Section 5. Adams County.
(a) Local Bridges
Local
State
(1) Various Municipalities, Various Routes over Various Spans, Bridge Preservation, Bridge Key 0, Project ID 0
Project Allocation
1,100,000
(Base Project Allocation - $1,000,000)
(Design & Contingencies - $100,000)
(b) State Bridges
(1) (Reserved).
(2) PA 234, SR 0234 0.75 Mile West of Heidlersburg over Tributary of Conewago Creek, Tyrone Township, Bridge Replacement, Bridge Key 151, Project ID 87426
Project Allocation
133,000
(Base Project Allocation - $133,000)
(3) PA 116, SR 0116 over Middle Creek, Fairfield Borough, Bridge Rehabilitation, Bridge Key 97, Project ID 99181
Project Allocation
430,000
(Base Project Allocation - $376,000)
(Design & Contingencies - $54,000)
(4) SR 1020 East of Idaville over Branch of Bermudian Creek, Huntington Township, Bridge Replacement, Bridge Key 208, Project ID 90707
Project Allocation
401,000
(Base Project Allocation - $401,000)
(5) SR 1019 2.25 Miles North of New Oxford over Tributary of Pine Run, Hamilton Township, Bridge Replacement, Bridge Key 204, Project ID 90702
Project Allocation
401,000
(Base Project Allocation - $401,000)
(6) SR 1017 1.5 Miles North of Hunterstown over Beaverdam Creek, Straban Township, Bridge Rehabilitation, Bridge Key 199, Project ID 81087
Project Allocation
132,000
(Base Project Allocation - $111,000)
(Design & Contingencies - $21,000)
(7) SR 1016, Gardners over Upper Bermudian Creek, Huntington Township, Bridge Replacement, Bridge Key 198, Project ID 87671
Project Allocation
165,000
(Base Project Allocation - $165,000)
(8) SR 1014, Village of Limerock Mill over Bermudian Creek, Huntington Township, Bridge Replacement, Bridge Key 185, Project ID 87676
Project Allocation
95,000
(Base Project Allocation - $95,000)
(9) SR 1009 Northwest of Five Points over Tributary of Bermudian Creek, Huntington Township, Bridge Replacement, Bridge Key 181, Project ID 87431
Project Allocation
45,000
(Base Project Allocation - $45,000)
(10) SR 1007 1.0 Mile South of Bermudian over Bermudian Creek, Latimore Township, Bridge Rehabilitation, Bridge Key 178, Project ID 99720
Project Allocation
610,000
(Base Project Allocation - $610,000)
(11) SR 1005 1.0 Mile North of Latimore over Latimore Creek, Latimore Township, Bridge Replacement, Bridge Key 176, Project ID 90699
Project Allocation
801,000
(Base Project Allocation - $801,000)
(12) SR 1005 3.0 Miles Southeast of York Springs over Mud Creek, Reading Township, Bridge Rehabilitation, Bridge Key 171, Project ID 99662
Project Allocation
520,000
(Base Project Allocation - $520,000)
(13) PA 394, SR 0394 0.75 Mile Northeast of New Chester over Conewago Creek, Straban Township, Bridge Replacement, Bridge Key 168, Project ID 90698
Project Allocation
435,000
(Base Project Allocation - $397,000)
(Land Allocation - $19,000)
(Design & Contingencies - $19,000)
(14) SR 2006 1.0 Mile North of McSherrystown over South Branch of Conewago Creek, Mount Pleasant Township, Bridge Rehabilitation, Bridge Key 234, Project ID 99743
Project Allocation
880,000
(Base Project Allocation - $880,000)
(15) PA 394, SR 0394 over Tributary of Conewago Creek, Biglerville Borough, Bridge Replacement, Bridge Key 159, Project ID 87422
Project Allocation
77,000
(Base Project Allocation - $77,000)
(16) SR 2007, Edge Grove over South Branch of Conewago Creek, Oxford Township, Bridge Rehabilitation, Bridge Key 237, Project ID 99749
Project Allocation
920,000
(Base Project Allocation - $920,000)
(17) PA 234, SR 0234 2.0 Miles Northeast of Biglerville over Opossum Creek, Butler Township, Bridge Replacement, Bridge Key 148, Project ID 87434
