Section 47. Mercer County.
(a) Local Bridges
Local
State
(1) Worth Township, Creek Road, Bridge 2205 over Wolf Creek, Bridge Replacement
Project Allocation
450,000
(Base Project Allocation - $300,000)
(Land Allocation - $10,000)
(Design & Contingencies - $140,000)
(2) Springfield Township, Old Ash Road, Bridge 3309 over Mill Run, Bridge Replacement
Project Allocation
310,000
(Base Project Allocation - $200,000)
(Land Allocation - $10,000)
(Design & Contingencies - $100,000)
(3) Springfield Township, Tower Road, Bridge 3017 over Black Run, Bridge Replacement
Project Allocation
450,000
(Base Project Allocation - $300,000)
(Land Allocation - $10,000)
(Design & Contingencies - $140,000)
(4) Wolf Creek Township, East Gilmore Road, Bridge 2718 over Branch of Wolf Creek, Bridge Replacement
Project Allocation
360,000
(Base Project Allocation - $230,000)
(Land Allocation - $10,000)
(Design & Contingencies - $120,000)
(5) Sandy Creek Township, Perrine Road, Bridge 414 over Branch of Morrison Run, Bridge Replacement
Project Allocation
310,000
(Base Project Allocation - $200,000)
(Land Allocation - $10,000)
(Design & Contingencies - $100,000)
(6) Otter Creek Township, A. Williamson Road, Bridge 950 over Branch of Little Shenango River, Bridge Replacement
Project Allocation
570,000
(Base Project Allocation - $400,000)
(Land Allocation - $10,000)
(Design & Contingencies - $160,000)
(7) Salem Township, Cherry Hill Road, Bridge 311 over Branch of Little Shenango River, Bridge Rehabilitation
Project Allocation
310,000
(Base Project Allocation - $200,000)
(Land Allocation - $10,000)
(Design & Contingencies - $100,000)
(8) South Pymatuning Township, Huron Road, Bridge 1850 over Chestnut Run, Bridge Rehabilitation
Project Allocation
360,000
(Base Project Allocation - $250,000)
(Land Allocation - $10,000)
(Design & Contingencies - $100,000)
(9) Hempfield Township, Scott Road, Bridge 811 over Branch of Shenango River, Bridge Rehabilitation
Project Allocation
370,000
(Base Project Allocation - $260,000)
(Land Allocation - $10,000)
(Design & Contingencies - $100,000)
(10) Jackson Township, Hosack Road, Bridge 2108 over Tributary of Fox Run, Bridge Rehabilitation
Project Allocation
360,000
(Base Project Allocation - $250,000)
(Land Allocation - $10,000)
(Design & Contingencies - $100,000)
(11) Otter Creek Township, Henry Road, Bridge 910 over Branch of Little Shenango Creek, Bridge Rehabilitation
Project Allocation
570,000
(Base Project Allocation - $400,000)
(Land Allocation - $10,000)
(Design & Contingencies - $160,000)
(12) Delaware Township, Hopper Road, Bridge 1413 over Branch of Shenango River, Bridge Rehabilitation
Project Allocation
250,000
(Base Project Allocation - $160,000)
(Land Allocation - $10,000)
(Design & Contingencies - $80,000)
(13) French Creek Township, Creek Road, Bridge 613 over North Deer Creek, Bridge Rehabilitation
Project Allocation
630,000
(Base Project Allocation - $450,000)
(Land Allocation - $10,000)
(Design & Contingencies - $170,000)
(14) Sandy Lake Borough, Lacock Street, Bridge 1703 over Sandy Creek, Bridge Rehabilitation
Project Allocation
630,000
(Base Project Allocation - $450,000)
(Land Allocation - $10,000)
(Design & Contingencies - $170,000)
(15) Salem Township, North Fritz Road, Bridge 399 over Branch of Sandy Creek, Bridge Rehabilitation
Project Allocation
250,000
(Base Project Allocation - $160,000)
(Land Allocation - $10,000)
(Design & Contingencies - $80,000)
(16) City of Sharon, Walnut Street, Bridge 2319 over Pine Run, Bridge Rehabilitation
Project Allocation
570,000
(Base Project Allocation - $400,000)
(Land Allocation - $10,000)
(Design & Contingencies - $160,000)
(17) Wilmington Township, Bend Road, Bridge 2904 over Branch of Little Neshannock, Bridge Rehabilitation
Project Allocation
710,000
(Base Project Allocation - $500,000)
(Land Allocation - $10,000)
(Design & Contingencies - $200,000)
(18) City of Sharon, Smith Avenue, Bridge 2338 over Branch of Pine Run, Bridge Rehabilitation
Project Allocation
270,000
(Base Project Allocation - $170,000)
