allocation - $82,000)

(69) Carey Street over Solomon Creek, Ashley Borough, Bridge Replacement

Project Allocation

1,300,000

(Base Project Allocation - $1,300,000)

(70) SR 0011, Narrows Road over Toby Creek, Larksville Borough, Bridge Rehabilitation

Project Allocation

60,000

(Base Project Allocation - $60,000)

(71) Rodgers Avenue over Solomon Creek, Ashley Borough, Bridge Restoration

Project Allocation

1,300,000

(Base Project Allocation - $1,300,000)

(72) Loomis Park Road Bridge No. 40740118150001 over Solomon Creek, Hanover Township, Bridge Restoration

Project Allocation

568,000

(Base Project Allocation - $568,000)

(73) SR 7304, North Washington Street Bridge No.40730400000812 over Luzerne and Susquehanna Railroad, City of Wilkes-Barre, Bridge Restoration

Project Allocation

1,400,000

(Base Project Allocation - $1,400,000)

(74) Division Street over Solomon Creek, City of Wilkes-Barre, Bridge Rehabilitation

Project Allocation

750,000

(Base Project Allocation - $750,000)

(75) Carey Street Bridge No.40740103010002 over Solomon Creek, Ashley Borough, Bridge Replacement

Project Allocation

99,000

(Base Project Allocation - $99,000)

(76) South Street over Warrior Creek, Hanover Township, Bridge Replacement

Project Allocation

645,000

(Base Project Allocation - $645,000)

(77) North Market Street over Newport Creek, City of Nanticoke, Bridge Replacement

Project Allocation

750,000

(Base Project Allocation - $650,000)

(Design & Contingencies - $100,000)

(78) Clarks Cross Road over Nanticoke Creek, Hanover Township, Bridge Replacement

Project Allocation

585,000

(Base Project Allocation - $585,000)

(79) (Reserved).

(80) Rodgers Avenue over Solomon Creek, Ashley Borough, Bridge Restoration

Project Allocation

1,300,000

(Base Project Allocation - $1,300,000)

(81) Loomis Park Road Bridge No.40740118150001 over Solomon Creek, Hanover Township, Bridge Restoration

Project Allocation

568,000

(Base Project Allocation - $568,000)

(82) SR 7304, North Washington Street Bridge No.40730400000812 over Luzerne and Susquehanna Railroad, City of Wilkes-Barre, Bridge Restoration

Project Allocation

1,400,000

(Base Project Allocation - $1,400,000)

(83) Division Street over Solomon Creek, City of Wilkes-Barre, Bridge Rehabilitation

Project Allocation

750,000

(Base Project Allocation - $750,000)

(84) Various State-Owned Bridges over Various Spans, Various Municipalities, Bridge Preservation, Bridge Key 0, Project ID 0

Project Allocation

1,100,000

(Base Project Allocation - $1,000,000)

(Design & Contingencies - $100,000)