Act 127 of 2014, § 47, under HIGHWAY-RAILROAD AND HIGHWAY BRIDGE CAPITAL BUDGET SUPPLEMENTAL ACT FOR 2014-2015 - ENACTMENT.

Act 127 of 2014, § 47

Section 47. Mercer County.

(a) Local Bridges

Local

State

(1) Worth Township, Creek Road, Bridge 2205 over Wolf Creek, Bridge Replacement

Project Allocation

450,000

(Base Project Allocation - $300,000)

(Land Allocation - $10,000)

(Design & Contingencies - $140,000)

(2) Springfield Township, Old Ash Road, Bridge 3309 over Mill Run, Bridge Replacement

Project Allocation

310,000

(Base Project Allocation - $200,000)

(Land Allocation - $10,000)

(Design & Contingencies - $100,000)

(3) Springfield Township, Tower Road, Bridge 3017 over Black Run, Bridge Replacement

Project Allocation

450,000

(Base Project Allocation - $300,000)

(Land Allocation - $10,000)

(Design & Contingencies - $140,000)

(4) Wolf Creek Township, East Gilmore Road, Bridge 2718 over Branch of Wolf Creek, Bridge Replacement

Project Allocation

360,000

(Base Project Allocation - $230,000)

(Land Allocation - $10,000)

(Design & Contingencies - $120,000)

(5) Sandy Creek Township, Perrine Road, Bridge 414 over Branch of Morrison Run, Bridge Replacement

Project Allocation

310,000

(Base Project Allocation - $200,000)

(Land Allocation - $10,000)

(Design & Contingencies - $100,000)

(6) Otter Creek Township, A. Williamson Road, Bridge 950 over Branch of Little Shenango River, Bridge Replacement

Project Allocation

570,000

(Base Project Allocation - $400,000)

(Land Allocation - $10,000)

(Design & Contingencies - $160,000)

(7) Salem Township, Cherry Hill Road, Bridge 311 over Branch of Little Shenango River, Bridge Rehabilitation

Project Allocation

310,000

(Base Project Allocation - $200,000)

(Land Allocation - $10,000)

(Design & Contingencies - $100,000)

(8) South Pymatuning Township, Huron Road, Bridge 1850 over Chestnut Run, Bridge Rehabilitation

Project Allocation

360,000

(Base Project Allocation - $250,000)

(Land Allocation - $10,000)

(Design & Contingencies - $100,000)

(9) Hempfield Township, Scott Road, Bridge 811 over Branch of Shenango River, Bridge Rehabilitation

Project Allocation

370,000

(Base Project Allocation - $260,000)

(Land Allocation - $10,000)

(Design & Contingencies - $100,000)

(10) Jackson Township, Hosack Road, Bridge 2108 over Tributary of Fox Run, Bridge Rehabilitation

Project Allocation

360,000

(Base Project Allocation - $250,000)

(Land Allocation - $10,000)

(Design & Contingencies - $100,000)

(11) Otter Creek Township, Henry Road, Bridge 910 over Branch of Little Shenango Creek, Bridge Rehabilitation

Project Allocation

570,000

(Base Project Allocation - $400,000)

(Land Allocation - $10,000)

(Design & Contingencies - $160,000)

(12) Delaware Township, Hopper Road, Bridge 1413 over Branch of Shenango River, Bridge Rehabilitation

Project Allocation

250,000

(Base Project Allocation - $160,000)

(Land Allocation - $10,000)

(Design & Contingencies - $80,000)

(13) French Creek Township, Creek Road, Bridge 613 over North Deer Creek, Bridge Rehabilitation

Project Allocation

630,000

(Base Project Allocation - $450,000)

(Land Allocation - $10,000)

(Design & Contingencies - $170,000)

(14) Sandy Lake Borough, Lacock Street, Bridge 1703 over Sandy Creek, Bridge Rehabilitation

Project Allocation

630,000

(Base Project Allocation - $450,000)

(Land Allocation - $10,000)

(Design & Contingencies - $170,000)

(15) Salem Township, North Fritz Road, Bridge 399 over Branch of Sandy Creek, Bridge Rehabilitation

Project Allocation

250,000

(Base Project Allocation - $160,000)

(Land Allocation - $10,000)

(Design & Contingencies - $80,000)

(16) City of Sharon, Walnut Street, Bridge 2319 over Pine Run, Bridge Rehabilitation

Project Allocation

570,000

(Base Project Allocation - $400,000)

(Land Allocation - $10,000)

(Design & Contingencies - $160,000)

(17) Wilmington Township, Bend Road, Bridge 2904 over Branch of Little Neshannock, Bridge Rehabilitation