(Land Allocation - $10,000)
(Design & Contingencies - $90,000)
(19) Wolf Creek Township, East Gilmore Road, Bridge 2338 over Branch of Pine Run, Bridge Rehabilitation
Project Allocation
710,000
(Base Project Allocation - $500,000)
(Land Allocation - $10,000)
(Design & Contingencies - $200,000)
(20) Wolf Creek Township, East Gilmore Road, Bridge 2707 over Branch of Wolf Creek, Bridge Rehabilitation
Project Allocation
570,000
(Base Project Allocation - $400,000)
(Land Allocation - $10,000)
(Design & Contingencies - $160,000)
(21) Fairview Township, Marstellar Road, Bridge 1507 over Otter Creek, Bridge Rehabilitation
Project Allocation
710,000
(Base Project Allocation - $500,000)
(Land Allocation - $10,000)
(Design & Contingencies - $200,000)
(22) Pymatuning Township, Shenango Park Road, Bridge 1317 over Brush Run, Bridge Rehabilitation
Project Allocation
570,000
(Base Project Allocation - $400,000)
(Land Allocation - $10,000)
(Design & Contingencies - $160,000)
(23) Delaware Township, Pew Road, Bridge 1412 over Tributary of Shenango River, Bridge Replacement
Project Allocation
350,000
(Base Project Allocation - $125,000)
(Land Allocation - $25,000)
(Design & Contingencies - $200,000)
(24) South Pymatuning Township, South Orangeville Road, Bridge 1812 over Pymatuning Creek, Bridge Replacement
Project Allocation
6,682,000
(Base Project Allocation - $5,932,000)
(Land Allocation - $100,000)
(Design & Contingencies - $650,000)
(25) City of Hermitage, Sample Road, Bridge 2326 over Hogback Run, Bridge Replacement
Project Allocation
970,000
(Base Project Allocation - $520,000)
(Land Allocation - $50,000)
(Design & Contingencies - $400,000)
(26) City of Sharon, Spencer Road, Bridge 2337 over Pine Run, Bridge Replacement
Project Allocation
1,215,000
(Base Project Allocation - $715,000)
(Land Allocation - $100,000)
(Design & Contingencies - $400,000)
(27) Shenango Township, Campground Road, Bridge 2810 over Turkey Run, Bridge Replacement
Project Allocation
1,204,000
(Base Project Allocation - $779,000)
(Land Allocation - $25,000)
(Design & Contingencies - $400,000)
(28) Shenango Township, Penn Avenue, Bridge 2814 over Tributary of Shenango River, Bridge Replacement
Project Allocation
385,000
(Base Project Allocation - $160,000)
(Land Allocation - $25,000)
(Design & Contingencies - $200,000)
(29) West Salem Township, Wise Road, Bridge 702 over Big Run, Bridge Replacement
Project Allocation
1,798,000
(Base Project Allocation - $1,373,000)
(Land Allocation - $25,000)
(Design & Contingencies - $400,000)
(30) West Salem Township, Cossitt Road, Bridge 724 over Big Run, Bridge Replacement
Project Allocation
1,666,000
(Base Project Allocation - $1,241,000)
(Land Allocation - $25,000)
(Design & Contingencies - $400,000)
(31) Liberty Township, Amsterdam Road over Black Run, Bridge Replacement
Project Allocation
1,332,000
(Base Project Allocation - $907,000)
(Land Allocation - $25,000)
(Design & Contingencies - $400,000)
(32) Findley Township, Andrusky Road over Mill Creek, Bridge Replacement
Project Allocation
1,341,000
(Base Project Allocation - $916,000)
(Land Allocation - $25,000)
(Design & Contingencies - $400,000)
(33) Wilmington Township, Bend Road over West Branch of Lower Neshannock Creek, Bridge Replacement
Project Allocation
1,482,000
(Base Project Allocation - $1,057,000)
(Land Allocation - $25,000)
(Design & Contingencies - $400,000)
(34) Shenango Township, Campground Road over Turkey Run, Bridge Replacement
Project Allocation
1,204,000
(Base Project Allocation - $779,000)
(Land Allocation - $25,000)
(Design & Contingencies - $400,000)
(35) (Reserved).
(36) Findley Township, Church Road over Mill Run, Bridge Replacement
Project Allocation
2,171,000
(Base Project Allocation - $1,746,000)
(Land Allocation - $25,000)
(Design & Contingencies - $400,000)
(37) West Salem Township, Cossitt Road over Big Run, Bridge Replacement
Project Allocation
1,666,000
(Base Project Allocation - $1,241,000)
(Land Allocation - $25,000)
(Design & Contingencies - $400,000)
(38) (Reserved).
