Section 50. Montgomery County.
(a) Local Bridges
Local
State
(1) Plymouth Township, Ridge Pike over Norfolk Southern Railroad, Bridge Rehabilitation, Bridge Key 27911, Project ID 48175
Project Allocation
3,000
(Base Project Allocation - $1,000)
(Land Allocation - $1,000)
(Design & Contingencies - $1,000)
(2) Lower Salford Township, Groffs Mill Road over Branch of Perkiomen Creek, Bridge Replacement
Project Allocation
315,000
(Base Project Allocation - $225,000)
(Design & Contingencies - $90,000)
(3) Lower Salford Township, Wambold Road over Branch of Skippack Creek, Bridge Replacement
Project Allocation
450,000
(Base Project Allocation - $325,000)
(Design & Contingencies - $125,000)
(4) Lower Salford Township, Store Road over Branch of Skippack Creek, Bridge Replacement
Project Allocation
400,000
(Base Project Allocation - $300,000)
(Design & Contingencies - $100,000)
(5) Lower Salford Township, Stover Road over West Skippack Creek, Bridge Replacement
Project Allocation
400,000
(Base Project Allocation - $300,000)
(Design & Contingencies - $100,000)
(6) Lower Salford Township, Quarry Road over West Skippack Creek, Bridge Replacement
Project Allocation
950,000
(Base Project Allocation - $750,000)
(Design & Contingencies - $200,000)
(7) Lower Salford Township, Alderfer Road over West Skippack Creek, Bridge Replacement
Project Allocation
575,000
(Base Project Allocation - $425,000)
(Design & Contingencies - $150,000)
(8) Lower Salford Township, Indian Creek Road over Indian Creek, Bridge Replacement
Project Allocation
450,000
(Base Project Allocation - $325,000)
(Design & Contingencies - $125,000)
(9) Upper Merion Township, Allendale Road over Abrams Run, Bridge Replacement
Project Allocation
861,000
(Base Project Allocation - $695,000)
(Design & Contingencies - $166,000)
(10) Lower Merion Township, Norfolk Southern Railroad over Belmont Avenue, SR 3045, Bridge Replacement
Project Allocation
11,000,000
(Base Project Allocation - $10,000,000)
(Design & Contingencies - $1,000,000)
(11) Plymouth Township, Narcissa Road over Plymouth Creek, Bridge Replacement
Project Allocation
792,000
(Base Project Allocation - $672,000)
(Design & Contingencies - $120,000)
(12) Abington Township, Forrest Avenue over Tookany Creek, Bridge Replacement
Project Allocation
190,000
(Base Project Allocation - $165,000)
(Design & Contingencies - $25,000)
(13) Springfield Township, East Mill Road over Sunnybrook Creek, also known as Wissahickon Creek, Bridge Replacement
Project Allocation
1,579,000
(Base Project Allocation - $1,397,000)
(Design & Contingencies - $182,000)
(14) Lower Merion Township, Belmont Avenue Bridge over Schuylkill River, Bridge Replacement
Project Allocation
1,130,000
(Base Project Allocation - $1,020,000)
(Land Allocation - $8,000)
(Design & Contingencies - $102,000)
(15) Lower Salford Township, Bergeys Mill Road 14G09 over East Branch of Perkiomen Creek, Bridge Replacement
Project Allocation
1,086,000
(Base Project Allocation - $980,000)
(Land Allocation - $8,000)
(Design & Contingencies - $98,000)
(16) Upper Dublin Township, Butler Pike Bridge over Wissahickon Creek, Bridge Replacement
Project Allocation
1,086,000
(Base Project Allocation - $980,000)
(Land Allocation - $8,000)
(Design & Contingencies - $98,000)
(17) Lower Salford Township, Camp Wawa Road over East Branch of Perkiomen Creek, Bridge Replacement
Project Allocation
1,132,000
(Base Project Allocation - $1,020,000)
(Land Allocation - $10,000)
(Design & Contingencies - $102,000)
(18) Lower Merion Township, Conshohocken State Road Bridge over Mill Creek, Bridge Replacement
Project Allocation
1,222,000
(Base Project Allocation - $1,100,000)
(Land Allocation - $10,000)
(Design & Contingencies - $112,000)
(19) Abington Township, Easton Road, North Susquehanna Road over Sandy Run, Bridge Replacement
Project Allocation
