Lycoming County

Act 127 of 2014, § 45, under HIGHWAY-RAILROAD AND HIGHWAY BRIDGE CAPITAL BUDGET SUPPLEMENTAL ACT FOR 2014-2015 - ENACTMENT.

Act 127 of 2014, § 45

Section 45. Lycoming County.

(a) Local Bridges

Local

State

(1) Muncy Creek Township, T-437 over Tributary of Little Muncy Creek, Bridge Replacement, Bridge Key 25115, Project ID 87897

Project Allocation

290,000

(Base Project Allocation - $290,000)

(2) Jersey Shore Borough, Allegheny Street, SR 3028 from Oliver Street to Wylie Street over Parallel Culvert, Bridge Replacement, Bridge Key 0, Project ID 93947

Project Allocation

1,440,000

(Base Project Allocation - $1,440,000)

(3) South Williamsport Borough, East 7th Avenue over Hagermans Run, Bridge Rehabilitation

Project Allocation

100,000

(Base Project Allocation - $80,000)

(Design & Contingencies - $20,000)

(4) Jersey Shore Borough, Hazel Alley over Pfouts Run, Bridge Rehabilitation

Project Allocation

28,000

(Base Project Allocation - $23,000)

(Design & Contingencies - $5,000)

(5) Montgomery Borough, Montgomery Park Road over Adams Creek, Bridge Rehabilitation

Project Allocation

250,000

(Base Project Allocation - $200,000)

(Design & Contingencies - $50,000)

(6) City Of Williamsport, Southview Avenue over Grafius Run, Bridge Replacement

Project Allocation

280,000

(Base Project Allocation - $224,000)

(Design & Contingencies - $56,000)

(7) Wolf Township, T-145 over Laurel Run, Bridge Rehabilitation

Project Allocation

16,000

(Base Project Allocation - $13,000)

(Design & Contingencies - $3,000)

(8) Wolf Township, T-250 over Gregs Run, Bridge Replacement

Project Allocation

173,000

(Base Project Allocation - $139,000)

(Design & Contingencies - $34,000)

(9) Limestone Township, T-305 over Tributary of Adams Creek, Bridge Rehabilitation

Project Allocation

12,000

(Base Project Allocation - $10,000)

(Design & Contingencies - $2,000)

(10) Lewis Township, T-319 over Pleasant Stream, Bridge Replacement

Project Allocation

1,270,000

(Base Project Allocation - $1,016,000)

(Design & Contingencies - $254,000)

(11) Woodward Township, T-375 over Quenshukeny Run, Bridge Replacement

Project Allocation

981,000

(Base Project Allocation - $785,000)

(Design & Contingencies - $196,000)

(12) Susquehanna Township, T-392 over Bender Run, Bridge Rehabilitation

Project Allocation

20,000

(Base Project Allocation - $16,000)

(Design & Contingencies - $4,000)

(13) Susquehanna Township, T-392 over West Branch of Bender Run, Bridge Rehabilitation

Project Allocation

11,000

(Base Project Allocation - $9,000)

(Design & Contingencies - $2,000)

(14) Loyalsock Township, T-447 over Grafius Run, Bridge Rehabilitation

Project Allocation

21,000

(Base Project Allocation - $17,000)

(Design & Contingencies - $4,000)

(15) Franklin Township, T-463 over Laurel Run, Bridge Rehabilitation

Project Allocation

360,000

(Base Project Allocation - $288,000)

(Design & Contingencies - $72,000)

(16) Franklin Township, T-463 over Laurel Run, Bridge Replacement

Project Allocation

380,000

(Base Project Allocation - $304,000)

(Design & Contingencies - $76,000)

(17) Franklin Township, T-465 over Tributary of German Run, Bridge Rehabilitation

Project Allocation

40,000

(Base Project Allocation - $32,000)

(Design & Contingencies - $8,000)

(18) Franklin Township, T-469 over German Run, Bridge Replacement

Project Allocation

320,000

(Base Project Allocation - $256,000)

(Design & Contingencies - $64,000)

(19) Lewis Township, T-506 over Daugherty Run, Bridge Replacement

Project Allocation

470,000

(Base Project Allocation - $376,000)

(Design & Contingencies - $94,000)

(20) Loyalsock Township, T-508 over Tributary of Mill Creek, Bridge Rehabilitation