(39) (Reserved).
(40) Mill Creek Township, Crystal Spring Road over Little Sandy Creek, Bridge Replacement
Project Allocation
971,000
(Base Project Allocation - $546,000)
(Land Allocation - $25,000)
(Design & Contingencies - $400,000)
(41) (Reserved).
(42) (Reserved).
(43) (Reserved).
(44) Wolf Creek Township, Elliot Road over Black Run, Bridge Replacement
Project Allocation
1,398,000
(Base Project Allocation - $973,000)
(Land Allocation - $25,000)
(Design & Contingencies - $400,000)
(45) Otter Creek Township, Henry Road over Tributary of Little Shenango River, Bridge Replacement
Project Allocation
1,322,000
(Base Project Allocation - $897,000)
(Land Allocation - $25,000)
(Design & Contingencies - $400,000)
(46) (Reserved).
(47) (Reserved).
(48) Jackson Township, Hosack Road over Yellow Creek, Bridge Replacement
Project Allocation
2,002,000
(Base Project Allocation - $1,577,000)
(Land Allocation - $25,000)
(Design & Contingencies - $400,000)
(49) Lake Township, Hutchenson Road over Tributary of Little Shenango River, Bridge Replacement
Project Allocation
845,000
(Base Project Allocation - $520,000)
(Land Allocation - $25,000)
(Design & Contingencies - $300,000)
(50) (Reserved).
(51) Grove City Borough, Lincoln Avenue over Wolf Creek, Bridge Replacement
Project Allocation
3,089,000
(Base Project Allocation - $2,489,000)
(Land Allocation - $100,000)
(Design & Contingencies - $500,000)
(52) Fairview Township, Marstellar Road over Otter Creek, Bridge Replacement
Project Allocation
1,588,000
(Base Project Allocation - $1,163,000)
(Land Allocation - $25,000)
(Design & Contingencies - $400,000)
(53) (Reserved).
(54) Coolspring Township, Orr Road over Bessemer and Lake Erie Railroad, Bridge Replacement
Project Allocation
2,739,000
(Base Project Allocation - $2,064,000)
(Land Allocation - $75,000)
(Design & Contingencies - $600,000)
(55) (Reserved).
(56) (Reserved).
(57) Sandy Creek Township, Perrine Road over Tributary of Morrison Run, Bridge Replacement
Project Allocation
641,000
(Base Project Allocation - $416,000)
(Land Allocation - $25,000)
(Design & Contingencies - $200,000)
(58) Delaware Township, Pew Road over Tributary of Shenango River, Bridge Replacement
Project Allocation
380,000
(Base Project Allocation - $250,000)
(Land Allocation - $10,000)
(Design & Contingencies - $120,000)
(59) (Reserved).
(60) (Reserved).
(61) Hempfield Township, Scott Road over Tributary of Shenango River, Bridge Replacement
Project Allocation
971,000
(Base Project Allocation - $546,000)
(Land Allocation - $25,000)
(Design & Contingencies - $400,000)
(62) (Reserved).
(63) City of Sharon, Smith Avenue over Tributary of Pine Run, Bridge Replacement
Project Allocation
1,202,000
(Base Project Allocation - $702,000)
(Land Allocation - $100,000)
(Design & Contingencies - $400,000)
(64) (Reserved).
(65) Coolspring Township, Tait Road over Otter Creek, Bridge Replacement
Project Allocation
2,276,000
(Base Project Allocation - $1,851,000)
(Land Allocation - $25,000)
(Design & Contingencies - $400,000)
(66) Pine Township, Tie Line Road over Swamp Run, Bridge Replacement
Project Allocation
1,237,000
(Base Project Allocation - $812,000)
(Land Allocation - $25,000)
(Design & Contingencies - $400,000)
(67) (Reserved).
(68) (Reserved).
(69) (Reserved).
(70) Perry Township, Yeager Road over Pine Run, Bridge Replacement
Project Allocation
1,000,000
(Base Project Allocation - $575,000)
(Land Allocation - $25,000)
(Design & Contingencies - $400,000)
(71) Various Municipalities, Various Local Bridges over Various Spans, Bridge Preservation, Bridge Key 0, Project ID 0
Project Allocation
1,100,000
(Base Project Allocation - $1,000,000)
(Design & Contingencies - $100,000)
(b) State Bridges
(1) (Reserved).