1,024,000
(Base Project Allocation - $1,001,000)
(Land Allocation - $12,000)
(Design & Contingencies - $11,000)
(20) Cheltenham Township, Easton Road to SR 0152 over Church Road, Bridge Replacement
Project Allocation
1,119,000
(Base Project Allocation - $1,100,000)
(Land Allocation - $8,000)
(Design & Contingencies - $11,000)
(21) Cheltenham Township, Easton Road over Branch of Tacony Creek, Bridge Replacement
Project Allocation
106,000
(Base Project Allocation - $86,000)
(Land Allocation - $10,000)
(Design & Contingencies - $10,000)
(22) Limerick Township, Fruitville Road over Hartenstein Creek, Bridge Replacement
Project Allocation
859,000
(Base Project Allocation - $750,000)
(Land Allocation - $9,000)
(Design & Contingencies - $100,000)
(23) Limerick Township, Fruitville Road, Route 422 over Hartenstein Creek, Bridge Replacement
Project Allocation
1,160,000
(Base Project Allocation - $1,000,000)
(Land Allocation - $10,000)
(Design & Contingencies - $150,000)
(24) East Norriton Township, Germantown Pike 27961 over Branch of Stony Creek, Bridge Replacement
Project Allocation
1,164,000
(Base Project Allocation - $1,050,000)
(Land Allocation - $9,000)
(Design & Contingencies - $105,000)
(25) East Norriton Township, Germantown Pike 27975 over Branch of Stony Creek, Bridge Replacement
Project Allocation
1,109,000
(Base Project Allocation - $1,000,000)
(Land Allocation - $9,000)
(Design & Contingencies - $100,000)
(26) Lower Merion Township, Roberts Road over Mill Creek, Bridge Replacement
Project Allocation
1,090,000
(Base Project Allocation - $980,000)
(Land Allocation - $12,000)
(Design & Contingencies - $98,000)
(27) New Hanover Township, Lutheran Road Bridge over Minister Creek, Bridge Replacement
Project Allocation
1,110,000
(Base Project Allocation - $1,001,000)
(Land Allocation - $8,000)
(Design & Contingencies - $101,000)
(28) Lower Merion Township, Mill Creek Bridge over Mill Creek, Bridge Replacement
Project Allocation
1,153,000
(Base Project Allocation - $1,040,000)
(Land Allocation - $9,000)
(Design & Contingencies - $104,000)
(29) Abington Township, Moredon Road over Pennypack Creek, Bridge Replacement
Project Allocation
1,000,000
(Base Project Allocation - $980,000)
(Land Allocation - $8,000)
(Design & Contingencies - $12,000)
(30) Lower Merion Township, Old Gulph Road over Mill Creek, Bridge Replacement
Project Allocation
1,159,000
(Base Project Allocation - $1,050,000)
(Land Allocation - $9,000)
(Design & Contingencies - $100,000)
(31) Lower Merion Township, Old Gulph Road Bridge over Mill Creek, Bridge Replacement
Project Allocation
1,159,000
(Base Project Allocation - $1,050,000)
(Land Allocation - $9,000)
(Design & Contingencies - $100,000)
(32) Cheltenham Township, Rices Mill, Glenside over Branch of Tacony Creek, Bridge Replacement
Project Allocation
761,000
(Base Project Allocation - $740,000)
(Land Allocation - $10,000)
(Design & Contingencies - $11,000)
(33) Lower Merion Township, Rose Glen Road over Mill Creek, Bridge Replacement
Project Allocation
1,193,000
(Base Project Allocation - $1,075,000)
(Land Allocation - $10,000)
(Design & Contingencies - $108,000)
(34) Norristown Borough, Sterigere, Markley 28K06 over Branch of Stony Creek, Bridge Replacement
Project Allocation
1,110,000
(Base Project Allocation - $1,001,000)
(Land Allocation - $8,000)
(Design & Contingencies - $101,000)
(35) Cheltenham Township, Waverly Road over Tookany Creek, Bridge Replacement
Project Allocation
959,000
(Base Project Allocation - $941,000)
(Land Allocation - $8,000)
(Design & Contingencies - $10,000)
(36) West Conshohocken Borough, Woodmont Road over Arrowmink Creek, Bridge Replacement
Project Allocation
1,132,000
(Base Project Allocation - $1,020,000)
(Land Allocation - $10,000)
(Design & Contingencies - $102,000)
