Northumberland County

Act 127 of 2014, § 53, under HIGHWAY-RAILROAD AND HIGHWAY BRIDGE CAPITAL BUDGET SUPPLEMENTAL ACT FOR 2014-2015 - ENACTMENT.

Act 127 of 2014, § 53

Section 53. Northumberland County.

(a) Local Bridges

Local

State

(1) Delaware Township, T-608 over Warrior Run, Bridge Replacement, Bridge Key 29320, Project ID 88853

Project Allocation

826,000

(Base Project Allocation - $826,000)

(2) Zerbe Township, 10th Street over Zerbe Run, Bridge Replacement, Bridge Key 0, Project ID 89208

Project Allocation

64,000

(Base Project Allocation - $64,000)

(3) (Reserved).

(4) (Reserved).

(5) Coal Township, Bridge No.113 over Shamokin Creek, Bridge Rehabilitation or Replacement, BMS 49710100000113

Project Allocation

703,000

(Base Project Allocation - $703,000)

(6) Ralpho Township, T-764, Bridge No.183 over Millers Run, Bridge Rehabilitation or Replacement, BMS 49721207640183

Project Allocation

285,000

(Base Project Allocation - $285,000)

(7) Ralpho Township, T-798, Bridge No.142 IC over South Branch of Roaring Creek, Bridge Rehabilitation or Replacement, BMS 49721207980142

Project Allocation

382,000

(Base Project Allocation - $382,000)

(8) Ralpho Township, T-800, Bridge No.56 IC over South Branch of Roaring Creek, Bridge Rehabilitation or Replacement, BMS 49721208000056

Project Allocation

642,000

(Base Project Allocation - $642,000)

(9) Ralpho Township, T-802, Bridge No.50 IC over South Branch of Roaring Creek, Bridge Rehabilitation or Replacement, BMS 49721208020050

Project Allocation

613,000

(Base Project Allocation - $613,000)

(10) Shamokin Township, Bridge No.195, Unnamed Route over Shamokin Creek, Bridge Rehabilitation or Replacement, BMS 49721500000195

Project Allocation

636,000

(Base Project Allocation - $636,000)

(11) Shamokin Township, T-485, Bridge No.152 over Lick Run, Bridge Rehabilitation or Replacement, BMS 49721504850152

Project Allocation

236,000

(Base Project Allocation - $236,000)

(12) Upper Mahanoy Township, T-454, Bridge No.121 over Schwaben Creek, Bridge Rehabilitation or Replacement, BMS 49721804540121

Project Allocation

287,000

(Base Project Allocation - $287,000)

(13) Upper Mahanoy Township, T-460, Bridge No.32 over Schwaben Creek, Bridge Rehabilitation or Replacement, BMS 49721804600032

Project Allocation

261,000

(Base Project Allocation - $261,000)

(14) Upper Mahanoy Township, T-482, Bridge No.122 over Schwaben Creek, Bridge Rehabilitation or Replacement, BMS 49721804800122

Project Allocation

228,000

(Base Project Allocation - $228,000)

(15) Washington Township, T-387, Bridge No.26 over Schwaben Creek, Bridge Rehabilitation or Replacement, BMS 49721903870026

Project Allocation

335,000

(Base Project Allocation - $335,000)

(16) Washington Township, T-430, Bridge No.124 over Schwaben Creek, Bridge Rehabilitation or Replacement, BMS 49721904300124

Project Allocation

338,000

(Base Project Allocation - $338,000)

(17) Washington Township, T-456, Bridge No.7 over Schwaben Creek, Bridge Rehabilitation or Replacement, BMS 49721904560007

Project Allocation

368,000

(Base Project Allocation - $368,000)

(18) Zerbe Township, 8th Street, Bridge No.143 over Zerbe Run, Bridge Rehabilitation or Replacement, BMS 49722200080143

Project Allocation

280,000

(Base Project Allocation - $280,000)

(19) City of Shamokin, Sixth Street, Bridge No.98 over Shamokin Creek, Bridge Rehabilitation or Replacement, BMS 49730100060098

Project Allocation

714,000

(Base Project Allocation - $714,000)

(20) City of Shamokin, Eighth Street, Bridge No.73 over Shamokin Creek, Bridge Rehabilitation or Replacement, BMS 49730100080073