Project Allocation

55,000

(Base Project Allocation - $44,000)

(Design & Contingencies - $11,000)

(21) Muncy Township, T-516 over Oak Run, Bridge Rehabilitation

Project Allocation

29,000

(Base Project Allocation - $24,000)

(Design & Contingencies - $5,000)

(22) Jordan Township, T-530 over West Branch of Little Muncy Creek, Bridge Replacement

Project Allocation

779,000

(Base Project Allocation - $623,000)

(Design & Contingencies - $156,000)

(23) Clinton Township, T-531 over Adams Creek, Bridge Rehabilitation

Project Allocation

17,000

(Base Project Allocation - $14,000)

(Design & Contingencies - $3,000)

(24) Mifflin Township, T-538 over Tributary of Larrys Creek, Bridge Rehabilitation

Project Allocation

26,000

(Base Project Allocation - $21,000)

(Design & Contingencies - $5,000)

(25) Fairfield Township, T-541 over Tules Run, Bridge Rehabilitation

Project Allocation

250,000

(Base Project Allocation - $200,000)

(Design & Contingencies - $50,000)

(26) Fairfield Township, T-543 over Bennetts Run, Bridge Replacement

Project Allocation

300,000

(Base Project Allocation - $240,000)

(Design & Contingencies - $60,000)

(27) Muncy Township, T-547 over Carpenters Run, Bridge Rehabilitation

Project Allocation

27,000

(Base Project Allocation - $22,000)

(Design & Contingencies - $5,000)

(28) Penn Township, T-557 over Gregs Run, Bridge Replacement

Project Allocation

750,000

(Base Project Allocation - $600,000)

(Design & Contingencies - $150,000)

(29) Penn Township, T-562 over Mill Creek, Bridge Replacement

Project Allocation

693,000

(Base Project Allocation - $554,000)

(Design & Contingencies - $139,000)

(30) Penn Township, T-571 over Beaver Run, Bridge Replacement

Project Allocation

550,000

(Base Project Allocation - $440,000)

(Design & Contingencies - $110,000)

(31) Mill Creek Township, T-576 over Mill Creek, Bridge Rehabilitation

Project Allocation

10,000

(Base Project Allocation - $8,000)

(Design & Contingencies - $2,000)

(32) Mill Creek Township, T-586 over West Branch of Glade Run, Bridge Rehabilitation

Project Allocation

41,000

(Base Project Allocation - $33,000)

(Design & Contingencies - $8,000)

(33) Loyalsock Township, T-616 over McClures Run, Bridge Rehabilitation

Project Allocation

30,000

(Base Project Allocation - $24,000)

(Design & Contingencies - $6,000)

(34) Gamble Township, T-625 over Murray Run, Bridge Replacement

Project Allocation

693,000

(Base Project Allocation - $554,000)

(Design & Contingencies - $139,000)

(35) Shrewsbury Township, T-656 over Roaring Run, Bridge Rehabilitation

Project Allocation

10,000

(Base Project Allocation - $8,000)

(Design & Contingencies - $2,000)

(36) McIntyre Township, T-665 over Pleasant Stream, Bridge Replacement

Project Allocation

1,820,000

(Base Project Allocation - $1,456,000)

(Land Allocation - $50,000)

(Design & Contingencies - $314,000)

(37) McIntyre Township, T-665 over Pleasant Stream, Bridge Removal/T-665 Relocation

Project Allocation

650,000

(Base Project Allocation - $500,000)

(Land Allocation - $50,000)

(Design & Contingencies - $100,000)

(38) McIntyre Township, T-665 over Pleasant Stream, Bridge Replacement

Project Allocation

1,300,000

(Base Project Allocation - $1,040,000)

(Design & Contingencies - $260,000)

(39) Penn Township, T-673 over Jakes Run, Bridge Replacement

Project Allocation

290,000

(Base Project Allocation - $232,000)

(Design & Contingencies - $58,000)

(40) Lycoming Township, T-688 over Little Gap Run, Bridge Replacement

Project Allocation

380,000

(Base Project Allocation - $304,000)

(Design & Contingencies - $76,000)

(41) Penn Township, T-698 over Beaver Run, Bridge Rehabilitation

Project Allocation

60,000

(Base Project Allocation - $50,000)