Project Allocation

710,000

(Base Project Allocation - $500,000)

(Land Allocation - $10,000)

(Design & Contingencies - $200,000)

(18) City of Sharon, Smith Avenue, Bridge 2338 over Branch of Pine Run, Bridge Rehabilitation

Project Allocation

270,000

(Base Project Allocation - $170,000)

(Land Allocation - $10,000)

(Design & Contingencies - $90,000)

(19) Wolf Creek Township, East Gilmore Road, Bridge 2338 over Branch of Pine Run, Bridge Rehabilitation

Project Allocation

710,000

(Base Project Allocation - $500,000)

(Land Allocation - $10,000)

(Design & Contingencies - $200,000)

(20) Wolf Creek Township, East Gilmore Road, Bridge 2707 over Branch of Wolf Creek, Bridge Rehabilitation

Project Allocation

570,000

(Base Project Allocation - $400,000)

(Land Allocation - $10,000)

(Design & Contingencies - $160,000)

(21) Fairview Township, Marstellar Road, Bridge 1507 over Otter Creek, Bridge Rehabilitation

Project Allocation

710,000

(Base Project Allocation - $500,000)

(Land Allocation - $10,000)

(Design & Contingencies - $200,000)

(22) Pymatuning Township, Shenango Park Road, Bridge 1317 over Brush Run, Bridge Rehabilitation

Project Allocation

570,000

(Base Project Allocation - $400,000)

(Land Allocation - $10,000)

(Design & Contingencies - $160,000)

(23) Delaware Township, Pew Road, Bridge 1412 over Tributary of Shenango River, Bridge Replacement

Project Allocation

350,000

(Base Project Allocation - $125,000)

(Land Allocation - $25,000)

(Design & Contingencies - $200,000)

(24) South Pymatuning Township, South Orangeville Road, Bridge 1812 over Pymatuning Creek, Bridge Replacement

Project Allocation

6,682,000

(Base Project Allocation - $5,932,000)

(Land Allocation - $100,000)

(Design & Contingencies - $650,000)

(25) City of Hermitage, Sample Road, Bridge 2326 over Hogback Run, Bridge Replacement

Project Allocation

970,000

(Base Project Allocation - $520,000)

(Land Allocation - $50,000)

(Design & Contingencies - $400,000)

(26) City of Sharon, Spencer Road, Bridge 2337 over Pine Run, Bridge Replacement

Project Allocation

1,215,000

(Base Project Allocation - $715,000)

(Land Allocation - $100,000)

(Design & Contingencies - $400,000)

(27) Shenango Township, Campground Road, Bridge 2810 over Turkey Run, Bridge Replacement

Project Allocation

1,204,000

(Base Project Allocation - $779,000)

(Land Allocation - $25,000)

(Design & Contingencies - $400,000)

(28) Shenango Township, Penn Avenue, Bridge 2814 over Tributary of Shenango River, Bridge Replacement

Project Allocation

385,000

(Base Project Allocation - $160,000)

(Land Allocation - $25,000)

(Design & Contingencies - $200,000)

(29) West Salem Township, Wise Road, Bridge 702 over Big Run, Bridge Replacement

Project Allocation

1,798,000

(Base Project Allocation - $1,373,000)

(Land Allocation - $25,000)

(Design & Contingencies - $400,000)

(30) West Salem Township, Cossitt Road, Bridge 724 over Big Run, Bridge Replacement

Project Allocation

1,666,000

(Base Project Allocation - $1,241,000)

(Land Allocation - $25,000)

(Design & Contingencies - $400,000)

(31) Liberty Township, Amsterdam Road over Black Run, Bridge Replacement

Project Allocation

1,332,000

(Base Project Allocation - $907,000)

(Land Allocation - $25,000)

(Design & Contingencies - $400,000)

(32) Findley Township, Andrusky Road over Mill Creek, Bridge Replacement

Project Allocation

1,341,000

(Base Project Allocation - $916,000)

(Land Allocation - $25,000)

(Design & Contingencies - $400,000)

(33) Wilmington Township, Bend Road over West Branch of Lower Neshannock Creek, Bridge Replacement

Project Allocation

1,482,000

(Base Project Allocation - $1,057,000)

(Land Allocation - $25,000)

(Design & Contingencies - $400,000)

(34) Shenango Township, Campground Road over Turkey Run, Bridge Replacement

Project Allocation

1,204,000

(Base Project Allocation - $779,000)

(Land Allocation - $25,000)

(Design & Contingencies - $400,000)

(35) (Reserved).