Project Allocation

725,000

(Base Project Allocation - $725,000)

(21) City of Shamokin, Arch Street, Bridge No.160 over Carbon Run, Bridge Rehabilitation or Replacement, BMS 49730101800160

Project Allocation

494,000

(Base Project Allocation - $494,000)

(22) City of Shamokin, Chestnut Street, Bridge No.103 over Carbon Run, Bridge Rehabilitation or Replacement, BMS 49730103200103

Project Allocation

494,000

(Base Project Allocation - $494,000)

(23) City of Shamokin, Liberty Street, Bridge No.163 over Shamokin Creek, Bridge Rehabilitation or Replacement, BMS 49730112250163

Project Allocation

751,000

(Base Project Allocation - $751,000)

(24) City of Shamokin, Spruce Street, Bridge No.184 over Carbon Run, Bridge Rehabilitation or Replacement, BMS 49730119030184

Project Allocation

311,000

(Base Project Allocation - $311,000)

(25) City of Shamokin, Shamokin Street, Bridge No.21 over Shamokin Creek, Bridge Rehabilitation or Replacement, BMS 49730119110021

Project Allocation

707,000

(Base Project Allocation - $707,000)

(26) City of Shamokin, West Walnut Street, Bridge No.88 over Shamokin Creek, Bridge Rehabilitation or Replacement, BMS 49730123200088

Project Allocation

742,000

(Base Project Allocation - $742,000)

(27) Ralpho Township, T-764, Bridge No.182 over Millers Run, Bridge Rehabilitation or Replacement

Project Allocation

285,000

(Base Project Allocation - $285,000)

(28) Delaware Township, T-712, Bridge No.71 over Delaware Run, Bridge Rehabilitation or Replacement, BMS 49720106300071

Project Allocation

428,000

(Base Project Allocation - $428,000)

(29) Delaware Township, T-606, Bridge No.97 over Delaware Run, Bridge Rehabilitation or Replacement, BMS 49720106440097

Project Allocation

332,000

(Base Project Allocation - $332,000)

(30) Delaware Township, T-606, Bridge No.193 over Delaware Run, Bridge Rehabilitation or Replacement, BMS 49720106440193

Project Allocation

231,000

(Base Project Allocation - $231,000)

(31) Delaware Township, T-507, Bridge No.104 over Delaware Run, Bridge Rehabilitation or Replacement, BMS 49720106480104

Project Allocation

256,000

(Base Project Allocation - $256,000)

(32) Jackson Township, T-353, Bridge No.12 over Fidlers Run, Bridge Rehabilitation or Replacement, BMS 49720403530012

Project Allocation

251,000

(Base Project Allocation - $251,000)

(33) Jackson Township, T-355, Bridge No.100 over Mouse Creek, Rehabilitation or Replacement, BMS 49720403550100

Project Allocation

251,000

(Base Project Allocation - $251,000)

(34) Jackson Township, T-359, Bridge No.35 over Mouse Creek, Rehabilitation or Replacement, BMS 49720403590035

Project Allocation

260,000

(Base Project Allocation - $260,000)

(35) Lewis Township, T-639, Bridge No.117 over Warrior Run, Rehabilitation or Replacement, BMS 49720606390117

Project Allocation

435,000

(Base Project Allocation - $435,000)

(36) Lewis Township, T-658, Bridge No.156 over Warrior Run, Rehabilitation or Replacement, BMS 49720606580156

Project Allocation

415,000

(Base Project Allocation - $415,000)

(37) Lewis Township, T-672, Bridge No.128 over Glade Run, Rehabilitation or Replacement, BMS 49720606720128

Project Allocation

273,000

(Base Project Allocation - $273,000)

(38) Lewis Township, T-672, Bridge No.150 over Glade Run, Rehabilitation or Replacement, BMS 49720606720150

Project Allocation

318,000

(Base Project Allocation - $318,000)

(39) Little Mahanoy Township, T-405, Bridge No.42 over Mahanoy Creek, Rehabilitation or Replacement, BMS 49720704050042

Project Allocation

1,153,000

(Base Project Allocation - $1,153,000)

(40) Lower Augusta Township, T-394, Bridge No.91 over Boile Run, Rehabilitation or Replacement, BMS 49720803940091

Project Allocation

251,000

(Base Project Allocation - $251,000)