(37) Whitpain Township, Pulaski Drive over Central Branch of Stony Creek, Bridge Replacement
Project Allocation
2,150,000
(Base Project Allocation - $1,700,000)
(Design & Contingencies - $450,000)
(38) Whitpain Township, Jolly Road over Mermaid Run, Bridge Replacement
Project Allocation
2,150,000
(Base Project Allocation - $1,700,000)
(Design & Contingencies - $450,000)
(39) Lower Merion Township, Remington Road over West Branch of Indian Creek, Bridge Replacement
Project Allocation
1,655,000
(Base Project Allocation - $1,180,000)
(Design & Contingencies - $475,000)
(40) Lower Merion Township, Rockland Avenue over Amtrak's Keystone Corridor/SEPTA Paoli-Thorndale Line, Bridge Replacement
Project Allocation
1,000,000
(Base Project Allocation - $750,000)
(Design & Contingencies - $250,000)
(41) Lower Merion Township, Conshohocken State Road over Mill Creek, Bridge Restoration and Replacement
Project Allocation
1,222,000
(Base Project Allocation - $1,100,000)
(Land Allocation - $10,000)
(Design & Contingencies - $112,000)
(42) Lower Merion Township, Old Gulph Road over Mill Creek, Bridge Restoration and Replacement
Project Allocation
1,159,000
(Base Project Allocation - $1,050,000)
(Land Allocation - $9,000)
(Design & Contingencies - $100,000)
(43) Lower Merion Township, Gulph Road and Roberts Road over Mill Creek, Bridge Restoration and Replacement
Project Allocation
1,090,000
(Base Project Allocation - $980,000)
(Land Allocation - $12,000)
(Design & Contingencies - $98,000)
(44) Lower Merion Township, Remington Road over West Branch of Indian Creek, Bridge Replacement
Project Allocation
1,655,000
(Base Project Allocation - $1,180,000)
(Design & Contingencies - $475,000)
(45) Lower Merion Township, Violet Lane over East Branch of Indian Creek, Bridge Replacement
Project Allocation
1,035,000
(Base Project Allocation - $710,000)
(Design & Contingencies - $325,000)
(46) Montgomery Township, LR 646, Stump Road over Little Neshaminy Creek, Bridge Restoration or Replacement, Bridge Key 27883
Project Allocation
1,110,000
(Base Project Allocation - $1,000,000)
(Land Allocation - $10,000)
(Design & Contingencies - $100,000)
(47) Hatfield Borough, Vine Street over West Branch of Neshaminy Creek, Bridge Rehabilitation, Restoration or Replacement, Bridge No.46740900500040
Project Allocation
1,350,000
(Base Project Allocation - $1,000,000)
(Design & Contingencies - $350,000)
(48) Salford Township, County Bridge No.295, Dietz Mill Road over Ridge Valley Creek, Bridge Restoration or Replacement, Bridge Key 27942
Project Allocation
1,142,000
(Base Project Allocation - $1,030,000)
(Land Allocation - $9,000)
(Design & Contingencies - $103,000)
(49) Upper Dublin Township, Twinning Road over Sandy Run, Bridge Rehabilitation, Bridge No.46710900400000
Project Allocation
1,250,000
(Base Project Allocation - $1,000,000)
(Design & Contingencies - $250,000)
(50) Upper Dublin Township, Camp Hill Road over Pine Run, Bridge Rehabilitation, Bridge No.46710900300000
Project Allocation
1,250,000
(Base Project Allocation - $1,000,000)
(Design & Contingencies - $250,000)
(51) Upper Dublin Township, Virginia Drive over Pine Run, Bridge Rehabilitation, Bridge No.46710900100000
Project Allocation
1,875,000
(Base Project Allocation - $1,500,000)
(Design & Contingencies - $375,000)
(52) Upper Dublin Township, Virginia Drive over Pine Run, Bridge Rehabilitation, Bridge No.46710900200000
Project Allocation
1,875,000
(Base Project Allocation - $1,500,000)
(Design & Contingencies - $375,000)
(53) Upper Dublin Township, Delaware Avenue over Rapp Run, Bridge Rehabilitation
Project Allocation
2,500,000
(Base Project Allocation - $2,000,000)
(Design & Contingencies - $500,000)
(54) Hatfield Borough, Vine Street over West Branch of Neshaminy Creek, Bridge Rehabilitation, Restoration or Replacement, Bridge No.46704601200114
Project Allocation
2,150,000