(36) Findley Township, Church Road over Mill Run, Bridge Replacement

Project Allocation

2,171,000

(Base Project Allocation - $1,746,000)

(Land Allocation - $25,000)

(Design & Contingencies - $400,000)

(37) West Salem Township, Cossitt Road over Big Run, Bridge Replacement

Project Allocation

1,666,000

(Base Project Allocation - $1,241,000)

(Land Allocation - $25,000)

(Design & Contingencies - $400,000)

(38) (Reserved).

(39) (Reserved).

(40) Mill Creek Township, Crystal Spring Road over Little Sandy Creek, Bridge Replacement

Project Allocation

971,000

(Base Project Allocation - $546,000)

(Land Allocation - $25,000)

(Design & Contingencies - $400,000)

(41) (Reserved).

(42) (Reserved).

(43) (Reserved).

(44) Wolf Creek Township, Elliot Road over Black Run, Bridge Replacement

Project Allocation

1,398,000

(Base Project Allocation - $973,000)

(Land Allocation - $25,000)

(Design & Contingencies - $400,000)

(45) Otter Creek Township, Henry Road over Tributary of Little Shenango River, Bridge Replacement

Project Allocation

1,322,000

(Base Project Allocation - $897,000)

(Land Allocation - $25,000)

(Design & Contingencies - $400,000)

(46) (Reserved).

(47) (Reserved).

(48) Jackson Township, Hosack Road over Yellow Creek, Bridge Replacement

Project Allocation

2,002,000

(Base Project Allocation - $1,577,000)

(Land Allocation - $25,000)

(Design & Contingencies - $400,000)

(49) Lake Township, Hutchenson Road over Tributary of Little Shenango River, Bridge Replacement

Project Allocation

845,000

(Base Project Allocation - $520,000)

(Land Allocation - $25,000)

(Design & Contingencies - $300,000)

(50) (Reserved).

(51) Grove City Borough, Lincoln Avenue over Wolf Creek, Bridge Replacement

Project Allocation

3,089,000

(Base Project Allocation - $2,489,000)

(Land Allocation - $100,000)

(Design & Contingencies - $500,000)

(52) Fairview Township, Marstellar Road over Otter Creek, Bridge Replacement

Project Allocation

1,588,000

(Base Project Allocation - $1,163,000)

(Land Allocation - $25,000)

(Design & Contingencies - $400,000)

(53) (Reserved).

(54) Coolspring Township, Orr Road over Bessemer and Lake Erie Railroad, Bridge Replacement

Project Allocation

2,739,000

(Base Project Allocation - $2,064,000)

(Land Allocation - $75,000)

(Design & Contingencies - $600,000)

(55) (Reserved).

(56) (Reserved).

(57) Sandy Creek Township, Perrine Road over Tributary of Morrison Run, Bridge Replacement

Project Allocation

641,000

(Base Project Allocation - $416,000)

(Land Allocation - $25,000)

(Design & Contingencies - $200,000)

(58) Delaware Township, Pew Road over Tributary of Shenango River, Bridge Replacement

Project Allocation

380,000

(Base Project Allocation - $250,000)

(Land Allocation - $10,000)

(Design & Contingencies - $120,000)

(59) (Reserved).

(60) (Reserved).

(61) Hempfield Township, Scott Road over Tributary of Shenango River, Bridge Replacement

Project Allocation

971,000

(Base Project Allocation - $546,000)

(Land Allocation - $25,000)

(Design & Contingencies - $400,000)

(62) (Reserved).

(63) City of Sharon, Smith Avenue over Tributary of Pine Run, Bridge Replacement

Project Allocation

1,202,000

(Base Project Allocation - $702,000)

(Land Allocation - $100,000)

(Design & Contingencies - $400,000)

(64) (Reserved).

(65) Coolspring Township, Tait Road over Otter Creek, Bridge Replacement

Project Allocation

2,276,000

(Base Project Allocation - $1,851,000)

(Land Allocation - $25,000)

(Design & Contingencies - $400,000)

(66) Pine Township, Tie Line Road over Swamp Run, Bridge Replacement

Project Allocation

1,237,000

(Base Project Allocation - $812,000)

(Land Allocation - $25,000)

(Design & Contingencies - $400,000)

(67) (Reserved).

(68) (Reserved).

(69) (Reserved).

(70) Perry Township, Yeager Road over Pine Run, Bridge Replacement

Project Allocation

1,000,000

(Base Project Allocation - $575,000)

(Land Allocation - $25,000)

(Design & Contingencies - $400,000)

(71) Various Municipalities, Various Local Bridges over Various Spans, Bridge Preservation, Bridge Key 0, Project ID 0

Project Allocation

1,100,000

(Base Project Allocation - $1,000,000)

(Design & Contingencies - $100,000)

(b) State Bridges

(1) (Reserved).