(41) Lower Augusta Township, T-394, Bridge No.149 over Hallowing Run, Rehabilitation or Replacement, BMS 49720803940149

Project Allocation

246,000

(Base Project Allocation - $246,000)

(42) Lower Mahanoy Township, T-337, Bridge No.126 over Emerick's Creek, Rehabilitation or Replacement, BMS 49720903370126

Project Allocation

250,000

(Base Project Allocation - $250,000)

(43) Rockefeller Township, T-534, Bridge No.194 over Shamokin Creek, Rehabilitation or Replacement, BMS 49721305340194

Project Allocation

266,000

(Base Project Allocation - $266,000)

(44) Rockefeller Township, T-538, Bridge No.38 over Lower Shamokin Creek, Rehabilitation or Replacement, BMS 49721305380038

Project Allocation

414,000

(Base Project Allocation - $414,000)

(45) Rockefeller Township, T-696, Bridge No.192 over Plum Creek, Rehabilitation or Replacement, BMS 49721306960192

Project Allocation

250,000

(Base Project Allocation - $250,000)

(46) Rockefeller Township, T-720, Bridge No.A-22 over Lower Shamokin Creek, Rehabilitation or Replacement, BMS 49721307200022

Project Allocation

378,000

(Base Project Allocation - $378,000)

(47) Milton Borough, Filbert Street, Bridge No.44 over Limestone Run, Rehabilitation or Replacement, BMS 49740506200044

Project Allocation

708,000

(Base Project Allocation - $708,000)

(48) Snydertown Borough, T-497, Bridge No.84 over Lick Run, Rehabilitation or Replacement, BMS 49740904970084

Project Allocation

252,000

(Base Project Allocation - $252,000)

(49) Snydertown Borough, T-511, Bridge No.165 over Lick Run, Rehabilitation or Replacement, BMS 49740905110165

Project Allocation

357,000

(Base Project Allocation - $357,000)

(50) Various Municipalities, Various Local Bridges over Various Spans, Bridge Preservation, Bridge Key 0, Project ID 0

Project Allocation

1,100,000

(Base Project Allocation - $1,000,000)

(Design & Contingencies - $100,000)

(b) State Bridges

(1) (Reserved).

Project Allocation

244,000

(Base Project Allocation - $180,000)

(Design & Contingencies - $64,000)

(2) TR 147 over T-568 and Chillisquaque Creek, West Chillisquaque Township, Bridge Rehabilitation, Bridge Key 29054, Project ID 94619

Project Allocation

587,000

(Land Allocation - $196,000)

(Design & Contingencies - $391,000)

(3) SR 0061 1.0 Mile North of Weigh Scales over Benny's Run, Shamokin Township, Bridge Rehabilitation, Bridge Key 29001, Project ID 87905

Project Allocation

13,000

(Base Project Allocation - $12,000)

(Design & Contingencies - $1,000)

(4) I-180 Westbound 3.5 Miles South of Muncy over I-180, Township Road T-655, Delaware Township, Bridge Rehabilitation, Bridge Key 29068, Project ID 87578

Project Allocation

86,000

(Base Project Allocation - $76,000)

(Design & Contingencies - $10,000)

(5) SR 0147 0.5 Mile North of Milton over T-589, Turbot Township, Bridge Rehabilitation, Bridge Key 29059, Project ID 87947

Project Allocation

41,000

(Base Project Allocation - $40,000)

(Design & Contingencies - $1,000)

(6) TR 147 Borough of Milton over SR 0254, Turbot Township, Bridge Rehabilitation, Bridge Key 29058, Project ID 87947

Project Allocation

122,000

(Base Project Allocation - $120,000)

(Design & Contingencies - $2,000)

(7) SR 0147 0.5 Mile East of Montandon over SR 0045, West Chillisquaque Township, Bridge Rehabilitation, Bridge Key 29055, Project ID 87947

Project Allocation

101,000

(Base Project Allocation - $100,000)

(Design & Contingencies - $1,000)

(8) SR 0054 2.0 Miles East of Riverside over Logan Run, Rush Township, Bridge Rehabilitation, Bridge Key 28983, Project ID 87907

Project Allocation

31,000

(Base Project Allocation - $30,000)

(Design & Contingencies - $1,000)