(2) SR 1018 over Lake Wilhelm, Deer Creek Township, Bridge Rehabilitation, Bridge Key 25935, Project ID 97299
Project Allocation
851,000
(Base Project Allocation - $756,000)
(Land Allocation - $19,000)
(Design & Contingencies - $76,000)
(3) SR 4020 Sheakleyville over Little Shenango River, Sugar Grove Township, Bridge Rehabilitation, Bridge Key 26057, Project ID 97295
Project Allocation
111,000
(Base Project Allocation - $92,000)
(Design & Contingencies - $19,000)
(4) SR 1014 Georgetown over Mill Creek, New Lebanon Borough, Bridge Rehabilitation, Bridge Key 25931, Project ID 97291
Project Allocation
111,000
(Base Project Allocation - $92,000)
(Design & Contingencies - $19,000)
(5) SR 3039, Flat Road over Tributary of Little Neshannock Creek, East Lackawannock Township, Bridge Rehabilitation, Bridge Key 26023, Project ID 97332
Project Allocation
362,000
(Base Project Allocation - $258,000)
(Land Allocation - $18,000)
(Design & Contingencies - $86,000)
(6) SR 3007, Pulaski-Mercer Bridge over Risa Run, Shenango Township, Bridge Replacement, Bridge Key 25982, Project ID 97300
Project Allocation
761,000
(Base Project Allocation - $496,000)
(Land Allocation - $17,000)
(Design & Contingencies - $248,000)
(7) SR 3007 Pulaski-Mercer Bridge over West Branch of Neshannock Creek, Wilmington Township, Bridge Rehabilitation, Bridge Key 25983, Project ID 97292
Project Allocation
111,000
(Base Project Allocation - $92,000)
(Design & Contingencies - $19,000)
(8) SR 3008, East State Street over Tributary of Pine Run, City of Hermitage, Bridge Rehabilitation, Bridge Key 25988, Project ID 97301
Project Allocation
951,000
(Base Project Allocation - $691,000)
(Land Allocation - $87,000)
(Design & Contingencies - $173,000)
(9) SR 3022, Rutledge Road over Chestnut Run, Pymatuning Township, Bridge Replacement, Bridge Key 26010, Project ID 90148
Project Allocation
400,000
(Base Project Allocation - $250,000)
(Land Allocation - $50,000)
(Design & Contingencies - $100,000)
(10) SR 1014 Georgetown over Tributary of Sandy Creek, Deer Creek Township, Bridge Rehabilitation, Bridge Key 25926, Project ID 97290
Project Allocation
111,000
(Base Project Allocation - $92,000)
(Design & Contingencies - $19,000)
(11) SR 3032, Connelly Boulevard over Pine Run, City of Sharon, Bridge Rehabilitation, Bridge Key 26021, Project ID 97293
Project Allocation
111,000
(Base Project Allocation - $92,000)
(Design & Contingencies - $19,000)
(12) SR 3039, Flat Road over Tributary of Little Neshannock Creek, East Lackawannock Township, Bridge Rehabilitation, Bridge Key 26024, Project ID 97320
Project Allocation
111,000
(Base Project Allocation - $92,000)
(Design & Contingencies - $19,000)
(13) SR 1001, Summit Road over Tributary of Sugar Run, Greene Township, Bridge Replacement, Bridge Key 26030, Project ID 97268
Project Allocation
262,000
(Base Project Allocation - $163,000)
(Land Allocation - $17,000)
(Design & Contingencies - $82,000)
(14) SR 4002 Carlisle over Booth Run, South Pymatuning Township, Bridge Rehabilitation, Bridge Key 26031, Project ID 97276
Project Allocation
1,442,000
(Base Project Allocation - $1,325,000)
(Land Allocation - $20,000)
(Design & Contingencies - $97,000)
(15) SR 4017, Werner Road over Little Shenango River, Sugar Grove Township, Bridge Rehabilitation, Bridge Key 26049, Project ID 97324
Project Allocation
2,052,000
(Base Project Allocation - $1,605,000)
(Land Allocation - $90,000)
(Design & Contingencies - $357,000)
(16) SR 4020 Sheakleyville over Morrison Run, Sandy Creek Township, Bridge Rehabilitation, Bridge Key 26059, Project ID 97296
Project Allocation
111,000
(Base Project Allocation - $92,000)
(Design & Contingencies - $19,000)
(17) SR 4022, Leech Road over Sankeys Run, Sugar Grove Township, Bridge Rehabilitation, Bridge Key 26068, Project ID 98172
Project Allocation
111,000
(Base Project Allocation - $92,000)
(Design & Contingencies - $19,000)