(2) SR 1018 over Lake Wilhelm, Deer Creek Township, Bridge Rehabilitation, Bridge Key 25935, Project ID 97299

Project Allocation

851,000

(Base Project Allocation - $756,000)

(Land Allocation - $19,000)

(Design & Contingencies - $76,000)

(3) SR 4020 Sheakleyville over Little Shenango River, Sugar Grove Township, Bridge Rehabilitation, Bridge Key 26057, Project ID 97295

Project Allocation

111,000

(Base Project Allocation - $92,000)

(Design & Contingencies - $19,000)

(4) SR 1014 Georgetown over Mill Creek, New Lebanon Borough, Bridge Rehabilitation, Bridge Key 25931, Project ID 97291

Project Allocation

111,000

(Base Project Allocation - $92,000)

(Design & Contingencies - $19,000)

(5) SR 3039, Flat Road over Tributary of Little Neshannock Creek, East Lackawannock Township, Bridge Rehabilitation, Bridge Key 26023, Project ID 97332

Project Allocation

362,000

(Base Project Allocation - $258,000)

(Land Allocation - $18,000)

(Design & Contingencies - $86,000)

(6) SR 3007, Pulaski-Mercer Bridge over Risa Run, Shenango Township, Bridge Replacement, Bridge Key 25982, Project ID 97300

Project Allocation

761,000

(Base Project Allocation - $496,000)

(Land Allocation - $17,000)

(Design & Contingencies - $248,000)

(7) SR 3007 Pulaski-Mercer Bridge over West Branch of Neshannock Creek, Wilmington Township, Bridge Rehabilitation, Bridge Key 25983, Project ID 97292

Project Allocation

111,000

(Base Project Allocation - $92,000)

(Design & Contingencies - $19,000)

(8) SR 3008, East State Street over Tributary of Pine Run, City of Hermitage, Bridge Rehabilitation, Bridge Key 25988, Project ID 97301

Project Allocation

951,000

(Base Project Allocation - $691,000)

(Land Allocation - $87,000)

(Design & Contingencies - $173,000)

(9) SR 3022, Rutledge Road over Chestnut Run, Pymatuning Township, Bridge Replacement, Bridge Key 26010, Project ID 90148

Project Allocation

400,000

(Base Project Allocation - $250,000)

(Land Allocation - $50,000)

(Design & Contingencies - $100,000)

(10) SR 1014 Georgetown over Tributary of Sandy Creek, Deer Creek Township, Bridge Rehabilitation, Bridge Key 25926, Project ID 97290

Project Allocation

111,000

(Base Project Allocation - $92,000)

(Design & Contingencies - $19,000)

(11) SR 3032, Connelly Boulevard over Pine Run, City of Sharon, Bridge Rehabilitation, Bridge Key 26021, Project ID 97293

Project Allocation

111,000

(Base Project Allocation - $92,000)

(Design & Contingencies - $19,000)

(12) SR 3039, Flat Road over Tributary of Little Neshannock Creek, East Lackawannock Township, Bridge Rehabilitation, Bridge Key 26024, Project ID 97320

Project Allocation

111,000

(Base Project Allocation - $92,000)

(Design & Contingencies - $19,000)

(13) SR 1001, Summit Road over Tributary of Sugar Run, Greene Township, Bridge Replacement, Bridge Key 26030, Project ID 97268

Project Allocation

262,000

(Base Project Allocation - $163,000)

(Land Allocation - $17,000)

(Design & Contingencies - $82,000)

(14) SR 4002 Carlisle over Booth Run, South Pymatuning Township, Bridge Rehabilitation, Bridge Key 26031, Project ID 97276

Project Allocation

1,442,000

(Base Project Allocation - $1,325,000)

(Land Allocation - $20,000)

(Design & Contingencies - $97,000)

(15) SR 4017, Werner Road over Little Shenango River, Sugar Grove Township, Bridge Rehabilitation, Bridge Key 26049, Project ID 97324

Project Allocation

2,052,000

(Base Project Allocation - $1,605,000)

(Land Allocation - $90,000)

(Design & Contingencies - $357,000)

(16) SR 4020 Sheakleyville over Morrison Run, Sandy Creek Township, Bridge Rehabilitation, Bridge Key 26059, Project ID 97296

Project Allocation

111,000

(Base Project Allocation - $92,000)

(Design & Contingencies - $19,000)

(17) SR 4022, Leech Road over Sankeys Run, Sugar Grove Township, Bridge Rehabilitation, Bridge Key 26068, Project ID 98172