(9) SR 0125, TR 125 Southbound over Shamokin Creek, City of Shamokin, Bridge Rehabilitation, Bridge Key 29030, Project ID 87911

Project Allocation

31,000

(Base Project Allocation - $30,000)

(Design & Contingencies - $1,000)

(10) I-180 Eastbound 5.5 Miles South of Muncy over I-180, SR 0054, Delaware Township, Bridge Rehabilitation, Bridge Key 29070, Project ID 87578

Project Allocation

65,000

(Base Project Allocation - $57,000)

(Design & Contingencies - $8,000)

(11) SR 0125 5.0 Miles East of Leck Kill over Tributary of Mahantango Creek, Upper Mahanoy Township, Bridge Rehabilitation, Bridge Key 29025, Project ID 88028

Project Allocation

106,000

(Base Project Allocation - $97,000)

(Design & Contingencies - $9,000)

(12) SR 0147 over Muddy Run, Northumberland Borough, Bridge Rehabilitation, Bridge Key 29049, Project ID 96678

Project Allocation

217,000

(Base Project Allocation - $187,000)

(Land Allocation - $9,000)

(Design & Contingencies - $21,000)

(13) SR 0061 4.0 Miles North of Shamokin over Shamokin Creek, Shamokin Township, Bridge Rehabilitation, Bridge Key 29000, Project ID 87905

Project Allocation

28,000

(Base Project Allocation - $26,000)

(Design & Contingencies - $2,000)

(14) SR 0061 Village of Uniontown over Shamokin Creek, Coal Township, Bridge Rehabilitation, Bridge Key 28999, Project ID 87993

Project Allocation

125,000

(Base Project Allocation - $122,000)

(Design & Contingencies - $3,000)

(15) SR 0054 Village of Elysburg over Deibler Creek, Ralpho Township, Bridge Replacement, Bridge Key 28989, Project ID 88778

Project Allocation

229,000

(Base Project Allocation - $229,000)

(16) T-802 East of Elysburg over South Branch of Roaring Creek, Ralpho Township, Bridge Replacement, Bridge Key 29352, Project ID 93642

Project Allocation

405,000

(Base Project Allocation - $289,000)

(Land Allocation - $15,000)

(Design & Contingencies - $101,000)

(17) SR 0147 Southbound 1.0 Mile East of Milton over Limestone Run, Turbot Township, Bridge Rehabilitation, Bridge Key 29057, Project ID 87947

Project Allocation

41,000

(Base Project Allocation - $40,000)

(Design & Contingencies - $1,000)

(18) PA 44 0.5 Mile North of Watsontown over Dry Run, Delaware Township, Bridge Rehabilitation, Bridge Key 28969, Project ID 88796

Project Allocation

106,000

(Design & Contingencies - $106,000)

(19) SR 0011 Northbound and Southbound 3.0 Miles East of Northumberland over Tributary of North Branch of Susquehanna River, Point Township, Bridge Replacement, Bridge Key 28957, Project ID 63639

Project Allocation

530,000

(Base Project Allocation - $500,000)

(Design & Contingencies - $30,000)

(20) SR 0125, TR 125 Northbound over Shamokin Creek, City of Shamokin, Bridge Rehabilitation, Bridge Key 29029, Project ID 87911

Project Allocation

31,000

(Base Project Allocation - $30,000)

(Design & Contingencies - $1,000)

(21) SR 4002 over Kipps Run, Riverside Borough, Bridge Replacement, Bridge Key 29268, Project ID 93603

Project Allocation

250,000

(Base Project Allocation - $141,000)

(Land Allocation - $52,000)

(Design & Contingencies - $57,000)

(22) SR 4026 2.0 Miles South of Augustaville over Little Shamokin Creek, Rockefeller Township, Bridge Replacement, Bridge Key 29311, Project ID 88047

Project Allocation

1,790,000

(Base Project Allocation - $1,533,000)

(Land Allocation - $52,000)

(Design & Contingencies - $205,000)

(23) SR 4020 1.5 Miles West of Augustaville over Hallowing Run, Lower Augusta Township, Bridge Replacement, Bridge Key 29304, Project ID 93526

Project Allocation

209,000

(Base Project Allocation - $118,000)

(Land Allocation - $44,000)

(Design & Contingencies - $47,000)

(24) SR 4018, T-583 0.5 Mile West of Seven Points over South Branch of Plum Creek, Rockefeller Township, Bridge Replacement, Bridge Key 29300, Project ID 93649