Project Allocation
366,000
(Base Project Allocation - $366,000)
(18) PA 234, SR 0234 Bridgeport over Conewago Creek, Menallen Township, Bridge Rehabilitation, Bridge Key 138, Project ID 99679
Project Allocation
580,000
(Base Project Allocation - $580,000)
(19) PA 234, SR 0234 Culps Corners over Conewago Creek, Franklin Township, Bridge Replacement, Bridge Key 135, Project ID 87436
Project Allocation
120,000
(Base Project Allocation - $120,000)
(20) PA 234, SR 0234 West of Culps Corners over Conewago Creek, Franklin Township, Bridge Replacement, Bridge Key 134, Project ID 90693
Project Allocation
1,000,000
(Base Project Allocation - $1,000,000)
(21) PA 194, SR 0194 over Branch of Beaver Creek, Abbottstown Borough, Bridge Replacement, Bridge Key 128, Project ID 99774
Project Allocation
1,500,000
(Base Project Allocation - $1,500,000)
(22) PA 194, SR 0194 Northeast of Littlestown over South Branch of Conewago Creek, Union Township, Bridge Rehabilitation, Bridge Key 124, Project ID 99675
Project Allocation
770,000
(Base Project Allocation - $770,000)
(23) PA 194, SR 0194 East of Littlestown over Tributary of Conewago Creek, Union Township, Bridge Rehabilitation, Bridge Key 122, Project ID 99660
Project Allocation
300,000
(Base Project Allocation - $300,000)
(24) PA 134, SR 0134 North of Barlow over Plum Run, Cumberland Township, Bridge Replacement, Bridge Key 119, Project ID 99815
Project Allocation
1,900,000
(Base Project Allocation - $1,900,000)
(25) PA 134, SR 0134 Barlow over Rock Creek, Mount Joy Township, Bridge Rehabilitation, Bridge Key 118, Project ID 99672
Project Allocation
852,000
(Base Project Allocation - $464,000)
(Land Allocation - $78,000)
(Design & Contingencies - $310,000)
(26) PA 116, SR 0116 West of McSherrystown over Plum Creek, McSherrystown Borough, Bridge Replacement, Bridge Key 115, Project ID 99812
Project Allocation
3,200,000
(Base Project Allocation - $3,200,000)
(27) PA 116, SR 0116 0.5 Mile West of Brushtown over South Branch of Conewago Creek, Union Township, Bridge Rehabilitation, Bridge Key 114, Project ID 81087
Project Allocation
531,000
(Base Project Allocation - $449,000)
(Design & Contingencies - $82,000)
(28) PA 116, SR 0116 over Stevens Run, Gettysburg Borough, Bridge Replacement, Bridge Key 104, Project ID 99776
Project Allocation
1,300,000
(Base Project Allocation - $1,300,000)
(29) PA 394, SR 0394 1.25 Miles Southeast of Table Rock over Rock Creek, Straban Township, Bridge Replacement, Bridge Key 162, Project ID 87672
Project Allocation
45,000
(Base Project Allocation - $45,000)
(30) SR 3009, Fountaindale over Miney Branch of Tom's Creek, Liberty Township, Bridge Rehabilitation, Bridge Key 306, Project ID 99862
Project Allocation
370,000
(Base Project Allocation - $370,000)
(31) SR 4014, Township Road, Beechersville over Conewago Creek, Butler Township, Bridge Rehabilitation, Bridge Key 385, Project ID 99864
Project Allocation
800,000
(Base Project Allocation - $800,000)
(32) SR 4011 Near Adams and Franklin County Line over Carbaugh Run, Franklin Township, Bridge Replacement, Bridge Key 381, Project ID 90784
Project Allocation
1,170,000
(Base Project Allocation - $1,170,000)
(33) SR 4008 1.0 Mile North of Arendtsville over Pleasantdale Creek, Menallen Township, Bridge Rehabilitation, Bridge Key 369, Project ID 99860
Project Allocation
150,000
(Base Project Allocation - $150,000)
(34) SR 4008 1.0 Mile North of Arendtsville over Conewago Creek, Franklin Township, Bridge Rehabilitation, Bridge Key 366, Project ID 99859