Project Allocation

111,000

(Base Project Allocation - $92,000)

(Design & Contingencies - $19,000)

(18) SR 0080 Westbound Ramp C over Hogback Run, Shenango Township, Bridge Rehabilitation, Bridge Key 26346, Project ID 97316

Project Allocation

1,452,000

(Base Project Allocation - $1,179,000)

(Land Allocation - $91,000)

(Design & Contingencies - $182,000)

(19) SR 1013, Lake Road over Tributary of Sandy Creek, Sandy Creek Township, Bridge Rehabilitation, Bridge Key 25923, Project ID 97289

Project Allocation

111,000

(Base Project Allocation - $92,000)

(Design & Contingencies - $19,000)

(20) SR 0080 Eastbound over Black Run, Wolf Creek Township, Bridge Rehabilitation, Bridge Key 25807, Project ID 97280

Project Allocation

111,000

(Base Project Allocation - 92,000)

(Design & Contingencies - $19,000)

(21) I-376 Parkway East over Old William Penn Highway, Monroeville Borough, Bridge Rehabilitation, Bridge Key 1208, Project ID 87779

Project Allocation

162,000

(Base Project Allocation - $136,000)

(Design & Contingencies - $26,000)

(22) SR 4003 Good Hope over Tributary of Big Run, West Salem Township, Bridge Rehabilitation, Bridge Key 26035, Project ID 97294

Project Allocation

111,000

(Base Project Allocation - $92,000)

(Design & Contingencies - $19,000)

(23) SR 0058, Kinsman Road over Faherty Run, Greene Township, Bridge Rehabilitation, Bridge Key 25667, Project ID 97307

Project Allocation

362,000

(Base Project Allocation - $258,000)

(Land Allocation - $18,000)

(Design & Contingencies - $86,000)

(24) SR 0080 Westbound over Black Run, Wolf Creek Township, Bridge Rehabilitation, Bridge Key 25809, Project ID 97281

Project Allocation

111,000

(Base Project Allocation - $92,000)

(Design & Contingencies - $19,000)

(25) SR 2103 Mill Brook over SR 0079 Northbound and Southbound, Jackson Township, Bridge Rehabilitation, Bridge Key 25746, Project ID 88480

Project Allocation

1,312,000

(Base Project Allocation - $1,108,000)

(Land Allocation - $19,000)

(Design & Contingencies - $185,000)

(26) SR 2102, Clintville Road over SR 0079 Southbound, Findley Township, Bridge Rehabilitation, Bridge Key 25742, Project ID 88482

Project Allocation

911,000

(Base Project Allocation - $714,000)

(Land Allocation - $18,000)

(Design & Contingencies - $179,000)

(27) SR 2102, Clintville Road over SR 0079 Northbound, Findley Township, Bridge Rehabilitation, Bridge Key 25741, Project ID 88483

Project Allocation

911,000

(Base Project Allocation - $714,000)

(Land Allocation - $18,000)

(Design & Contingencies - $179,000)

(28) SR 0062, Franklin Road over Fox Run, Jackson Township, Bridge Rehabilitation, Bridge Key 25719, Project ID 88488

Project Allocation

90,000

(Base Project Allocation - $60,000)

(Land Allocation - $10,000)

(Design & Contingencies - $20,000)

(29) SR 0062, Franklin Road over Yellow Creek, Jackson Township, Bridge Rehabilitation, Bridge Key 25717, Project ID 97323

Project Allocation

362,000

(Base Project Allocation - $258,000)

(Land Allocation - $18,000)

(Design & Contingencies - $86,000)

(30) SR 0062, Franklin Road over Spring Creek, Coolspring Township, Bridge Rehabilitation, Bridge Key 25715, Project ID 88486

Project Allocation

362,000

(Base Project Allocation - $258,000)

(Land Allocation - $18,000)

(Design & Contingencies - $86,000)

(31) SR 0062, North Sharon Mercer Road over Lackawannock Creek, East Lackawannock Township, Bridge Rehabilitation, Bridge Key 25711, Project ID 97306

Project Allocation

362,000

(Base Project Allocation - $258,000)

(Land Allocation - $18,000)

(Design & Contingencies - $86,000)

(32) SR 0062, Sharon Mercer Road over Tributary of Magargee Run, Jefferson Township, Bridge Replacement, Bridge Key 25709, Project ID 90024

Project Allocation

450,000

(Base Project Allocation - $300,000)

(Land Allocation - $50,000)

(Design & Contingencies - $100,000)

(33) SR 0062, East State Street over Tributary of Shenango River, City of Hermitage, Bridge Rehabilitation, Bridge Key 25708, Project 97327