Project Allocation

292,000

(Base Project Allocation - $165,000)

(Land Allocation - $61,000)

(Design & Contingencies - $66,000)

(25) I-180 Westbound 2.0 Miles North of Milton over SR 1007, Delaware Township, Bridge Rehabilitation, Bridge Key 29077, Project ID 87579

Project Allocation

16,000

(Base Project Allocation - $15,000)

(Design & Contingencies - $1,000)

(26) SR 3024 4.0 Miles Southeast of Dalmatia over Tributary of Mahantango Creek, Lower Mahanoy Township, Bridge Replacement, Bridge Key 29263, Project ID 88801

Project Allocation

299,000

(Base Project Allocation - $163,000)

(Land Allocation - $65,000)

(Design & Contingencies - $71,000)

(27) SR 3019 over Tributary of Mahantango Creek, Jordan Township, Bridge Replacement, Bridge Key 29260, Project ID 91996

Project Allocation

350,000

(Base Project Allocation - $175,000)

(Design & Contingencies - $175,000)

(28) SR 2027 2.0 Miles North of Leck Kill over Little Mahantango Creek, Upper Mahanoy Township, Bridge Replacement, Bridge Key 29218, Project ID 88008

Project Allocation

391,000

(Base Project Allocation - $228,000)

(Land Allocation - $49,000)

(Design & Contingencies - $114,000)

(29) School House Road 1.5 Miles West of Weigh Scales over Tributary of Shamokin Creek, Shamokin Township, Bridge Replacement, Bridge Key 29213, Project ID 6766

Project Allocation

30,000

(Base Project Allocation - $16,000)

(Land Allocation - $7,000)

(Design & Contingencies - $7,000)

(30) SR 2002 4.0 Miles East of Riverside Borough over Little Roaring Creek, Rush Township, Bridge Replacement, Bridge Key 29185, Project ID 93517

Project Allocation

244,000

(Base Project Allocation - $180,000)

(Design & Contingencies - $64,000)

(31) SR 1007 over Tributary of Warrior Run Creek, Delaware Township, Bridge Rehabilitation, Bridge Key 29146, Project ID 86448

Project Allocation

70,000

(Base Project Allocation - $50,000)

(Design & Contingencies - $20,000)

(32) SR 1007 over Tributary of Warrior Run Creek, McEwensville Borough, Bridge Replacement, Bridge Key 29143, Project ID 88776

Project Allocation

516,000

(Base Project Allocation - $292,000)

(Land Allocation - $107,000)

(Design & Contingencies - $117,000)

(33) SR 1005 2.0 Miles North of Watsontown over Dry Run, Delaware Township, Bridge Rehabilitation, Bridge Key 29136, Project ID 87994

Project Allocation

163,000

(Base Project Allocation - $131,000)

(Land Allocation - $27,000)

(Design & Contingencies - $5,000)

(34) SR 0487, Village of Paxinos over Shamokin Creek, Ralpho Township, Bridge Rehabilitation, Bridge Key 29111, Project ID 87993

Project Allocation

98,000

(Base Project Allocation - $95,000)

(Design & Contingencies - $3,000)

(35) SR 2008 Village of Elysburg over Unnamed Tributary of Shamokin Creek, Ralpho Township, Bridge Replacement, Bridge Key 29192, Project ID 87990

Project Allocation

1,136,000

(Base Project Allocation - $894,000)

(Land Allocation - $99,000)

(Design & Contingencies - $143,000)

(36) SR 0890 1.0 Mile South of Augustaville over Little Shamokin Creek, Rockefeller Township, Bridge Rehabilitation, Bridge Key 29121, Project ID 88798

Project Allocation

31,000

(Base Project Allocation - $31,000)

(37) SR 0061 over Shamokin Creek, Mount Carmel Borough, Bridge Rehabilitation, Bridge Key 42251, Project ID 87993

Project Allocation

2,000

(Base Project Allocation - $1,000)

(Design & Contingencies - $1,000)

(38) Various State-Owned Bridges over Various Spans, Various Municipalities, Bridge Preservation, Bridge Key 0, Project ID 0

Project Allocation

1,100,000

(Base Project Allocation - $1,000,000)

(Design & Contingencies - $100,000)