(Design & Contingencies - $10,000)

(42) Jordan Township, T-738 over Little Indian Run, Bridge Replacement

Project Allocation

440,000

(Base Project Allocation - $352,000)

(Design & Contingencies - $88,000)

(43) Jordan Township, T-746 over Muncy Creek, Bridge Rehabilitation

Project Allocation

58,000

(Base Project Allocation - $47,000)

(Design & Contingencies - $11,000)

(44) Pine Township, T-768 over Hughes Run, Bridge Replacement

Project Allocation

290,000

(Base Project Allocation - $232,000)

(Design & Contingencies - $58,000)

(45) Pine Township, T-776 over Shingle Mill Branch, Bridge Replacement

Project Allocation

390,000

(Base Project Allocation - $312,000)

(Design & Contingencies - $78,000)

(46) Gamble Township, T-782 over Joe Gray Run, Bridge Rehabilitation

Project Allocation

22,000

(Base Project Allocation - $18,000)

(Design & Contingencies - $4,000)

(47) Eldred Township, T-846 over West Mill Creek, Bridge Replacement

Project Allocation

260,000

(Base Project Allocation - $208,000)

(Design & Contingencies - $52,000)

(48) Lewis Township, T-857 over Slacks Run, Bridge Replacement

Project Allocation

500,000

(Base Project Allocation - $400,000)

(Land Allocation - $20,000)

(Design & Contingencies - $80,000)

(49) Jersey Shore Borough, Wilson Street over Pfouts Run, Bridge Rehabilitation

Project Allocation

49,000

(Base Project Allocation - $39,000)

(Design & Contingencies - $10,000)

(50) Muncy Township, T-586 over West Branch of Glade Run, Bridge Rehabilitation

Project Allocation

41,000

(Base Project Allocation - $33,000)

(Design & Contingencies - $8,000)

(51) Various Municipalities, Various Local Bridges over Various Spans, Bridge Preservation, Bridge Key 0, Project ID 0

Project Allocation

1,100,000

(Base Project Allocation - $1,000,000)

(Design & Contingencies - $100,000)

(b) State Bridges

(1) (Reserved).

(2) SR 4001 2.5 Miles West of English Center over Little Pine Creek, Pine Township, Bridge Rehabilitation, Bridge Key 25015, Project ID 88743

Project Allocation

3,978,000

(Base Project Allocation - $3,978,000)

(3) SR 4001 4.0 Miles North of Waterville over Love Run, Cummings Township, Bridge Replacement, Bridge Key 25011, Project ID 88744

Project Allocation

612,000

(Base Project Allocation - $378,000)

(Land Allocation - $59,000

(Design & Contingencies - $175,000)

(4) SR 3027, East Jersey Shore over SR 0220, Porter Township, Bridge Rehabilitation, Bridge Key 25003, Project ID 87916

Project Allocation

2,283,000

(Base Project Allocation - $1,781,000)

(Design & Contingencies - $502,000)

(5) SR 3018 1.0 Mile West of Salladasburg over First Fork, Mifflin Township, Bridge Rehabilitation, Bridge Key 24994, Project ID 87918

Project Allocation

19,000

(Land Allocation - $13,000)

(Design & Contingencies - $6,000)

(6) SR 4001, Village of English Center over Little Pine Creek, Pine Township, Bridge Rehabilitation, Bridge Key 25018, Project ID 6209

Project Allocation

722,000

(Base Project Allocation - $722,000)

(7) SR 2067 over Broad Run, Moreland Township, Bridge Rehabilitation, Bridge Key 24944, Project ID 87918

Project Allocation

19,000

(Land Allocation - $13,000)

(Design & Contingencies - $6,000)

(8) SR 2067 over Broad Run, Moreland Township, Bridge Rehabilitation, Bridge Key 24944, Project ID 101970

Project Allocation

141,000

(Base Project Allocation - $113,000)

(Land Allocation - $13,000)

(Design & Contingencies - $15,000)

(9) SR 3018 2.0 Miles West of Salladasburg over First Fork, Mifflin Township, Bridge Rehabilitation, Bridge Key 24993, Project ID 87914

Project Allocation

461,000

(Base Project Allocation - $387,000)

(Land Allocation - $41,000)

(Design & Contingencies - $33,000)