Project Allocation
520,000
(Base Project Allocation - $520,000)
(35) SR 4006 Aspers over Opossum Creek, Menallen Township, Bridge Replacement, Bridge Key 364, Project ID 87438
Project Allocation
321,000
(Base Project Allocation - $321,000)
(36) SR 4005 0.25 Mile North of Bendersville over Opossum Creek, Menallen Township, Bridge Replacement, Bridge Key 362, Project ID 87437
Project Allocation
271,000
(Base Project Allocation - $271,000)
(37) SR 4001 Centre Mills over Mill Race, Butler Township, Bridge Replacement, Bridge Key 352, Project ID 92564
Project Allocation
106,000
(Base Project Allocation - $106,000)
(38) SR 3017 3.25 Miles Northwest of Gettysburg over Mud Run, Franklin Township, Bridge Replacement, Bridge Key 329, Project ID 87435
Project Allocation
100,000
(Base Project Allocation - $100,000)
(39) SR 3017 Northwest of Gettysburg over Willoughby Run, Cumberland Township, Bridge Rehabilitation, Bridge Key 328, Project ID 81087
Project Allocation
132,000
(Base Project Allocation - $111,000)
(Design & Contingencies - $21,000)
(40) SR 3015 1.0 Mile North of McKnightstown over Marsh Creek, Franklin Township, Bridge Replacement, Bridge Key 323, Project ID 87674
Project Allocation
530,000
(Base Project Allocation - $332,000)
(Land Allocation - $38,000)
(Design & Contingencies - $160,000)
(41) SR 3013 Knoxlyn over Marsh Creek, Highland Township, Bridge Replacement, Bridge Key 319, Project ID 87675
Project Allocation
121,000
(Base Project Allocation - $121,000)
(42) SR 1020 Northwest of York Springs over Tributary of Latimore Creek, Huntington Township, Bridge Replacement, Bridge Key 213, Project ID 90727
Project Allocation
300,000
(Base Project Allocation - $300,000)
(43) SR 3010 Fairfield over Spring Run, Hamiltonban Township, Bridge Replacement, Bridge Key 307, Project ID 87430
Project Allocation
205,000
(Base Project Allocation - $62,000)
(Land Allocation - $62,000)
(Design & Contingencies - $81,000)
(44) SR 2014 1.0 Mile East of Kingsdale over Piney Creek, Germany Township, Bridge Replacement, Bridge Key 247, Project ID 90743
Project Allocation
1,700,000
(Base Project Allocation - $1,700,000)
(45) Pumping Station Road 3.5 Miles Southwest of Gettysburg over Marsh Creek, Cumberland Township, Bridge Rehabilitation, Bridge Key 291, Project ID 99836
Project Allocation
1,530,000
(Base Project Allocation - $1,530,000)
(46) SR 3003 2.5 Miles Northeast of Gettysburg over Rock Creek, Straban Township, Bridge Rehabilitation, Bridge Key 286, Project ID 81087
Project Allocation
132,000
(Base Project Allocation - $111,000)
(Design & Contingencies - $21,000)
(47) SR 3003 2.5 Miles Northeast of Gettysburg over US 15, SR 0015, Straban Township, Bridge Rehabilitation, Bridge Key 285, Project ID 99835
Project Allocation
1,070,000
(Base Project Allocation - $1,070,000)
(48) SR 3002 2.25 Miles South of Barlow over Rock Creek, Cumberland Township, Bridge Rehabilitation, Bridge Key 281, Project ID 99832
Project Allocation
1,190,000
(Base Project Allocation - $1,190,000)
(49) SR 3002, Mason Dixon 0.5 Mile North of State Line over Tributary of Marsh Creek, Cumberland Township, Bridge Replacement, Bridge Key 280, Project ID 99777
Project Allocation
817,000
(Base Project Allocation - $351,000)
(Land Allocation - $72,000)
(Design & Contingencies - $394,000)
(50) SR 3001, State Street over Tributary of Bermudian Creek, York Springs Borough, Bridge Replacement, Bridge Key 278, Project ID 87432
Project Allocation
141,000
(Base Project Allocation - $141,000)