(Base Project Allocation - $1,700,000)
(Design & Contingencies - $450,000)
(55) Salford Township, County Bridge 294, King Road over Ridge Valley Creek, Bridge Restoration or Replacement, Bridge Key 27944
Project Allocation
1,130,000
(Base Project Allocation - $1,020,000)
(Land Allocation - $8,000)
(Design & Contingencies - $102,000)
(56) Horsham Township, Keith Valley Road over Park Creek, Bridge Restoration or Replacement, Bridge Key 28000
Project Allocation
1,164,000
(Base Project Allocation - $1,050,000)
(Land Allocation - $9,000)
(Design & Contingencies - $105,000)
(57) Horsham Township, Davis Grove Road over Park Creek, Bridge Restoration or Replacement, Bridge Key 27998
Project Allocation
1,109,000
(Base Project Allocation - $1,000,000)
(Land Allocation - $9,000)
(Design & Contingencies - $100,000)
(58) Whitpain Township, Pulaski Drive over Central Branch of Stony Creek, Bridge Replacement
Project Allocation
2,150,000
(Base Project Allocation - $1,700,000)
(Design & Contingencies - $450,000)
(59) Whitpain Township, Jolly Road over Mermaid Run, Bridge Replacement
Project Allocation
2,150,000
(Base Project Allocation - $1,700,000)
(Design & Contingencies - $450,000)
(60) Upper Gwynedd Township, PA 363, Valley Forge Road over Towamensing Creek, Bridge Replacement
Project Allocation
4,100,000
(Base Project Allocation - $3,500,000)
(Land Allocation - $300,000)
(Design & Contingencies - $300,000)
(61) (Reserved).
(62) Plymouth Township, County Bridge No.199, Germantown Pike over Saw Mill Creek, Bridge Rehabilitation or Replacement, Bridge Key 27977
Project Allocation
999,000
(Base Project Allocation - $879,000)
(Land Allocation - $10,000)
(Design & Contingencies - $110,000)
(63) Whitpain Township, Yost Road over Central Branch of Stony Creek, Bridge Replacement
Project Allocation
1,875,000
(Base Project Allocation - $1,500,000)
(Design & Contingencies - $375,000)
(64) Lower Salford Township, Groffs Mill Road, Bridge Rehabilitation or Replacement, BMS 46720900800000
Project Allocation
340,000
(Base Project Allocation - $250,000)
(Design & Contingencies - $90,000)
(65) Lower Salford Township, Wambold Road, Bridge Rehabilitation or Replacement, BMS 46720904030002
Project Allocation
475,000
(Base Project Allocation - $350,000)
(Design & Contingencies - $125,000)
(66) Lower Salford Township, Store Road, Bridge Rehabilitation or Replacement, BMS 46720904030004
Project Allocation
550,000
(Base Project Allocation - $450,000)
(Design & Contingencies - $100,000)
(67) Lower Salford Township, Indian Creek Road, Bridge Rehabilitation or Replacement, BMS 46720904310003
Project Allocation
475,000
(Base Project Allocation - $350,000)
(Design & Contingencies - $125,000)
(68) Lower Salford Township, Camp Wawa Road, Bridge Rehabilitation or Replacement, Bridge Key 27915
Project Allocation
761,000
(Base Project Allocation - $740,000)
(Land Allocation - $10,000)
(Design & Contingencies - $11,000)
(69) Marlborough Township, Price Road, Bridge Rehabilitation or Replacement, Bridge Key 27945
Project Allocation
1,217,000
(Base Project Allocation - $1,100,000)
(Land Allocation - $5,000)
(Design & Contingencies - $112,000)
(70) Lower Frederick Township, Simmons Road, Bridge Rehabilitation or Replacement, Bridge Key 27922
Project Allocation
1,158,000
(Base Project Allocation - $1,050,000)
(Land Allocation - $8,000)
(Design & Contingencies - $100,000)
(71) Upper Frederick Township, Green Lane Road, Bridge Rehabilitation or Replacement, Bridge Key 27943
Project Allocation
1,164,000
(Base Project Allocation - $1,050,000)
(Land Allocation - $9,000)
(Design & Contingencies - $105,000)
(72) Upper Salford Township, Old Sumneytown Pike, Bridge Rehabilitation or Replacement, Bridge Key 27958
Project Allocation
1,086,000
(Base Project Allocation - $980,000)
(Land Allocation - $8,000)