(10) SR 4005 over Wolf Run, Cogan House Township, Bridge Rehabilitation, Bridge Key 25022, Project ID 101970

Project Allocation

280,000

(Base Project Allocation - $225,000)

(Land Allocation - $25,000)

(Design & Contingencies - $30,000)

(11) SR 4005 1.0 Mile West of Cogan House over Wolf Run, Cogan House Township, Bridge Rehabilitation, Bridge Key 25022, Project ID 87918

Project Allocation

19,000

(Land Allocation - $13,000)

(Design & Contingencies - $6,000)

(12) SR 2061 3.0 Miles Northeast of Hughesville over Big Sugar Run, Penn Township, Bridge Replacement, Bridge Key 24939, Project ID 93677

Project Allocation

277,000

(Base Project Allocation - $171,000)

(Land Allocation - $27,000)

(Design & Contingencies - $79,000)

(13) SR 4010 over Larry's Creek, Cogan House Township, Bridge Preservation, Rehabilitation and Restoration, Bridge Key 0, Project ID 99061

Project Allocation

921,000

(Base Project Allocation - $851,000)

(Design & Contingencies - $70,000)

(14) SR 2061 over Little Muncy Creek, Muncy Creek Township, Bridge Preservation, Rehabilitation and Restoration, Bridge Key 0, Project ID 99058

Project Allocation

1,371,000

(Base Project Allocation - $1,200,000)

(Design & Contingencies - $171,000)

(15) SR 3010 over Larrys Creek, Piatt Township, Bridge Preservation, Rehabilitation and Restoration, Bridge Key 0, Project ID 99052

Project Allocation

1,320,000

(Base Project Allocation - $1,200,000)

(Design & Contingencies - $120,000)

(16) SR 0414 over Bluestone Run, McHenry Township, Bridge Preservation, Rehabilitation and Restoration, Bridge Key 0, Project ID 88967

Project Allocation

146,000

(Base Project Allocation - $146,000)

(17) I-180 Westbound Lane over SR 0087, Montoursville Borough, Bridge Rehabilitation, Bridge Key 24648, Project ID 82310

Project Allocation

15,000

(Base Project Allocation - $14,000)

(Design & Contingencies - $1,000)

(18) SR 0015 Northbound and Southbound Northwest of Buttonwood over Schoolhouse Run, Jackson Township, Bridge Rehabilitation, Bridge Key 24556, Project ID 87969

Project Allocation

38,000

(Base Project Allocation - $37,000)

(Design & Contingencies - $1,000)

(19) I-180 Westbound Lane 2.0 Miles East of Montoursville over T-852, Brushy Ridge Road, Fairfield Township, Bridge Rehabilitation, Bridge Key 24644, Project ID 82310

Project Allocation

15,000

(Base Project Allocation - $14,000)

(Design & Contingencies - $1,000)

(20) SR 0180 Eastbound and Westbound over Lycoming Valley Railroad, City of Williamsport, Bridge Rehabilitation, Bridge Key 24617, Project ID 96579

Project Allocation

4,246,000

(Base Project Allocation - $3,763,000)

(Land Allocation - $1,000)

(Design & Contingencies - $482,000)

(21) SR 0118 0.25 Mile East of Hughesville over Muncy Creek, Wolf Township, Bridge Rehabilitation, Bridge Key 24595, Project ID 87861

Project Allocation

183,000

(Base Project Allocation - $179,000)

(Design & Contingencies - $4,000)

(22) SR 0054, Montgomery River Bridge over West Branch of Susquehanna River, Montgomery Borough, Bridge Rehabilitation, Bridge Key 24589, Project ID 87880

Project Allocation

287,000

(Base Project Allocation - $274,000)

(Design & Contingencies - $13,000)

(23) SR 0044 over Lawshe Run, Jersey Shore Borough, Bridge Rehabilitation, Bridge Key 24571, Project ID 87918

Project Allocation

19,000

(Land Allocation - $13,000)

(Design & Contingencies - $6,000)

(24) SR 2069 over Broad Run, Moreland Township, Bridge Replacement, Bridge Key 0, Project ID 101971

Project Allocation

300,000

(Base Project Allocation - $175,000)

(Land Allocation - $65,000)

(Design & Contingencies - $60,000)