(51) SR 3001, Carlisle 1.5 Blocks North of Square over Stevens Run, Gettysburg Borough, Bridge Replacement, Bridge Key 267, Project ID 99821
Project Allocation
2,200,000
(Base Project Allocation - $2,200,000)
(52) SR 2027 2.5 Miles South of Littlestown over Tributary of Conewago Creek, Union Township, Bridge Rehabilitation, Bridge Key 253, Project ID 99756
Project Allocation
200,000
(Base Project Allocation - $200,000)
(53) SR 2015 Northwest of New Oxford over Swift Run, Mount Pleasant Township, Bridge Rehabilitation, Bridge Key 249, Project ID 99751
Project Allocation
470,000
(Base Project Allocation - $470,000)
(54) SR 2014 0.5 Mile North of State Line over Alloway Creek, Germany Township, Bridge Replacement, Bridge Key 246, Project ID 90740
Project Allocation
2,260,000
(Base Project Allocation - $2,260,000)
(55) SR 2009 1.5 Miles North of Edgegrove over Tributary of Conewago Creek, Conewago Township, Bridge Replacement, Bridge Key 239, Project ID 87418
Project Allocation
124,000
(Land Allocation - $10,000)
(Design & Contingencies - $114,000)
(56) SR 2009 Edgegrove over Plum Creek, Conewago Township, Bridge Rehabilitation, Bridge Key 238, Project ID 81087
Project Allocation
156,000
(Base Project Allocation - $132,000)
(Design & Contingencies - $24,000)
(57) SR 3011 1.0 Mile North of Orrtanna over Little Marsh Creek, Franklin Township, Bridge Rehabilitation, Bridge Key 310, Project ID 99857
Project Allocation
500,000
(Base Project Allocation - $500,000)
(58) US 15 Southbound, SR 0015 2.0 Miles Northeast of Gettysburg over CSX, Straban Township, Bridge Rehabilitation, Bridge Key 19, Project ID 99739
Project Allocation
1,066,000
(Base Project Allocation - $576,000)
(Land Allocation - $58,000)
(Design & Contingencies - $432,000)
(59) SR 2016 2.0 Miles South of Brushtown over Sterners Creek, Union Township, Bridge Rehabilitation, Bridge Key 252, Project ID 99752
Project Allocation
230,000
(Base Project Allocation - $230,000)
(60) US 15 Southbound, SR 0015 1.25 Miles North of State Line over Middle Creek, Freedom Township, Bridge Rehabilitation, Bridge Key 3, Project ID 99724
Project Allocation
1,451,000
(Base Project Allocation - $953,000)
(Land Allocation - $83,000)
(Design & Contingencies - $415,000)
(61) T-417, Sach's Road South of Gettysburg over US 15 Southbound, SR 0015, Cumberland Township, Bridge Rehabilitation, Bridge Key 10, Project ID 99761
Project Allocation
420,000
(Base Project Allocation - $420,000)
(62) US 15 Southbound, SR 0015 2.5 Miles South of Gettysburg over Tributary of Rock Creek, Cumberland Township, Bridge Rehabilitation, Bridge Key 11, Project ID 99727
Project Allocation
322,000
(Base Project Allocation - $146,000)
(Land Allocation - $30,000)
(Design & Contingencies - $146,000)
(63) PA 97, SR 0097 1.0 Mile North of Littlestown over Alloway Creek, Mount Joy Township, Bridge Replacement, Bridge Key 87, Project ID 87673
Project Allocation
304,000
(Base Project Allocation - $304,000)
(64) US 15 Southbound, SR 0015 2.0 Miles East of Gettysburg over PA 116, SR 0116, Straban Township, Bridge Rehabilitation, Bridge Key 15, Project ID 99736
Project Allocation
601,000
(Base Project Allocation - $215,000)
(Land Allocation - $86,000)
(Design & Contingencies - $300,000)
(65) T-530, Woodside Road Northeast of Gettysburg over US 15, SR 0015, Straban Township, Bridge Rehabilitation, Bridge Key 22, Project ID 99666
Project Allocation
1,820,000
(Base Project Allocation - $1,820,000)
(66) PA 16, SR 0016 Southwest of Gettysburg over Miney Branch, Liberty Township, Bridge Rehabilitation, Bridge Key 38, Project ID 99181