(Design & Contingencies - $98,000)
(73) Upper Salford Township, Moyer Road, Bridge Rehabilitation or Replacement, Bridge Key 27956
Project Allocation
1,110,000
(Base Project Allocation - $1,000,000)
(Land Allocation - $10,000)
(Design & Contingencies - $100,000)
(74) Upper Salford Township, Rostkowski Road, Bridge Rehabilitation or Replacement, Bridge Key 27940
Project Allocation
1,104,000
(Base Project Allocation - $995,000)
(Land Allocation - $9,000)
(Design & Contingencies - $100,000)
(75) New Hanover Township, Deep Creek Road, Bridge Rehabilitation or Replacement, Bridge Key 27938
Project Allocation
1,109,000
(Base Project Allocation - $1,000,000)
(Land Allocation - $9,000)
(Design & Contingencies - $100,000)
(76) Douglass Township, Paper Mill Road, Bridge Rehabilitation or Replacement, Bridge Key 27926
Project Allocation
1,193,000
(Base Project Allocation - $1,075,000)
(Land Allocation - $10,000)
(Design & Contingencies - $108,000)
(77) Skippack Township, Garges Road, Bridge Rehabilitation or Replacement, Bridge Key 27953
Project Allocation
1,110,000
(Base Project Allocation - $1,001,000)
(Land Allocation - $8,000)
(Design & Contingencies - $101,000)
(78) Salford Township, King Road, Bridge Rehabilitation or Replacement, Bridge Key 27944
Project Allocation
1,130,000
(Base Project Allocation - $1,020,000)
(Land Allocation - $8,000)
(Design & Contingencies - $102,000)
(79) Salford Township, Dietz Mill Road, Bridge Rehabilitation or Replacement, Bridge Key 27942
Project Allocation
1,142,000
(Base Project Allocation - $1,030,000)
(Land Allocation - $9,000)
(Design & Contingencies - $103,000)
(80) (Reserved).
(81) (Reserved).
(82) (Reserved).
(83) (Reserved).
(84) (Reserved).
(85) (Reserved).
(86) (Reserved).
(87) (Reserved).
(88) Lower Merion Township, Old Gulph Road over Mill Creek, Bridge Restoration or Replacement
Project Allocation
1,159,000
(Base Project Allocation - $1,050,000)
(Land Allocation - $9,000)
(Design & Contingencies - $100,000)
(89) (Reserved).
(90) (Reserved).
(91) Lower Merion Township, Remington Road over East Branch of Indian Creek, Bridge Replacement
Project Allocation
1,655,000
(Base Project Allocation - $1,180,000)
(Design & Contingencies - $475,000)
(92) (Reserved).
(93) (Reserved).
(94) Norristown Borough, Sterigere Street over Stony Creek, Bridge Restoration or Replacement
Project Allocation
1,110,000
(Base Project Allocation - $1,001,000)
(Land Allocation - $8,000)
(Design & Contingencies - $101,000)
(95) Lower Merion Township, Union Avenue over SEPTA Cynwyd Line, Bridge Replacement
Project Allocation
5,000,000
(Base Project Allocation - $5,000,000)
(96) (Reserved).
(97) (Reserved).
(Design & Contingencies - $102,000)
(98) Whitpain Township, Yost Road over Central Branch of Stony Creek, Bridge Replacement
Project Allocation
1,875,000
(Base Project Allocation - $1,500,000)
(Design & Contingencies - $375,000)
(99) Upper Providence Township, Ashenfelter Road over Crossmans Run, Bridge Replacement
Project Allocation
380,000
(Base Project Allocation - $300,000)
(Design & Contingencies - $80,000)
(100) (Reserved).
(101) (Reserved).
(102) (Reserved).
(103) New Hanover Township, Deep Creek Road over Deep Creek, Bridge Restoration or Replacement
Project Allocation
1,110,000
(Base Project Allocation - $10,000)
(Land Allocation - $100,000)
(Design & Contingencies - $1,000,000)
(104) (Reserved).
(105) Salford Township, Dietz Mill Road over Ridge Valley Creek, Bridge Restoration or Replacement
Project Allocation
1,245,000
(Base Project Allocation - $10,000)
(Land Allocation - $110,000)
(Design & Contingencies - $1,125,000)
(106) Upper Frederick Township, Faust Road over Scioto Creek, Bridge Restoration or Replacement
Project Allocation
1,151,000
(Base Project Allocation - $7,000)
(Land Allocation - $104,000)
(Design & Contingencies - $1,040,000)
(107) (Reserved).