(25) SR 0015 Southbound, Village of Buttonwood over Blockhouse Creek, Jackson Township, Bridge Rehabilitation, Bridge Key 24557, Project ID 87969

Project Allocation

153,000

(Base Project Allocation - $152,000)

(Design & Contingencies - $1,000)

(26) SR 0180 Eastbound 0.5 Mile East of Montoursville over SR 2045, Fairfield Township, Bridge Rehabilitation, Bridge Key 24646, Project ID 82310

Project Allocation

15,000

(Base Project Allocation - $14,000)

(Design & Contingencies - $1,000)

(27) SR 0015 Southbound 1.0 Mile South of Buttonwood over SR 0284, Jackson Township, Bridge Rehabilitation, Bridge Key 24555, Project ID 87969

Project Allocation

394,000

(Base Project Allocation - $392,000)

(Design & Contingencies - $2,000)

(28) SR 1017 over Lycoming Creek at Powsy OSD and Hepburn and Lewis Township Line, Lewis Township, Bridge Rehabilitation, Bridge Key 24545, Project ID 87917

Project Allocation

795,000

(Base Project Allocation - $781,000)

(Land Allocation - $14,000)

(29) SR 1017 over Lycoming Creek, Village of Hepburnville, Lycoming Township, Bridge Rehabilitation, Bridge Key 24542, Project ID 88160

Project Allocation

511,000

(Base Project Allocation - $491,000)

(Design & Contingencies - $20,000)

(30) SR 1017 0.5 Mile South of Hepburnville over Lycoming Creek, Loyalsock Township, Bridge Rehabilitation, Bridge Key 24541, Project ID 88160

Project Allocation

511,000

(Base Project Allocation - $491,000)

(Design & Contingencies - $20,000)

(31) SR 1017 3.0 Miles North of Williamsport over Lycoming Creek, Old Lycoming Township, Bridge Rehabilitation, Bridge Key 24540, Project ID 88160

Project Allocation

511,000

(Base Project Allocation - $491,000)

(Design & Contingencies - $20,000)

(32) SR 0014 1.5 Miles North of Ralston over Lycoming Creek, McIntyre Township, Bridge Preservation, Rehabilitation and Restoration, Bridge Key 24507, Project ID 102022

Project Allocation

2,346,000

(Base Project Allocation - $2,000,000)

(Land Allocation - $96,000)

(Design & Contingencies - $250,000)

(33) SR 0015 Southbound 1.0 Mile North of Buttonwood over T-811 and Beck Run, Jackson Township, Bridge Rehabilitation, Bridge Key 24558, Project ID 87969

Project Allocation

318,000

(Base Project Allocation - $317,000)

(Design & Contingencies - $1,000)

(34) SR 0220, LR 1073 Westbound 3.0 Miles West of Newberry over Ramp A-1, Woodward Township, Bridge Rehabilitation, Bridge Key 24697, Project ID 87878

Project Allocation

39,000

(Base Project Allocation - $38,000)

(Design & Contingencies - $1,000)

(35) SR 0405 2.0 Miles Southwest of Muncy over Turkey Run, Clinton Township, Bridge Replacement, Bridge Key 24743, Project ID 87913

Project Allocation

1,221,000

(Base Project Allocation - $1,053,000)

(Land Allocation - $40,000)

(Design & Contingencies - $128,000)

(36) SR 0287 near Intersection SR 0187 over Tributary of Second Fork of Larrys Creek, Cogan House Township, Bridge Replacement, Bridge Key 24736, Project ID 96791

Project Allocation

213,000

(Base Project Allocation - $200,000)

(Land Allocation - $13,000)

(37) SR 0287, LR 353 2.5 Miles South of Brookside over Lawshe Run, Cogan House Township, Bridge Replacement, Bridge Key 24735, Project ID 87919

Project Allocation

1,548,000

(Base Project Allocation - $1,268,000)

(Land Allocation - $77,000)

(Design & Contingencies - $203,000)

(38) SR 0220, LR 1073 Northbound 3.0 Miles West of Newberry over Ramp A-1, Woodward Township, Bridge Rehabilitation, Bridge Key 24694, Project ID 87878

Project Allocation

39,000

(Base Project Allocation - $38,000)

(Design & Contingencies - $1,000)