Project Allocation
430,000
(Base Project Allocation - $376,000)
(Design & Contingencies - $54,000)
(67) US 30, SR 0030 Caledonia over Newmans Creek, Franklin Township, Bridge Replacement, Bridge Key 40, Project ID 99781
Project Allocation
1,900,000
(Base Project Allocation - $1,900,000)
(68) US 30, SR 0030 Northwest of Gettysburg over Tributary of Marsh Creek, Franklin Township, Bridge Rehabilitation, Bridge Key 42, Project ID 99181
Project Allocation
430,000
(Base Project Allocation - $376,000)
(Design & Contingencies - $54,000)
(69) PA 34, SR 0034 0.25 Mile West of Gardners over Tributary of Opossum Creek, Menallen Township, Bridge Replacement, Bridge Key 72, Project ID 87433
Project Allocation
34,000
(Base Project Allocation - $34,000)
(70) US 15 Southbound, SR 0015 South of Gettysburg over Rock Creek, Cumberland Township, Bridge Rehabilitation, Bridge Key 13, Project ID 99734
Project Allocation
1,780,000
(Base Project Allocation - $1,780,000)
(71) PA 97, SR 0097 Littlestown Borough Line over Piney Creek, Germany Township, Bridge Replacement, Bridge Key 86, Project ID 99786
Project Allocation
1,700,000
(Base Project Allocation - $1,700,000)
(72) US 30, SR 0030 Seven Stars over Marsh Creek, Franklin Township, Bridge Rehabilitation, Bridge Key 43, Project ID 99181
Project Allocation
430,000
(Base Project Allocation - $376,000)
(Design & Contingencies - $54,000)
(73) PA 97, SR 0097 1.5 Miles South of Littlestown over Piney Creek, Germany Township, Bridge Replacement, Bridge Key 84, Project ID 90686
Project Allocation
500,000
(Base Project Allocation - $500,000)
(74) PA 34, SR 0034 Idaville over Bermudian Creek, Tyrone Township, Bridge Replacement, Bridge Key 75, Project ID 87417
Project Allocation
850,000
(Base Project Allocation - $722,000)
(Land Allocation - $37,000)
(Design & Contingencies - $91,000)
(75) PA 97, SR 0097 1.5 Miles South of Littlestown over Tributary of Piney Creek, Germany Township, Bridge Replacement, Bridge Key 85, Project ID 90692
Project Allocation
400,000
(Base Project Allocation - $400,000)
(76) PA 34, SR 0034 North of Biglerville over Opossum Creek, Menallen Township, Bridge Replacement, Bridge Key 71, Project ID 87427
Project Allocation
376,000
(Base Project Allocation - $376,000)
(77) PA 34, SR 0034 over Tributary of Conewago Creek, Biglerville Borough, Bridge Replacement, Bridge Key 66, Project ID 87416
Project Allocation
241,000
(Base Project Allocation - $173,000)
(Land Allocation - $6,000)
(Design & Contingencies - $62,000)
(78) US 30, SR 0030, 0.5 Mile West of Abbottstown over Pine Run, Hamilton Township, Bridge Replacement, Bridge Key 57, Project ID 99784
Project Allocation
1,100,000
(Base Project Allocation - $1,100,000)
(79) US 30, SR 0030 1.0 Mile West of New Oxford over Brush Run, Mount Pleasant Township, Bridge Replacement, Bridge Key 53, Project ID 99830
Project Allocation
1,500,000
(Base Project Allocation - $1,500,000)
(80) US 30, SR 0030 over Rock Creek, Gettysburg Borough, Bridge Replacement, Bridge Key 47, Project ID 87428
Project Allocation
1,273,000
(Base Project Allocation - $1,273,000)
(81) PA 94, SR 0094 1.25 Miles Southeast of Hampton over Conewago Creek, Hamilton Township, Bridge Rehabilitation, Bridge Key 76, Project ID 99181
Project Allocation
430,000
(Base Project Allocation - $376,000)
(Design & Contingencies - $54,000)
(82) Various State-Owned Bridges over Various Spans, Various Municipalities, Bridge Preservation, Bridge Key 0, Project ID 0
Project Allocation
1,100,000
(Base Project Allocation - $1,000,000)
(Design & Contingencies - $100,000)