Project Allocation

362,000

(Base Project Allocation - $258,000)

(Land Allocation - $18,000)

(Design & Contingencies - $86,000)

(34) SR 0058, South Diamond Street over Munnel Run, Coolspring Township, Bridge Rehabilitation, Bridge Key 25675, Project ID 97317

Project Allocation

441,000

(Base Project Allocation - $335,000)

(Land Allocation - $18,000)

(Design & Contingencies - $88,000)

(35) SR 0080 Eastbound over SR 0718, Sieg Hill Road, Shenango Township, Bridge Rehabilitation, Bridge Key 25766, Project ID 97309

Project Allocation

1,511,000

(Base Project Allocation - $1,305,000)

(Land Allocation - $19,000)

(Design & Contingencies - $187,000)

(36) SR 0058, College Avenue over Mathay Run, Hempfield Township, Bridge Rehabilitation, Bridge Key 25671, Project ID 97305

Project Allocation

362,000

(Base Project Allocation - $258,000)

(Land Allocation - $18,000)

(Design & Contingencies - $86,000)

(37) SR 0080 Westbound over SR 0718, Sieg Hill Road, Shenango Township, Bridge Rehabilitation, Bridge Key 25767, Project ID 97310

Project Allocation

1,511,000

(Base Project Allocation - $1,305,000)

(Land Allocation - $19,000)

(Design & Contingencies - $187,000)

(38) SR 0019, Perry Highway over Tributary of Little Shenango River, Perry Township, Bridge Rehabilitation, Bridge Key 25655, Project ID 84916

Project Allocation

72,000

(Base Project Allocation - $72,000)

(39) SR 0019, Perry Highway over Tributary of Otter Creek, Fairview Township, Bridge Rehabilitation, Bridge Key 25654, Project ID 97277

Project Allocation

431,000

(Base Project Allocation - $374,000)

(Land Allocation - $19,000)

(Design & Contingencies - $38,000)

(40) SR 0019, Perry Highway over Tributary of Otter Creek, Coolspring Township, Bridge Replacement, Bridge Key 25650, Project ID 90031

Project Allocation

1,821,000

(Base Project Allocation - $1,305,000)

(Land Allocation - $86,000)

(Design & Contingencies - $430,000)

(41) SR 0019, Perry Highway over Tributary of Otter Creek, Coolspring Township, Bridge Rehabilitation, Bridge Key 25649, Project ID 97331

Project Allocation

362,000

(Base Project Allocation - $258,000)

(Land Allocation - $18,000)

(Design & Contingencies - $86,000)

(42) SR 0019, Franklin Street over Munnel Run, Coolspring Township, Bridge Replacement, Bridge Key 25648, Project ID 97322

Project Allocation

591,000

(Base Project Allocation - $382,000)

(Land Allocation - $87,000)

(Design & Contingencies - $122,000)

(43) SR 0019, Perry Highway over Tributary of Neshannock Creek, Mercer Borough, Bridge Rehabilitation, Bridge Key 25647, Project ID 97304

Project Allocation

211,000

(Base Project Allocation - $191,000)

(Design & Contingencies - $20,000)

(44) SR 0019, Perry Highway over Tributary of Neshannock Creek, East Lackawannock Township, Bridge Replacement, Bridge Key 25646, Project ID 90032

Project Allocation

450,000

(Base Project Allocation - $300,000)

(Land Allocation - $50,000)

(Design & Contingencies - $100,000)

(45) SR 0019, Perry Highway over Beaver Run, East Lackawannock Township, Bridge Rehabilitation, Bridge Key 25645, Project ID 97303

Project Allocation

211,000

(Base Project Allocation - $191,000)

(Design & Contingencies - $20,000)

(46) SR 0019, Perry Highway over Small Stream, Springfield Township, Bridge Rehabilitation, Bridge Key 25643, Project ID 84915

Project Allocation

211,000

(Base Project Allocation - $191,000)

(Design & Contingencies - $20,000)

(47) SR 0018, Sharon Road over Big Run, West Salem Township, Bridge Rehabilitation, Bridge Key 25636, Project ID 88485

Project Allocation

120,000

(Base Project Allocation - $80,000)

(Land Allocation - $10,000)

(Design & Contingencies - $30,000)

(48) SR 0018 over Conrail Railroad Siding, Pymatuning Township, Bridge Restoration, Bridge Key 25635, Project ID 73500

Project Allocation

480,000

(Base Project Allocation - $180,000)

(Land Allocation - $100,000)

(Design & Contingencies - $200,000)

(49) SR 0018 South of Hermitage over Tributary of Shenango River, City of Hermitage, Bridge Rehabilitation, Bridge Key 25632, Project ID 97272