(18) SR 0080 Westbound Ramp C over Hogback Run, Shenango Township, Bridge Rehabilitation, Bridge Key 26346, Project ID 97316
Project Allocation
1,452,000
(Base Project Allocation - $1,179,000)
(Land Allocation - $91,000)
(Design & Contingencies - $182,000)
(19) SR 1013, Lake Road over Tributary of Sandy Creek, Sandy Creek Township, Bridge Rehabilitation, Bridge Key 25923, Project ID 97289
Project Allocation
111,000
(Base Project Allocation - $92,000)
(Design & Contingencies - $19,000)
(20) SR 0080 Eastbound over Black Run, Wolf Creek Township, Bridge Rehabilitation, Bridge Key 25807, Project ID 97280
Project Allocation
111,000
(Base Project Allocation - 92,000)
(Design & Contingencies - $19,000)
(21) I-376 Parkway East over Old William Penn Highway, Monroeville Borough, Bridge Rehabilitation, Bridge Key 1208, Project ID 87779
Project Allocation
162,000
(Base Project Allocation - $136,000)
(Design & Contingencies - $26,000)
(22) SR 4003 Good Hope over Tributary of Big Run, West Salem Township, Bridge Rehabilitation, Bridge Key 26035, Project ID 97294
Project Allocation
111,000
(Base Project Allocation - $92,000)
(Design & Contingencies - $19,000)
(23) SR 0058, Kinsman Road over Faherty Run, Greene Township, Bridge Rehabilitation, Bridge Key 25667, Project ID 97307
Project Allocation
362,000
(Base Project Allocation - $258,000)
(Land Allocation - $18,000)
(Design & Contingencies - $86,000)
(24) SR 0080 Westbound over Black Run, Wolf Creek Township, Bridge Rehabilitation, Bridge Key 25809, Project ID 97281
Project Allocation
111,000
(Base Project Allocation - $92,000)
(Design & Contingencies - $19,000)
(25) SR 2103 Mill Brook over SR 0079 Northbound and Southbound, Jackson Township, Bridge Rehabilitation, Bridge Key 25746, Project ID 88480
Project Allocation
1,312,000
(Base Project Allocation - $1,108,000)
(Land Allocation - $19,000)
(Design & Contingencies - $185,000)
(26) SR 2102, Clintville Road over SR 0079 Southbound, Findley Township, Bridge Rehabilitation, Bridge Key 25742, Project ID 88482
Project Allocation
911,000
(Base Project Allocation - $714,000)
(Land Allocation - $18,000)
(Design & Contingencies - $179,000)
(27) SR 2102, Clintville Road over SR 0079 Northbound, Findley Township, Bridge Rehabilitation, Bridge Key 25741, Project ID 88483
Project Allocation
911,000
(Base Project Allocation - $714,000)
(Land Allocation - $18,000)
(Design & Contingencies - $179,000)
(28) SR 0062, Franklin Road over Fox Run, Jackson Township, Bridge Rehabilitation, Bridge Key 25719, Project ID 88488
Project Allocation
90,000
(Base Project Allocation - $60,000)
(Land Allocation - $10,000)
(Design & Contingencies - $20,000)
(29) SR 0062, Franklin Road over Yellow Creek, Jackson Township, Bridge Rehabilitation, Bridge Key 25717, Project ID 97323
Project Allocation
362,000
(Base Project Allocation - $258,000)
(Land Allocation - $18,000)
(Design & Contingencies - $86,000)
(30) SR 0062, Franklin Road over Spring Creek, Coolspring Township, Bridge Rehabilitation, Bridge Key 25715, Project ID 88486
Project Allocation
362,000
(Base Project Allocation - $258,000)
(Land Allocation - $18,000)
(Design & Contingencies - $86,000)
(31) SR 0062, North Sharon Mercer Road over Lackawannock Creek, East Lackawannock Township, Bridge Rehabilitation, Bridge Key 25711, Project ID 97306
Project Allocation
362,000
(Base Project Allocation - $258,000)
(Land Allocation - $18,000)
(Design & Contingencies - $86,000)
(32) SR 0062, Sharon Mercer Road over Tributary of Magargee Run, Jefferson Township, Bridge Replacement, Bridge Key 25709, Project ID 90024
Project Allocation
450,000
(Base Project Allocation - $300,000)
(Land Allocation - $50,000)
(Design & Contingencies - $100,000)
(33) SR 0062, East State Street over Tributary of Shenango River, City of Hermitage, Bridge Rehabilitation, Bridge Key 25708, Project 97327
Project Allocation
362,000
(Base Project Allocation - $258,000)