(39) SR 0287 3.5 Miles South of Brookside over Funston Run, Cummings Township, Bridge Replacement, Bridge Key 24734, Project ID 87915

Project Allocation

1,899,000

(Base Project Allocation - $1,254,000)

(Land Allocation - $54,000)

(Design & Contingencies - $591,000)

(40) SR 2039 0.8 Mile South of Warrensville over Tributary of Mill Creek, Eldred Township, Bridge Replacement, Bridge Key 24922, Project ID 83806

Project Allocation

267,000

(Base Project Allocation - $183,000)

(Land Allocation - $26,000)

(Design & Contingencies - $58,000)

(41) SR 0180 Eastbound 2.0 Miles East of Montoursville over T-852, Brushy Ridge Road, Fairfield Township, Bridge Rehabilitation, Bridge Key 24645, Project ID 82310

Project Allocation

15,000

(Base Project Allocation - $14,000)

(Design & Contingencies - $1,000)

(42) SR 0220 Southbound 2.5 Miles West of Newberry over T-331, Woodward Township, Bridge Rehabilitation, Bridge Key 24698, Project ID 87878

Project Allocation

24,000

(Base Project Allocation - $23,000)

(Design & Contingencies - $1,000)

(43) SR 0180 Eastbound 0.5 Mile East of Montoursville over SR 2045, Bridge Rehabilitation, Bridge Key 24646, Project ID 98987

Project Allocation

226,000

(Base Project Allocation - $181,000)

(Design & Contingencies - $45,000)

(44) SR 0220, LR 1073 Northbound 1.0 Mile West of Williamsport over SEDA-COG Railroad, Woodward Township, Bridge Rehabilitation, Bridge Key 24696, Project ID 87878

Project Allocation

39,000

(Base Project Allocation - $38,000)

(Design & Contingencies - $1,000)

(45) SR 0220 Northbound 2.5 Miles West of Newberry over T-331, Woodward Township, Bridge Rehabilitation, Bridge Key 24695, Project ID 87878

Project Allocation

24,000

(Base Project Allocation - $23,000)

(Design & Contingencies - $1,000)

(46) I-180 Eastbound over SR 2075, Montoursville Borough, Bridge Rehabilitation, Bridge Key 24651, Project ID 82310

Project Allocation

3,000

(Base Project Allocation - $2,000)

(Design & Contingencies - $1,000)

(47) SR 0180 Westbound 0.5 Mile East of Montoursville, Fairfield Township, Bridge Rehabilitation, Bridge Key 24647, Project ID 82310

Project Allocation

226,000

(Base Project Allocation - $181,000)

(Design & Contingencies - $45,000)

(48) SR 0180 Westbound 0.5 Mile East of Montoursville over SR 2045, Fairfield Township, Bridge Rehabilitation, Bridge Key 24647, Project ID 98987

Project Allocation

15,000

(Base Project Allocation - $14,000)

(Design & Contingencies - $1,000)

(49) SR 0014 3.0 Miles Northwest of Trout Run over Grays Run, Lewis Township, Bridge Rehabilitation, Bridge Key 24503, Project ID 88746

Project Allocation

233,000

(Base Project Allocation - $233,000)

(50) SR 0220 1.0 Mile West of Williamsport over SEDA-COG Railroad, Woodward Township, Bridge Rehabilitation, Bridge Key 24699, Project ID 87878

Project Allocation

39,000

(Base Project Allocation - $38,000)

(Design & Contingencies - $1,000)

(51) SR 0554 3.0 Miles South of Williamsport over Hagermans Run, Armstrong Township, Bridge Replacement, Bridge Key 24769, Project ID 87887

Project Allocation

370,000

(Base Project Allocation - $226,000)

(Land Allocation - $61,000)

(Design & Contingencies - $83,000)

(52) SR 0015 8.0 Miles South of Williamsport over Black Hole Creek, Clinton Township, Bridge Replacement, Bridge Key 24511, Project ID 91436

Project Allocation

685,000

(Base Project Allocation - $535,000)

(Design & Contingencies - $150,000)

(53) SR 0414 1.0 Mile North of Slate Run over Pine Creek, Brown Township, Bridge Rehabilitation, Bridge Key 24759, Project ID 6206

Project Allocation

73,000

(Base Project Allocation - $59,000)