Project Allocation

511,000

(Base Project Allocation - $491,000)

(Design & Contingencies - $20,000)

(50) SR 0058, Mercer Road over Krem Run, Delaware Township, Bridge Rehabilitation, Bridge Key 25673, Project ID 97315

Project Allocation

362,000

(Base Project Allocation - $258,000)

(Land Allocation - $18,000)

(Design & Contingencies - $86,000)

(51) SR 0208 over Black Run, Springfield Township, Bridge Replacement, Bridge Key 25840, Project ID 90033

Project Allocation

1,661,000

(Base Project Allocation - $1,152,000)

(Land Allocation - $85,000)

(Design & Contingencies - $424,000)

(52) SR 1004, Fredonia Road over Tributary of Little Shenango River, Lake Township, Bridge Replacement, Bridge Key 25911, Project ID 89120

Project Allocation

761,000

(Base Project Allocation - $496,000)

(Land Allocation - $17,000)

(Design & Contingencies - $248,000)

(53) SR 1004, Stoneboro over SR 0079 Northbound and Southbound, Lake Township, Bridge Rehabilitation, Bridge Key 25910, Project ID 88481

Project Allocation

1,691,000

(Base Project Allocation - $1,484,000)

(Land Allocation - $19,000)

(Design & Contingencies - $188,000)

(54) SR 1002, Fairview Road over Otter Creek, Fairview Township, Bridge Rehabilitation, Bridge Key 25908, Project ID 88484

Project Allocation

340,000

(Base Project Allocation - $238,000)

(Land Allocation - $17,000)

(Design & Contingencies - $85,000)

(55) SR 0965, Kilgore Road over Sandy Creek, Worth Township, Bridge Rehabilitation, Bridge Key 25903, Project ID 88487

Project Allocation

90,000

(Base Project Allocation - $60,000)

(Land Allocation - $10,000)

(Design & Contingencies - $20,000)

(56) SR 0965, North Jackson Center Road over Tributary of Wolf Creek, Worth Township, Bridge Rehabilitation, Bridge Key 25902, Project ID 97275

Project Allocation

222,000

(Base Project Allocation - $184,000)

(Land Allocation - $19,000)

(Design & Contingencies - $19,000)

(57) SR 0965, North Jackson Center Road over Yellow Creek, Jackson Township, Bridge Rehabilitation, Bridge Key 25901, Project ID 97319

Project Allocation

111,000

(Base Project Allocation - $92,000)

(Design & Contingencies - $19,000)

(58) SR 0846, Orangeville Road over Big Run, West Salem Township, Bridge Rehabilitation, Bridge Key 25899, Project ID 89123

Project Allocation

131,000

(Base Project Allocation - $112,000)

(Design & Contingencies - $19,000)

(59) SR 0846, Saranac Road over Shenango Reservoir, South Pymatuning Township, Bridge Rehabilitation, Bridge Key 25897, Project ID 97329

Project Allocation

3,342,000

(Base Project Allocation - $3,035,000)

(Land Allocation - $20,000)

(Design & Contingencies - $287,000)

(60) SR 0845, Linden Street over Sawmill Run, Stoneboro Borough, Bridge Rehabilitation, Bridge Key 25895, Project ID 97298

Project Allocation

111,000

(Base Project Allocation - $92,000)

(Design & Contingencies - $19,000)

(61) SR 0718, Sieg Hill Road over Shenango River, Shenango Township, Bridge Rehabilitation, Bridge Key 25887, Project ID 88479

Project Allocation

220,000

(Base Project Allocation - $180,000)

(Land Allocation - $10,000)

(Design & Contingencies - $30,000)

(62) SR 0358, Hadley Road over Sankeys Run, Hempfield Township, Bridge Rehabilitation, Bridge Key 25868, Project ID 97302

Project Allocation

422,000

(Base Project Allocation - $382,000)

(Land Allocation - $20,000)

(Design & Contingencies - $20,000)

(63) SR 0318 West Middlesex-Mercer over West Branch of Neshannock Creek, Lackawannock Township, Bridge Replacement, Bridge Key 25859, Project ID 92978

Project Allocation

800,000

(Base Project Allocation - $800,000)

(64) SR 0258, Lake Road over Tributary of Shenango River, Clark Borough, Bridge Rehabilitation, Bridge Key 25853, Project ID 97287

Project Allocation

111,000

(Base Project Allocation - $92,000)

(Design & Contingencies - $19,000)

(65) SR 1012 Glenn School over Little Sandy Creek, Mill Creek Township, Bridge Rehabilitation, Bridge Key 25921, Project ID 97288