(Land Allocation - $18,000)
(Design & Contingencies - $86,000)
(34) SR 0058, South Diamond Street over Munnel Run, Coolspring Township, Bridge Rehabilitation, Bridge Key 25675, Project ID 97317
Project Allocation
441,000
(Base Project Allocation - $335,000)
(Land Allocation - $18,000)
(Design & Contingencies - $88,000)
(35) SR 0080 Eastbound over SR 0718, Sieg Hill Road, Shenango Township, Bridge Rehabilitation, Bridge Key 25766, Project ID 97309
Project Allocation
1,511,000
(Base Project Allocation - $1,305,000)
(Land Allocation - $19,000)
(Design & Contingencies - $187,000)
(36) SR 0058, College Avenue over Mathay Run, Hempfield Township, Bridge Rehabilitation, Bridge Key 25671, Project ID 97305
Project Allocation
362,000
(Base Project Allocation - $258,000)
(Land Allocation - $18,000)
(Design & Contingencies - $86,000)
(37) SR 0080 Westbound over SR 0718, Sieg Hill Road, Shenango Township, Bridge Rehabilitation, Bridge Key 25767, Project ID 97310
Project Allocation
1,511,000
(Base Project Allocation - $1,305,000)
(Land Allocation - $19,000)
(Design & Contingencies - $187,000)
(38) SR 0019, Perry Highway over Tributary of Little Shenango River, Perry Township, Bridge Rehabilitation, Bridge Key 25655, Project ID 84916
Project Allocation
72,000
(Base Project Allocation - $72,000)
(39) SR 0019, Perry Highway over Tributary of Otter Creek, Fairview Township, Bridge Rehabilitation, Bridge Key 25654, Project ID 97277
Project Allocation
431,000
(Base Project Allocation - $374,000)
(Land Allocation - $19,000)
(Design & Contingencies - $38,000)
(40) SR 0019, Perry Highway over Tributary of Otter Creek, Coolspring Township, Bridge Replacement, Bridge Key 25650, Project ID 90031
Project Allocation
1,821,000
(Base Project Allocation - $1,305,000)
(Land Allocation - $86,000)
(Design & Contingencies - $430,000)
(41) SR 0019, Perry Highway over Tributary of Otter Creek, Coolspring Township, Bridge Rehabilitation, Bridge Key 25649, Project ID 97331
Project Allocation
362,000
(Base Project Allocation - $258,000)
(Land Allocation - $18,000)
(Design & Contingencies - $86,000)
(42) SR 0019, Franklin Street over Munnel Run, Coolspring Township, Bridge Replacement, Bridge Key 25648, Project ID 97322
Project Allocation
591,000
(Base Project Allocation - $382,000)
(Land Allocation - $87,000)
(Design & Contingencies - $122,000)
(43) SR 0019, Perry Highway over Tributary of Neshannock Creek, Mercer Borough, Bridge Rehabilitation, Bridge Key 25647, Project ID 97304
Project Allocation
211,000
(Base Project Allocation - $191,000)
(Design & Contingencies - $20,000)
(44) SR 0019, Perry Highway over Tributary of Neshannock Creek, East Lackawannock Township, Bridge Replacement, Bridge Key 25646, Project ID 90032
Project Allocation
450,000
(Base Project Allocation - $300,000)
(Land Allocation - $50,000)
(Design & Contingencies - $100,000)
(45) SR 0019, Perry Highway over Beaver Run, East Lackawannock Township, Bridge Rehabilitation, Bridge Key 25645, Project ID 97303
Project Allocation
211,000
(Base Project Allocation - $191,000)
(Design & Contingencies - $20,000)
(46) SR 0019, Perry Highway over Small Stream, Springfield Township, Bridge Rehabilitation, Bridge Key 25643, Project ID 84915
Project Allocation
211,000
(Base Project Allocation - $191,000)
(Design & Contingencies - $20,000)
(47) SR 0018, Sharon Road over Big Run, West Salem Township, Bridge Rehabilitation, Bridge Key 25636, Project ID 88485
Project Allocation
120,000
(Base Project Allocation - $80,000)
(Land Allocation - $10,000)
(Design & Contingencies - $30,000)
(48) SR 0018 over Conrail Railroad Siding, Pymatuning Township, Bridge Restoration, Bridge Key 25635, Project ID 73500
Project Allocation
480,000
(Base Project Allocation - $180,000)
(Land Allocation - $100,000)
(Design & Contingencies - $200,000)
(49) SR 0018 South of Hermitage over Tributary of Shenango River, City of Hermitage, Bridge Rehabilitation, Bridge Key 25632, Project ID 97272