(108) Skippack Township, Garges Road over East Branch of Perkiomen Creek, Bridge Restoration or Replacement
Project Allocation
1,040,000
(Base Project Allocation - $10,000)
(Land Allocation - $155,000)
(Design & Contingencies - $875,000)
(109) Upper Frederick Township, Green Lane Road over Deep Creek, Bridge Restoration or Replacement
Project Allocation
1,109,000
(Base Project Allocation - $9,000)
(Land Allocation - $100,000)
(Design & Contingencies - $1,000,000)
(110) Upper Providence Township, Hopwood Road over Norma Run, Bridge Replacement
Project Allocation
500,000
(Base Project Allocation - $400,000)
(Design & Contingencies - $100,000)
(111) (Reserved).
(112) (Reserved).
(113) Hatfield Township, Maple Avenue over Branch of West Branch of Neshaminy Creek, Bridge Replacement
Project Allocation
600,000
(Base Project Allocation - $450,000)
(Design & Contingencies - $150,000)
(114) Upper Salford Township, Moyer Road over East Branch of Perkiomen Creek, Bridge Restoration or Replacement
Project Allocation
1,130,000
(Base Project Allocation - $8,000)
(Land Allocation - $102,000)
(Design & Contingencies - $1,020,000)
(115) Upper Salford Township, Old Sumneytown Pike over East Branch of Perkiomen Creek, Bridge Restoration or Replacement
Project Allocation
1,193,000
(Base Project Allocation - $10,000)
(Land Allocation - $108,000)
(Design & Contingencies - $1,075,000)
(116) Douglass Township, Paper Mill Road over Perkiomen Creek, Bridge Restoration or Replacement
Project Allocation
1,160,000
(Base Project Allocation - $10,000)
(Land Allocation - $145,000)
(Design & Contingencies - $1,005,000)
(117) Marlborough Township, Price Road over Unami Creek, Bridge Restoration or Replacement
Project Allocation
1,105,000
(Base Project Allocation - $5,000)
(Land Allocation - $105,000)
(Design & Contingencies - $995,000)
(118) Towamencin Township, Rittenhouse Road over Skippack Creek, Bridge Restoration or Replacement
Project Allocation
1,164,000
(Base Project Allocation - $9,000)
(Land Allocation - $105,000)
(Design & Contingencies - $1,050,000)
(119) Upper Salford Township, Rostkowski Road over Ridge Valley Creek, Bridge Restoration or Replacement
Project Allocation
1,149,000
(Base Project Allocation - $10,000)
(Land Allocation - $124,000)
(Design & Contingencies - $1,015,000)
(120) Lower Frederick Township, Simmons Road over Scioto Creek, Bridge Restoration or Replacement
Project Allocation
1,158,000
(Base Project Allocation - $8,000)
(Land Allocation - $100,000)
(Design & Contingencies - $1,050,000)
(121) Hatfield Township, Trewigtown Road over Tributary of Neshaminy Creek, Bridge Replacement
Project Allocation
775,000
(Base Project Allocation - $600,000)
(Design & Contingencies - $175,000)
(122) Upper Dublin Township, Twining Road over Sandy Run, Bridge Replacement
Project Allocation
1,250,000
(Base Project Allocation - $1,000,000)
(Design & Contingencies - $250,000)
(123) (Reserved).
(124) Hatfield Township, Walnut Street over Branch of West Branch of Neshaminy Creek, Bridge Replacement
Project Allocation
1,509,000
(Base Project Allocation - $1,255,000)
(Design & Contingencies - $254,000)
(125) Hatfield Borough, Lincoln Avenue over West Branch of Neshaminy Creek, Bridge Replacement
Project Allocation
1,350,000
(Base Project Allocation - $1,000,000)
(Design & Contingencies - $350,000)
(126) Hatfield Borough, Vine Street over West Branch of Neshaminy Creek, Bridge Replacement
Project Allocation
2,150,000
(Base Project Allocation - $1,700,000)
(Design & Contingencies - $450,000)
(127) (Reserved).