(Design & Contingencies - $14,000)

(54) SR 0180 over Millers Run, Loyalsock Township, Bridge Rehabilitation, Bridge Key 2132, Project ID 102553

Project Allocation

300,000

(Base Project Allocation - $250,000)

(Design & Contingencies - $50,000)

(55) SR 2001 over Spring Creek, Washington Township, Bridge Rehabilitation, Bridge Key 24846, Project ID 86431

Project Allocation

75,000

(Base Project Allocation - $60,000)

(Design & Contingencies - $15,000)

(56) SR 2004 2.0 Miles Northeast of Elimsport over Tributary of Spring Creek, Washington Township, Bridge Replacement, Bridge Key 24855, Project ID 93133

Project Allocation

94,000

(Base Project Allocation - $80,000)

(Design & Contingencies - $14,000)

(57) SR 2013 over Laurel Run, Moreland Township, Bridge Replacement, Bridge Key 24862, Project ID 93679

Project Allocation

277,000

(Base Project Allocation - $171,000)

(Land Allocation - $27,000)

(Design & Contingencies - $79,000)

(58) SR 2018 1.5 Miles Northeast of Williamsport over Millers Run, Loyalsock Township, Bridge Rehabilitation, Bridge Key 24890, Project ID 87970

Project Allocation

42,000

(Base Project Allocation - $40,000)

(Design & Contingencies - $2,000)

(59) SR 2022 0.8 Mile Northwest of Warrensville over Calebs Run, Eldred Township, Bridge Replacement, Bridge Key 24899, Project ID 87920

Project Allocation

290,000

(Base Project Allocation - $178,000)

(Land Allocation - $35,000)

(Design & Contingencies - $77,000)

(60) SR 2039 0.5 Mile South of Warrensville over Mill Creek, Eldred Township, Bridge Rehabilitation, Bridge Key 24921, Project ID 87918

Project Allocation

19,000

(Land Allocation - $13,000)

(Design & Contingencies - $6,000)

(61) SR 0414 Village of Bluestone over Bluestone Run, McHenry Township, Bridge Rehabilitation, Bridge Key 24752, Project ID 87918

Project Allocation

17,000

(Land Allocation - $12,000)

(Design & Contingencies - $5,000)

(62) SR 0015 Northbound Village of Buttonwood over Blockhouse Creek, Jackson Township, Bridge Rehabilitation, Bridge Key 40012, Project ID 87969

Project Allocation

181,000

(Base Project Allocation - $180,000)

(Design & Contingencies - $1,000)

(63) SR 0015 Northbound 1.0 Mile South of Buttonwood over SR 0284, Jackson Township, Bridge Rehabilitation, Bridge Key 40017, Project ID 87969

Project Allocation

369,000

(Base Project Allocation - $368,000)

(Design & Contingencies - $1,000)

(64) SR 0220 over Muncy Creek, Picture Rocks Borough, Bridge Preservation, Rehabilitation and Restoration, Bridge Key 41764, Project ID 95770

Project Allocation

4,000

(Base Project Allocation - $1,000)

(Land Allocation - $1,000)

(Design & Contingencies - $2,000)

(65) SR 2004 over Tributary of Spring Creek, Washington Township, Bridge Replacement, Bridge Key 40371, Project ID 88745

Project Allocation

230,000

(Base Project Allocation - $150,000)

(Land Allocation - $20,000)

(Design & Contingencies - $60,000)

(66) SR 0015 Northbound 1.0 Mile North of Buttonwood over T-811 and Beck Run, Jackson Township, Bridge Rehabilitation, Bridge Key 40013, Project ID 87969

Project Allocation

254,000

(Base Project Allocation - $253,000)

(Design & Contingencies - $1,000)

(67) (Reserved).

(68) SR 2067 5.0 Miles East of Clarkstown over Various Municipalities, Bridge Rehabilitation

Project Allocation

560,000

(Base Project Allocation - $450,000)

(Land Allocation - $50,000)

(Design & Contingencies - $60,000)

(69) (Reserved).

(70) Various State-Owned Bridges over Various Spans, Various Municipalities, Bridge Preservation, Bridge Key 0, Project ID 0

Project Allocation

1,100,000

(Base Project Allocation - $1,000,000)

(Design & Contingencies - $100,000)