Project Allocation
511,000
(Base Project Allocation - $491,000)
(Design & Contingencies - $20,000)
(50) SR 0058, Mercer Road over Krem Run, Delaware Township, Bridge Rehabilitation, Bridge Key 25673, Project ID 97315
Project Allocation
362,000
(Base Project Allocation - $258,000)
(Land Allocation - $18,000)
(Design & Contingencies - $86,000)
(51) SR 0208 over Black Run, Springfield Township, Bridge Replacement, Bridge Key 25840, Project ID 90033
Project Allocation
1,661,000
(Base Project Allocation - $1,152,000)
(Land Allocation - $85,000)
(Design & Contingencies - $424,000)
(52) SR 1004, Fredonia Road over Tributary of Little Shenango River, Lake Township, Bridge Replacement, Bridge Key 25911, Project ID 89120
Project Allocation
761,000
(Base Project Allocation - $496,000)
(Land Allocation - $17,000)
(Design & Contingencies - $248,000)
(53) SR 1004, Stoneboro over SR 0079 Northbound and Southbound, Lake Township, Bridge Rehabilitation, Bridge Key 25910, Project ID 88481
Project Allocation
1,691,000
(Base Project Allocation - $1,484,000)
(Land Allocation - $19,000)
(Design & Contingencies - $188,000)
(54) SR 1002, Fairview Road over Otter Creek, Fairview Township, Bridge Rehabilitation, Bridge Key 25908, Project ID 88484
Project Allocation
340,000
(Base Project Allocation - $238,000)
(Land Allocation - $17,000)
(Design & Contingencies - $85,000)
(55) SR 0965, Kilgore Road over Sandy Creek, Worth Township, Bridge Rehabilitation, Bridge Key 25903, Project ID 88487
Project Allocation
90,000
(Base Project Allocation - $60,000)
(Land Allocation - $10,000)
(Design & Contingencies - $20,000)
(56) SR 0965, North Jackson Center Road over Tributary of Wolf Creek, Worth Township, Bridge Rehabilitation, Bridge Key 25902, Project ID 97275
Project Allocation
222,000
(Base Project Allocation - $184,000)
(Land Allocation - $19,000)
(Design & Contingencies - $19,000)
(57) SR 0965, North Jackson Center Road over Yellow Creek, Jackson Township, Bridge Rehabilitation, Bridge Key 25901, Project ID 97319
Project Allocation
111,000
(Base Project Allocation - $92,000)
(Design & Contingencies - $19,000)
(58) SR 0846, Orangeville Road over Big Run, West Salem Township, Bridge Rehabilitation, Bridge Key 25899, Project ID 89123
Project Allocation
131,000
(Base Project Allocation - $112,000)
(Design & Contingencies - $19,000)
(59) SR 0846, Saranac Road over Shenango Reservoir, South Pymatuning Township, Bridge Rehabilitation, Bridge Key 25897, Project ID 97329
Project Allocation
3,342,000
(Base Project Allocation - $3,035,000)
(Land Allocation - $20,000)
(Design & Contingencies - $287,000)
(60) SR 0845, Linden Street over Sawmill Run, Stoneboro Borough, Bridge Rehabilitation, Bridge Key 25895, Project ID 97298
Project Allocation
111,000
(Base Project Allocation - $92,000)
(Design & Contingencies - $19,000)
(61) SR 0718, Sieg Hill Road over Shenango River, Shenango Township, Bridge Rehabilitation, Bridge Key 25887, Project ID 88479
Project Allocation
220,000
(Base Project Allocation - $180,000)
(Land Allocation - $10,000)
(Design & Contingencies - $30,000)
(62) SR 0358, Hadley Road over Sankeys Run, Hempfield Township, Bridge Rehabilitation, Bridge Key 25868, Project ID 97302
Project Allocation
422,000
(Base Project Allocation - $382,000)
(Land Allocation - $20,000)
(Design & Contingencies - $20,000)
(63) SR 0318 West Middlesex-Mercer over West Branch of Neshannock Creek, Lackawannock Township, Bridge Replacement, Bridge Key 25859, Project ID 92978
Project Allocation
800,000
(Base Project Allocation - $800,000)
(64) SR 0258, Lake Road over Tributary of Shenango River, Clark Borough, Bridge Rehabilitation, Bridge Key 25853, Project ID 97287
Project Allocation
111,000
(Base Project Allocation - $92,000)
(Design & Contingencies - $19,000)
(65) SR 1012 Glenn School over Little Sandy Creek, Mill Creek Township, Bridge Rehabilitation, Bridge Key 25921, Project ID 97288