(128) Horsham Township, Davis Grove Road over Park Creek, Bridge Restoration or Replacement
Project Allocation
1,109,000
(Base Project Allocation - $9,000)
(Land Allocation - $100,000)
(Design & Contingencies - $1,000,000)
(129) Horsham Township, Keith Valley Road over Park Creek, Bridge Restoration or Replacement
Project Allocation
1,164,000
(Base Project Allocation - $9,000)
(Land Allocation - $105,000)
(Design & Contingencies - $1,050,000)
(130) Franconia Township, Keller Creamery Road over Indian Creek, Bridge Restoration or Replacement
Project Allocation
1,132,000
(Base Project Allocation - $10,000)
(Land Allocation - $102,000)
(Design & Contingencies - $1,020,000)
(131) Hatboro Borough, Moreland Avenue over Branch of Pennypack Creek, Bridge Restoration or Replacement
Project Allocation
1,217,000
(Base Project Allocation - $5,000)
(Land Allocation - $112,000)
(Design & Contingencies - $1,100,000)
(132) Upper Salford Township, Moyer Road over East Branch of Perkiomen Creek, Bridge Restoration or Replacement
Project Allocation
1,130,000
(Base Project Allocation - $8,000)
(Land Allocation - $102,000)
(Design & Contingencies - $1,020,000)
(133) Whitpain Township, Penllyn Pike over Wissahickon Creek, Bridge Restoration or Replacement
Project Allocation
1,142,000
(Base Project Allocation - $9,000)
(Land Allocation - $103,000)
(Design & Contingencies - $1,030,000)
(134) (Reserved).
(135) Upper Gwynedd Township, Sumneytown Pike over Towamencin Creek, Bridge Restoration or Replacement
Project Allocation
1,158,000
(Base Project Allocation - $8,000)
(Land Allocation - $100,000)
(Design & Contingencies - $1,050,000)
(136) Upper Gwynedd Township, Swedesford Road over Wissahickon Creek, Bridge Restoration or Replacement
Project Allocation
1,151,000
(Base Project Allocation - $7,000)
(Land Allocation - $104,000)
(Design & Contingencies - $1,040,000)
(137) Lower Gwynedd Township, Plymouth Road, County Bridge No.077 over Wissahickon Creek, Bridge Key 27946, Bridge Rehabilitation or Replacement
Project Allocation
939,000
(Base Project Allocation - $779,000)
(Land Allocation - $10,000)
(Design & Contingencies - $150,000)
(138) Various Municipalities, Various Local Bridges over Various Spans, Bridge Preservation, Bridge Key 0, Project ID 0
Project Allocation
1,100,000
(Base Project Allocation - $1,000,000)
(Design & Contingencies - $100,000)
(b) State Bridges
(1) Ridge Pike 300 Feet Southeast of Pennsylvania Turnpike 3367-K4 over Norfolk Southern Railroad, Plymouth Township, Bridge Rehabilitation, Bridge Key 28031, Project ID 48175
Project Allocation
3,929,000
(Base Project Allocation - $2,300,000)
(Land Allocation - $629,000)
(Design & Contingencies - $1,000,000)
(2) New Connection between Ridge Pike and Germantown Pike over Perkiomen Creek, Collegeville Borough, Lower Providence Township, Bridge Construction, Bridge Key 0, Project ID 102273
Project Allocation
29,372,000
(Base Project Allocation - $29,372,000)
(3) Pleasant View Road over Sanatoga Creek, Lower Pottsgrove Township, Bridge Replacement, Bridge Key 27833, Project ID 92637
Project Allocation
512,000
(Base Project Allocation - $512,000)
(4) New Second Street over Tacony Creek, Cheltenham Township, Bridge Rehabilitation, Bridge Key 27681, Project ID 92184
Project Allocation
1,200,000
(Base Project Allocation - $1,200,000)
(5) Gravel Pike over Swamp Creek, Lower Frederick Township, Bridge Replacement, Bridge Key 27162, Project ID 93015
Project Allocation
7,500,000
(Base Project Allocation - $7,500,000)
(6) Skippack Pike over Skippack Creek, Skippack Township, Bridge Replacement, Bridge Key 27201, Project ID 92807
Project Allocation
3,000,000
(Base Project Allocation - $3,000,000)
(7) Schuylkill Expressway 2.0 Miles West of Gladwyne 35K06 over Waverly Road, T669, Lower Merion Township, Bridge Rehabilitation, Bridge Key 27263, Project ID 90100
Project Allocation
523,000
(Base Project Allocation - $412,000)
(Design & Contingencies - $111,000)