Project Allocation

111,000

(Base Project Allocation - $92,000)

(Design & Contingencies - $19,000)

(66) SR 0173 Cochranton over Mill Creek, New Lebanon Borough, Bridge Replacement, Bridge Key 25833, Project ID 97328

Project Allocation

391,000

(Base Project Allocation - $244,000)

(Land Allocation - $17,000)

(Design & Contingencies - $130,000)

(67) SR 0173 Grove City over Tributary of Black Run, Pine Township, Bridge Rehabilitation, Bridge Key 25826, Project ID 97308

Project Allocation

211,000

(Base Project Allocation - $191,000)

(Design & Contingencies - $20,000)

(68) SR 0173, Liberty Street over Swamp Run, Pine Township, Bridge Replacement, Bridge Key 25824, Project ID 89104

Project Allocation

139,000

(Land Allocation - $52,000)

(Design & Contingencies - $87,000)

(69) SR 0080 Westbound over Wolf Creek, Wolf Creek Township, Bridge Rehabilitation, Bridge Key 25812, Project ID 97286

Project Allocation

111,000

(Base Project Allocation - $92,000)

(Design & Contingencies - $19,000)

(70) SR 0080 Eastbound over Wolf Creek, Wolf Creek Township, Bridge Rehabilitation, Bridge Key 25811, Project ID 97285

Project Allocation

111,000

(Base Project Allocation - $92,000)

(Design & Contingencies - $19,000)

(71) SR 0080 Westbound over SR 0173, Grove City, Wolf Creek Township, Bridge Rehabilitation, Bridge Key 25810, Project ID 97284

Project Allocation

111,000

(Base Project Allocation - $92,000)

(Design & Contingencies - $19,000)

(72) SR 0080 Eastbound over SR 0173, Grove City, Wolf Creek Township, Bridge Rehabilitation, Bridge Key 25808, Project ID 97282

Project Allocation

111,000

(Base Project Allocation - $92,000)

(Design & Contingencies - $19,000)

(73) SR 0080 Westbound over Neshannock Creek, Shenango Township, Bridge Rehabilitation, Bridge Key 25779, Project ID 97314

Project Allocation

1,511,000

(Base Project Allocation - $1,305,000)

(Land Allocation - $19,000)

(Design & Contingencies - $187,000)

(74) SR 0080 Eastbound over Neshannock Creek, Shenango Township, Bridge Rehabilitation, Bridge Key 25778, Project ID 97313

Project Allocation

1,511,000

(Base Project Allocation - $1,305,000)

(Land Allocation - $19,000)

(Design & Contingencies - $187,000)

(75) SR 0080 Westbound over SR 0318, West Middlesex-Mercer Road, Shenango Township, Bridge Rehabilitation, Bridge Key 25777, Project ID 97334

Project Allocation

1,711,000

(Base Project Allocation - $1,504,000)

(Land Allocation - $19,000)

(Design & Contingencies - $188,000)

(76) SR 0080 Eastbound over SR 0318, West Middlesex-Mercer Road, Shenango Township, Bridge Rehabilitation, Bridge Key 25776, Project ID 97333

Project Allocation

1,711,000

(Base Project Allocation - $1,504,000)

(Land Allocation - $19,000)

(Design & Contingencies - $188,000)

(77) SR 0318, Hubbard-West Middlesex Road over Tributary of Shenango River, Shenango Township, Bridge Replacement, Bridge Key 25855, Project ID 89116

Project Allocation

499,000

(Base Project Allocation - $446,000)

(Land Allocation - $17,000)

(Design & Contingencies - $36,000)

(78) SR 0258, Lake Road over Lackawannock Creek, Jefferson Township, Bridge Rehabilitation, Bridge Key 39964, Project ID 97318

Project Allocation

111,000

(Base Project Allocation - $92,000)

(Design & Contingencies - $19,000)

(79) SR 0080 Westbound over T-998, Centertown Road, Wolf Creek Township, Bridge Rehabilitation, Bridge Key 40966, Project ID 97297

Project Allocation

111,000

(Base Project Allocation - $92,000)

(Design & Contingencies - $19,000)

(80) SR 0208 over Wolf Creek, Grove City Borough, Bridge Rehabilitation, Bridge Key 42413, Project ID 97330

Project Allocation

171,000

(Base Project Allocation - $152,000)

(Design & Contingencies - $19,000)

(81) Various State-Owned Bridges over Various Spans, Various Municipalities, Bridge Preservation, Bridge Key 0, Project ID 0

Project Allocation

1,100,000

(Base Project Allocation - $1,000,000)

(Design & Contingencies - $100,000)