Project Allocation
111,000
(Base Project Allocation - $92,000)
(Design & Contingencies - $19,000)
(66) SR 0173 Cochranton over Mill Creek, New Lebanon Borough, Bridge Replacement, Bridge Key 25833, Project ID 97328
Project Allocation
391,000
(Base Project Allocation - $244,000)
(Land Allocation - $17,000)
(Design & Contingencies - $130,000)
(67) SR 0173 Grove City over Tributary of Black Run, Pine Township, Bridge Rehabilitation, Bridge Key 25826, Project ID 97308
Project Allocation
211,000
(Base Project Allocation - $191,000)
(Design & Contingencies - $20,000)
(68) SR 0173, Liberty Street over Swamp Run, Pine Township, Bridge Replacement, Bridge Key 25824, Project ID 89104
Project Allocation
139,000
(Land Allocation - $52,000)
(Design & Contingencies - $87,000)
(69) SR 0080 Westbound over Wolf Creek, Wolf Creek Township, Bridge Rehabilitation, Bridge Key 25812, Project ID 97286
Project Allocation
111,000
(Base Project Allocation - $92,000)
(Design & Contingencies - $19,000)
(70) SR 0080 Eastbound over Wolf Creek, Wolf Creek Township, Bridge Rehabilitation, Bridge Key 25811, Project ID 97285
Project Allocation
111,000
(Base Project Allocation - $92,000)
(Design & Contingencies - $19,000)
(71) SR 0080 Westbound over SR 0173, Grove City, Wolf Creek Township, Bridge Rehabilitation, Bridge Key 25810, Project ID 97284
Project Allocation
111,000
(Base Project Allocation - $92,000)
(Design & Contingencies - $19,000)
(72) SR 0080 Eastbound over SR 0173, Grove City, Wolf Creek Township, Bridge Rehabilitation, Bridge Key 25808, Project ID 97282
Project Allocation
111,000
(Base Project Allocation - $92,000)
(Design & Contingencies - $19,000)
(73) SR 0080 Westbound over Neshannock Creek, Shenango Township, Bridge Rehabilitation, Bridge Key 25779, Project ID 97314
Project Allocation
1,511,000
(Base Project Allocation - $1,305,000)
(Land Allocation - $19,000)
(Design & Contingencies - $187,000)
(74) SR 0080 Eastbound over Neshannock Creek, Shenango Township, Bridge Rehabilitation, Bridge Key 25778, Project ID 97313
Project Allocation
1,511,000
(Base Project Allocation - $1,305,000)
(Land Allocation - $19,000)
(Design & Contingencies - $187,000)
(75) SR 0080 Westbound over SR 0318, West Middlesex-Mercer Road, Shenango Township, Bridge Rehabilitation, Bridge Key 25777, Project ID 97334
Project Allocation
1,711,000
(Base Project Allocation - $1,504,000)
(Land Allocation - $19,000)
(Design & Contingencies - $188,000)
(76) SR 0080 Eastbound over SR 0318, West Middlesex-Mercer Road, Shenango Township, Bridge Rehabilitation, Bridge Key 25776, Project ID 97333
Project Allocation
1,711,000
(Base Project Allocation - $1,504,000)
(Land Allocation - $19,000)
(Design & Contingencies - $188,000)
(77) SR 0318, Hubbard-West Middlesex Road over Tributary of Shenango River, Shenango Township, Bridge Replacement, Bridge Key 25855, Project ID 89116
Project Allocation
499,000
(Base Project Allocation - $446,000)
(Land Allocation - $17,000)
(Design & Contingencies - $36,000)
(78) SR 0258, Lake Road over Lackawannock Creek, Jefferson Township, Bridge Rehabilitation, Bridge Key 39964, Project ID 97318
Project Allocation
111,000
(Base Project Allocation - $92,000)
(Design & Contingencies - $19,000)
(79) SR 0080 Westbound over T-998, Centertown Road, Wolf Creek Township, Bridge Rehabilitation, Bridge Key 40966, Project ID 97297
Project Allocation
111,000
(Base Project Allocation - $92,000)
(Design & Contingencies - $19,000)
(80) SR 0208 over Wolf Creek, Grove City Borough, Bridge Rehabilitation, Bridge Key 42413, Project ID 97330
Project Allocation
171,000
(Base Project Allocation - $152,000)
(Design & Contingencies - $19,000)
(81) Various State-Owned Bridges over Various Spans, Various Municipalities, Bridge Preservation, Bridge Key 0, Project ID 0
Project Allocation
1,100,000
(Base Project Allocation - $1,000,000)
(Design & Contingencies - $100,000)