(8) Schuylkill Expressway 1.0 Mile West of Gladwyne Extension 36B08 over Mill Creek and Mill Creek Road, Lower Merion Township, Bridge Rehabilitation, Bridge Key 27264, Project ID 91571
Project Allocation
682,000
(Base Project Allocation - $537,000)
(Design & Contingencies - $145,000)
(9) Schuylkill Expressway West, City Avenue Interchange 40J01 over Righters Ferry Road, Lower Merion Township, Bridge Rehabilitation, Bridge Key 27285, Project ID 90099
Project Allocation
858,000
(Base Project Allocation - $626,000)
(Design & Contingencies - $232,000)
(10) Ridge Pike Southeast of Norristown over Pennsylvania Turnpike, I-276, DB-116, Norristown Borough, Bridge Rehabilitation, Bridge Key 28157, Project ID 48175
Project Allocation
3,929,000
(Base Project Allocation - $2,300,000)
(Land Allocation - $629,000)
(Design & Contingencies - $1,000,000)
(11) West King Street over Manatawny Creek, Pottstown Borough, Bridge Replacement, Bridge Key 27508, Project ID 78736
Project Allocation
572,000
(Base Project Allocation - $572,000)
(12) Ridge Pike 3368-B5 1.0 Mile Northwest of Butler 29F11 over Access Road, Plymouth Creek, Plymouth Township, Bridge Rehabilitation, Bridge Key 27770, Project ID 48175
Project Allocation
3,929,000
(Base Project Allocation - $2,300,000)
(Land Allocation - $629,000)
(Design & Contingencies - $1,000,000)
(13) Egypt Road near Reading Railroad 27B05 over Crossmans Run, Upper Providence Township, Bridge Replacement, Bridge Key 27774, Project ID 92311
Project Allocation
2,000
(Base Project Allocation - $1,000)
(Design & Contingencies - $1,000)
(14) Second Avenue 1.0 Mile South of Daves House 3252-G4 over Branch of Mingo Creek, Upper Providence Township, Bridge Replacement, Bridge Key 27805, Project ID 92311
Project Allocation
444,000
(Base Project Allocation - $380,000)
(Design & Contingencies - $64,000)
(15) Ridge Pike 300 Feet Southeast of Pennsylvania Turnpike 3367-K4 over Norfolk Southern Railroad, Plymouth Township, Bridge Rehabilitation, Bridge Key 28031, Project ID 48175
Project Allocation
3,929,000
(Base Project Allocation - $2,300,000)
(Land Allocation - $629,000)
(Design & Contingencies - $1,000,000)
(16) Ridge Pike 29F12 over Mid-County Expressway, Plymouth Township, Bridge Rehabilitation, Bridge Key 27482, Project ID 48175
Project Allocation
3,929,000
(Base Project Allocation - $2,300,000)
(Land Allocation - $629,000)
(Design & Contingencies - $1,000,000)
(17) SR 0001, City Avenue over SEPTA Cynwyd Line, Lower Merion Township, Bridge Rehabilitation
Project Allocation
1,000,000
(Base Project Allocation - $800,000)
(Design & Contingencies - $200,000)
(18) SR 3039, North Gulph Road over Abrams Run, Upper Merion Township, Bridge Replacement, Bridge Key 27750, Project ID 90130
Project Allocation
3,000,000
(Base Project Allocation - $2,500,000)
(Land Allocation - $250,000)
(Design & Contingencies - $250,000)
(19) Ashmead Road Bridge over Tookany Creek, Cheltenham Township, Bridge Rehabilitation, Restoration or Replacement
Project Allocation
3,522,000
(Base Project Allocation - $3,522,000)
(20) Camp Hill Road over Pine Run, Upper Dublin Township, Bridge Rehabilitation
Project Allocation
1,250,000
(Base Project Allocation - $1,000,000)
(Design & Contingencies - $250,000)
(21) (Reserved).
(22) Edge Hill Road Bridge over PA 611, Old York Road, Abington Township, Bridge Rehabilitation, Restoration or Replacement
Project Allocation
5,608,000
(Base Project Allocation - $5,608,000)
(23) Limekiln Pike over SEPTA, Abington Township, Bridge Rehabilitation, Restoration or Replacement
Project Allocation
2,400,000
(Base Project Allocation - $2,400,000)
(24) PA 611, Old York Road over SEPTA West Trenton Line, Abington Township, Bridge Rehabilitation, Restoration or Replacement
Project Allocation
11,540,000
(Base Project Allocation - $11,540,000)
(25) Various State-Owned Bridges over Various Spans, Various Municipalities, Bridge Preservation, Bridge Key 0, Project ID 0
Project Allocation
1,100,000
(Base Project Allocation - $1,000,000)
(Design & Contingencies - $100,000)